IP Library Granted Patent US 10,065,520
Granted Patent B2
US 10,065,520 · App. 14/745,293 · Granted Sep 4, 2018

System for optimizing electricity use from an electric grid and related method

Inventors: Li Zhang (Irvine, CA); Faryar Jabbari (Irvine, CA); Scott Samuelsen (Irvine, CA)
Assignee: The Regents of the University of California
B60L11/1848B60L11/184G06Q20/145G06Q50/06G07F15/005Y02T10/7005Y02T10/7072Y02T90/121Y02T90/128Y02T90/14Y02T90/163Y02T90/169Y04S30/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,065,520
App. No.
14/745,293
Granted
Sep 4, 2018
Kind
B2
Abstract

A method of optimizing electricity use from an electric grid is disclosed. The method includes formulating a target load using a cost function for the electric grid, broadcasting a cost signal to the electric device based on the target load, receiving a charging profile from the electric device based on the cost signal, aggregating a demand profile for the electricity use based on the charging profile, determining an updated cost signal based on the demand profile, and broadcasting the updated cost signal to another electric device. The electric device is chargeable electric device, such as a plug-in electric vehicle (PEV). The electric device determines the charging profile only once based on the cost signal, and is charged at maximum power.

Claims (35)

1. A system for optimizing electricity use from an electric grid, said system comprising:

a grid operator configured to formulate a target load using a cost function for said electric grid;

said grid operator configured to broadcast a cost signal to a first chargeable electric device based on said target load;

a server in said grid operator receiving a charging profile for charging said first chargeable electric device from said first chargeable electric device, said charging profile determined by said first chargeable electric device based on said cost signal, wherein said charging profile includes at most one partial time period during which charging stops partly through said one partial time period;

an aggregator in said grid operator aggregating a demand profile for said electricity use based on said charging profile;

said grid operator configured to determine an updated cost signal based on said demand profile;

said grid operator configured to broadcast said updated cost signal to a second chargeable electric device, but not to said first chargeable electric device;

said system further comprising a means for plugging said first chargeable electric device into said electric grid;

said grid operator further configured to control charging of said first chargeable electric device based on said charging profile.

2. The system of claim 1 , further comprising another means for plugging said second chargeable electric device into said electric grid.

3. The system of claim 1 , wherein said first chargeable electric device is a plug-in electric vehicle (PEV).

4. The system of claim 1 , wherein said target load is configured by said grid operator to fill a primary electricity demand valley.

5. The system of claim 1 , wherein said target load is configured by said grid operator to fill a secondary electricity demand valley.

6. The system of claim 1 , wherein said target load is configured by said grid operator to reduce a ramp rate for said electric grid.

7. The system of claim 1 , wherein said first chargeable electric device determines said charging profile only once based on said cost signal.

8. The system of claim 1 , wherein said system is configured to charge said first chargeable electric device at a maximum charging rate.

9. The system of claim 1 , wherein said grid operator is configured to determine said updated cost signal at set time intervals.

10. The system of claim 1 , wherein said grid operator is configured to determine said updated cost signal for a set number of registered electric devices.

11. A method of optimizing electricity use from an electric grid, said method comprising:

formulating a target load using a cost function for said electric grid;

broadcasting a cost signal to a first chargeable electric device based on said target load;

receiving a charging profile for charging said first chargeable electric device from said first chargeable electric device, said charging profile determined by said first chargeable electric device based on said cost signal, wherein said charging profile includes at most one partial time period during which charging stops partly through said one partial time period;

aggregating a demand profile for said electricity use based on said charging profile;

determining an updated cost signal based on said demand profile;

broadcasting said updated cost signal to a second chargeable electric device but not to said first chargeable electric device;

controlling charging of said first chargeable electric device based on said charging profile.

12. The method of claim 11 , further comprising plugging in said first chargeable electric device to said electric grid prior to said formulating said target load.

13. The method of claim 11 , wherein said first chargeable electric device is a plug-in electric vehicle (PEV).

14. The method of claim 11 , wherein said first chargeable electric device determines said charging profile only once based on said cost signal to avoid iterative communication between said first chargeable electric device and said grid operator.

15. The method of claim 11 , further comprising said target load filling a primary electricity demand valley.

16. The method of claim 11 , further comprising said target load filling a secondary electricity demand valley.

17. The method of claim 11 , wherein said determining said updated cost signal is performed at set time intervals.

18. The method of claim 11 , wherein said determining said updated cost signal is performed for a set number of registered electric devices.

19. The method of claim 11 , wherein said target load is configured to reduce a ramp rate for said electric grid.

20. The method of claim 11 , further comprising charging said first chargeable electric device at a maximum charging rate.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 22, 2015
From: ZHANG, LI; JABBARI, FARYAR; SAMUELSEN, SCOTT
To: THE REGENTS OF THE UNIVERSITY OF CALIFORNIA
Reel/Frame 035985/0890 →
Continuity (2)
Provisional Application 62023754 · Jul 11, 2014
Related Publication 20160009192A1 · Jan 14, 2016
Cited By (2)
US 12,288,231 US 12,734,926