IP Library › Granted Patent US 9,822,632
Granted Patent B2
US 9,822,632 · App. 14/764,934 · Granted Nov 21, 2017

Method of pressure testing a plugged well

Inventors: Halvor Kjørholt (Trondheim, NO); Gisle Stjern (Trondheim, NO)
Assignee: STATOIL PETROLEUM AS
E21B47/06E21B33/124E21B33/13E21B33/134E21B47/1025
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,822,632
App. No.
14/764,934
Granted
Nov 21, 2017
Kind
B2
Abstract

A method of plugging a well extending into a hydrocarbon bearing formation facilitates temporary or permanent abandonment of the well. The method includes forming two or more plugs within the well, the plugs being formed at longitudinally spaced apart locations whilst providing a fluid communication path from a region above the topmost plug to the or each space between adjacent plugs. This configuration facilitates pressure testing of one or more of the plugs by conducting fluid through said path.

Claims (13)

1. A method of plugging a well extending into a hydrocarbon bearing formation to facilitate temporary or permanent abandonment of the well, the method comprising the step of:

pumping a sealant into the well to form two or more plugs within the well, the plugs being formed at longitudinally spaced apart locations while providing a fluid communication path from a region above a topmost plug of said two or more plugs to at least one space between adjacent plugs of said two or more plugs; and

pressure testing of one or more of said two or more plugs by conducting fluid through said fluid communication path.

2. The method according to claim 1 , wherein each plug has a length of at least 0.2 meters.

3. The method according to claim 1 , further comprising the step of partially or completely filling said at least one space with a permeable material or void making material or device.

4. The method according to claim 3 , wherein said permeable material is a particulate material.

5. The method according to claim 4 , wherein said particulate material is one of sand or proppant.

6. The method according to claim 1 , wherein said step of providing the fluid communication path comprises positioning one or more pressure testing tubes within plugs of said two or more plugs located directly above said at least one space.

7. The method according to claim 1 , further comprising the step of pressure testing of one or more of the plugs by conducting fluid through said fluid communication path.

8. The method according to claim 7 , further comprising the step of plugging the fluid communication path subsequent to said pressure testing.

9. A method of pressure testing a plug formed during plugging of a well using the method of claim 1 , the method comprising the steps of:

passing a fluid through said fluid communication path in order to establish an elevated or reduced pressure within said at least one space; and

monitoring the pressure or leakage at at least one of the following locations to determine the integrity of at least one of said two or more plugs: between said adjacent plugs and above or below one or more of the plugs.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 17, 2015
From: KJØRHOLT, HALVOR; STJERN, GISLE
To: STATOIL PETROLEUM AS
Reel/Frame 036334/0900 →
Continuity (1)
Related Publication 20150361782A1 · Dec 17, 2015