IP Library › Granted Patent US 9,949,284
Granted Patent B2
US 9,949,284 · App. 14/761,730 · Granted Apr 17, 2018

Methods for determining signaling timing and scheduling timing in determining uplink and downlink reconfiguration, and user equipment

Inventors: Min Wu (Beijing, CN); Chien-Hwa Hwang (Zhubei, TW)
Assignee: MEDIATEK SINGAPORE PTE. LTD.
H04W72/1268H04L1/1812H04L1/1854H04L5/0055H04L5/143H04W24/02H04W72/04H04W72/12H04L5/001H04L5/1469
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,949,284
App. No.
14/761,730
Granted
Apr 17, 2018
Kind
B2
Abstract

The present invention provides a method for determining HARQ-ACK feedback timing and uplink scheduling timing, and for managing the synchronous uplink HARQ process during uplink and downlink reconfiguration. The method comprises: when uplink and downlink reconfiguration is performed, determining whether at least one HARQ-ACK feedback associated with the last frame of a previous uplink and downlink configuration cannot be transmitted in the first frame of a current uplink and downlink configuration; and when the HARQ-ACK feedback cannot be transmitted in the first frame of the current uplink and downlink configuration, the HARQ-ACK feedback follows a new timing determined by the previous and the current uplink and downlink configuration.

Claims (56)

1. A method for determining a HARQ-ACK feedback timing and a uplink scheduling timing during UL-DL reconfiguration, the method comprising:

using, by a user equipment (UE), a first timing set for a HARQ-ACK feedback timing and a UL scheduling timing of a first frame of a current UL-DL configuration during the UL-DL reconfiguration; and

using, by the UE, a second timing set for the HARQ-ACK feedback timing and a UL scheduling timing of a second frame and subsequent frames of the current UL-DL configuration after the UL-DL reconfiguration;

wherein the first timing set is different from the second timing set and a third timing set for a HARQ-ACK feedback timing and a UL scheduling timing of a previous UL-DL configuration before the UL-DL reconfiguration.

2. The method as claimed in claim 1 , wherein the HARQ-ACK feedback timing is a UL HARQ-ACK feedback timing or a DL HARQ-ACK feedback timing.

3. The method as claimed in claim 1 , wherein the UL scheduling timing is a timing of a physical uplink shared channel scheduled by an uplink grant, or a timing of a physical uplink shared channel scheduled by a HARQ-ACK.

4. The method as claimed in claim 2 , wherein the HARQ-ACK feedback timing is a UL HARQ-ACK feedback timing, the method further comprises:

starting a first number of HARQ processes when a number of HARQ processes of the current UL-DL configuration is greater than a number of HARQ processes of a previous UL-DL configuration; or

terminating a second number of HARQ processes when the number of HARQ processes of the current UL-DL configuration is less than the number of HARQ processes of the previous UL-DL configuration; or

terminating a third number of HARQ processes and starting the third number of HARQ processes when the number of HARQ processes of the current UL-DL configuration is equal to the number of HARQ processes of the previous UL-DL configuration, and certain HARQ processes are unable to be continuous during the UL-DL reconfiguration.

5. The method as claimed in claim 4 , wherein the UE further activates the first number of HARQ modules and the first number of buffers when starting the first number of HARQ processes.

6. The method as claimed in claim 4 , wherein the UE further clears the second number of buffers corresponding to the second number of terminated HARQ process when terminating the second number of HARQ processes.

7. The method as claimed in claim 4 , wherein the HARQ process is terminated after receiving the last HARQ-ACK of the terminated HARQ process.

8. The method as claimed in claim 6 , further comprising:

when the last HARQ-ACK of the terminated HARQ process is a negative acknowledgement (NACK), and a number of the retransmissions of the terminated HARQ process is less than a maximum number of retransmissions, an uncoded data corresponding to the terminated HARQ process is included in other activated HARQ process as new data transmission; and

when the number of retransmissions of the terminated HARQ process is equal to a maximum number of retransmissions, or the last HARQ-ACK of the terminated HARQ process is a positive acknowledgement (ACK), a coded data corresponding to the terminated HARQ process are cleared from the corresponding buffers.

