IP Library Granted Patent US 9,936,484
Granted Patent B2
US 9,936,484 · App. 14/725,526 · Granted Apr 3, 2018

Control signaling for wireless communication

Inventors: Erlin Zeng (Beijing, CN); Hai Ming Wang (Beijing, CN); Xiangguang Che (Beijing, CN); Chun Yan Gao (Beijing, CN); Peng Chen (Beijing, CN); Jing Han (Beijing, CN); Bernhard Raaf (Neuried, DE)
Assignee: WIRELESS FUTURE TECHNOLOGIES, INC.
H04W72/0406H04L5/0053H04W72/0426H04B7/2606H04W84/047
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,936,484
App. No.
14/725,526
Granted
Apr 3, 2018
Kind
B2
Abstract

In accordance with an example embodiment of the present invention, a method comprises allocating a control channel resource in a wireless relay transmission frame on a wireless relay link; generating a control signaling based on at least one of a resource allocation scheme, a status of the wireless relay link and a traffic condition of the wireless relay link; mapping the control signaling to the allocated control channel resource via at least one of a time-first mapping, a frequency-first mapping, and a multiplexing mapping; and transmitting the control signaling in the allocated control channel resource on the wireless relay link to at least one associated relay node.

Claims (19)

1. An evolved Node-B (eNB) comprising:

a processor configured to:

generate upper layer control signaling including an indication of a location of a control resource located in LTE subframes, the control resource comprising at least one physical resource block (PRB) containing at least one control channel element (CCE) for a device; and

transmit the control signaling to the device, to enable the device to decode the at least one CCE to recover a control channel for the device.

2. The eNB of claim 1 , wherein the processor is further configured to generate control signaling including an indication of a starting symbol that the device should monitor for the at least one CCE in the control resource located in the LTE subframes.

3. The eNB of claim 1 , wherein the device is a relay eNB.

4. The eNB of claim 1 , wherein the at least one PRB is semi-statically allocated.

5. A method for use in an evolved Node-B (eNB), the method comprising:

generating upper layer control signaling including an indication of a location of a control resource located in LTE subframes, the control resource comprising at least one physical resource block (PRB) containing at least one control channel element (CCE) for a device; and

transmitting the control signaling to the device, to enable the device to decode the at least one CCE to recover a control channel for the device.

6. The method of claim 5 , wherein the control signaling includes an indication of a starting symbol that the device should monitor for the at least one CCE in the control resource located in the LTE subframes.

7. The method of claim 5 , wherein the device is a relay eNB.

8. The method of claim 5 , wherein the at least one PRB is semi-statically allocated.

9. A non-transitory computer readable storage medium storing a set of instructions for use by an evolved Node-B (eNB), the set of instructions comprising:

first instructions for generating upper layer control signaling including an indication of a location of a control resource located in LTE subframes, the control resource comprising at least one physical resource block (PRB) containing the at least one control channel element (CCE) for a device; and

second instructions for transmitting the control signaling to the device, to enable the device to decode the at least one CCE to recover a control channel for the device.

10. The non-transitory computer readable storage medium of claim 9 , wherein the control signaling includes an indication of a starting symbol that the device should monitor for the at least one CCE in the control resource located in the LTE subframes.

11. The non-transitory computer readable storage medium of claim 9 , wherein the device is a relay eNB.

12. The non-transitory computer readable storage medium of claim 9 , wherein the at least one PRB is semi-statically allocated.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 9, 2016
From: RAAF, BERNHARD; ZENG, ERLIN; WANG, HAI MING; CHE, XIANG GUANG; GAO, CHUN YAN; CHEN, PENG; HAN, JING
To: NOKIA SIEMENS NETWORKS OY
Reel/Frame 040260/0765 →
CHANGE OF NAME Recorded Nov 9, 2016
From: NOKIA SIEMENS NETWORKS OY
To: NOKIA SOLUTIONS AND NETWORKS OY
Reel/Frame 040260/0781 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 9, 2016
From: NOKIA SOLUTIONS AND NETWORKS OY
To: WIRELESS FUTURE TECHNOLOGIES INC.
Reel/Frame 040260/0787 →
Continuity (3)
Continuation 14021622 · Sep 9, 2013
Continuation 12390267 · Feb 20, 2009
Related Publication 20150271803A1 · Sep 24, 2015