9. The method as claimed in claim 7 , further comprising:

when the last HARQ-ACK of the HARQ process is NACK, and a number of retransmissions of the terminated HARQ process is less than a maximum number of transmissions, a coded data corresponding to the terminated HARQ process is included in other activated HARQ processes and is retransmitted in the other activated HARQ processes; and

when the number of retransmissions of the terminated HARQ process is equal to a maximum number of retransmissions, or the last HARQ-ACK of the terminated HARQ process is ACK, the coded data corresponding to the terminated HARQ process are cleared from the corresponding buffers.

10. The method as claimed in claim 9 , wherein there is a mapping relationship between the terminated HARQ process and the other activated HARQ process.

11. The method as claimed in claim 10 , wherein the mapping relationship is configured by a radio resource control (RRC) signaling.

12. The method as claimed in claim 9 , wherein a priority of the retransmission of the terminated HARQ process and the retransmission of the activated HARQ process mapped to the terminated HARQ process is configured by RRC signaling.

13. The method as claimed in claim 9 , wherein the retransmission of the terminated HARQ process and the retransmission of the activated HARQ process mapped to the terminated HARQ process are indicated by physical signaling.

14. The method as claimed in claim 13 , wherein the UE detects a DL control message to obtain that the retransmitted data in the activated HARQ processes is mapped to the terminated HARQ process or the activated HARQ processes.

15. The method as claimed in claim 1 , further comprising:

the HARQ-ACK feedback timing of a first frame of the current UL-DL configuration is generated from the HARQ-ACK feedback timing of the previous UL-DL configuration and the HARQ-ACK feedback timing of the current UL-DL configuration; and

the UL scheduling timing of the first frame of the current UL-DL configuration is generated from the UL scheduling timing of the previous UL-DL configuration, and the UL scheduling timing of the current UL-DL configuration.

16. The method as claimed in claim 15 , wherein in the step in which the HARQ-ACK feedback timing of the first frame of the current UL-DL configuration is generated from the HARQ-ACK feedback timing of the previous UL-DL configuration and the HARQ-ACK feedback timing of the current UL-DL configuration further comprises:

a HARQ-ACK feedback subframe is available under the current UL-DL configuration when reusing the HARQ-ACK feedback timing of the previous UL-DL configuration, at least the generated HARQ-ACK feedback timing partially reuses the available HARQ-ACK feedback timing of the previous UL-DL configuration;

a HARQ-ACK feedback subframe is unavailable under the current UL-DL configuration when reusing the HARQ-ACK feedback timing of the previous UL-DL configuration, a specific subframe of the current UL-DL configuration is selected to transmit the HARQ-ACK feedback,

wherein the specific subframe is a closest subframe of the unavailable HARQ-ACK feedback subframe when reusing the HARQ-ACK feedback timing of the previous UL-DL configuration, and an interval between a transmission subframe for corresponding physical shared data channel and the selected subframe is at least 4 subframes.

17. The method as claimed in claim 15 , wherein in the step in which the UL scheduling timing of the first frame of the current UL-DL configuration is generated from the UL scheduling timing of the previous UL-DL configuration and the UL scheduling timing of the current UL-DL configuration further comprises:

a UL scheduling subframe is available under the previous UL-DL configuration when reusing the UL timing of the current UL-DL configuration, at least the generated UL scheduling timing partially reuses the available UL scheduling timing of the current UL-DL configuration;

a UL scheduling subframe is unavailable under the previous UL-DL configuration when reusing the UL scheduling timing of the current UL-DL configuration, a specific subframe of the previous UL-DL configuration is selected to transmit the UL scheduling,

wherein the specific subframe is a closest subframe of the unavailable UL scheduling subframe when reusing the UL scheduling timing of the current UL-DL configuration, and an interval between a transmission subframe for corresponding physical shared data channel and the selected subframe is at least 4 subframes.

18. A user equipment (UE) for managing a HARQ-ACK feedback timing during UL-DL reconfiguration, comprising:

a plurality of buffers, buffering a first transmission and retransmission of a physical shared data channel;

at least one processing circuit;

when an uplink-downlink (UL-DL) configuration is reconfigured, the processing circuit being configured for,

using a first timing table for HARQ-ACK feedback timing of a first frame of a current UL-DL configuration;

using a second timing table for HARQ-ACK feedback timing of a second frame and subsequent frames of the current UL-DL configuration after the UL-DL reconfiguration; and

transmitting the HARQ-ACK corresponding to the physical shared data according to the corresponding HARQ-ACK feedback timing table;

wherein the first timing set is different from the second timing set and a third timing set for a HARQ-ACK feedback timing and a UL scheduling timing of a previous UL-DL configuration before the UL-DL reconfiguration.

19. The user equipment for managing a HARQ-ACK feedback timing during UL-DL reconfiguration as claimed in claim 18 , wherein the HARQ-ACK feedback timing is an UL HARQ-ACK feedback timing or a DL HARQ-ACK feedback timing, the at least one processing circuit is further configured for:

starting a first number of HARQ processes when a number of HARQ processes of the current UL-DL configuration is greater than a number of HARQ processes of a previous UL-DL configuration; or

terminating a second number of HARQ processes when the number of HARQ processes of the current UL-DL configuration is less than the number of HARQ processes of the previous UL-DL configuration; or

terminating a third number of HARQ processes and starting the third number of HARQ processes when the number of HARQ processes of the current UL-DL configuration is equal to the number of HARQ processes of the previous UL-DL configuration, and certain HARQ processes are unable to be continuous during the UL-DL reconfiguration.

20. The user equipment for managing a HARQ-ACK feedback timing during UL-DL reconfiguration as claimed in claim 19 , wherein the UE further activates the first number of buffers when starting the first number of HARQ processes.

21. The user equipment for managing a HARQ-ACK feedback timing during UL-DL reconfiguration as claimed in claim 19 , wherein the UE further clears the second number of buffers corresponding to the second number of terminated HARQ processes when terminating the second number of HARQ processes.

22. The user equipment for managing a HARQ-ACK feedback timing during UL-DL reconfiguration as claimed in claim 21 , further comprising:

when the last HARQ-ACK of the terminated HARQ process is NACK, and a number of the retransmissions of the terminated HARQ process is less than an allowed maximum number of retransmissions, an uncoded data corresponding to the terminated HARQ process is included in other activated HARQ process as new data transmission; and

when the number of retransmissions of the terminated HARQ process is equal to an allowed maximum number of retransmissions, or the corresponding HARQ-ACK is ACK, a coded data corresponding to the terminated HARQ process is cleared from the corresponding buffers.

23. The user equipment for managing a HARQ-ACK feedback timing during UL-DL reconfiguration as claimed in claim 18 , wherein the at least one processing circuit is configured for generating the first timing table according to the following principles:

at least the generated HARQ-ACK feedback timing partially reuses the HARQ-ACK feedback timing of the previous UL-DL configuration;

a HARQ-ACK feedback subframe is unavailable under current UL-DL configuration when reusing the HARQ-ACK feedback timing of the previous UL-DL configuration, a specific subframe of the current UL-DL configuration is selected to transmit the specific HARQ-ACK feedback;

wherein the specific subframe is a closest subframe of the unavailable HARQ-ACK feedback subframe when reusing the HARQ-ACK feedback timing of the previous UL-DL configuration, and an interval between a transmission subframe for corresponding physical shared data channel and the selected subframe is at least 4 subframes.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 11, 2018
From: MEDIATEK SINGAPORE PTE. LTD.
To: HFI INNOVATION INC.
Reel/Frame 046840/0777 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 17, 2015
From: WU, MIN; HWANG, CHIEN-HWA
To: MEDIATEK SINGAPORE PTE. LTD.
Reel/Frame 036122/0935 →
Priority Claims (1)
CN 2013 1 0018416 · Jan 18, 2013 · national
Continuity (1)
Related Publication 20150365965A1 · Dec 17, 2015