Pressurized fluidized furnace equipment

Inventors: Toshiki Kobayashi (Tokyo, JP); Takafumi Yamamoto (Tokyo, JP); Kazuyoshi Terakoshi (Tokyo, JP)
Assignee: Tsukishima Kikai Co., Ltd.
F23C10/16F23G5/30F23J15/006F23J15/06F23L15/04F23G2202/30F23G2209/12F23J2217/101F23J2217/103F23J2217/104F23J2219/40F23J2900/15004F23L2900/05021Y02E20/348
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,933,156
App. No.
14/777,797
Granted
Apr 3, 2018
Kind
B2
Abstract

Pressurized fluidized furnace equipment includes a fluidized bed furnace ( 1 ) that pressurizes combustion air (B) and combusts a material to be treated (A) while fluidizing the same; an air preheater ( 3 ) that exchanges heat between a combustion exhaust gas (C) discharged from the fluidized bed furnace ( 1 ) and the combustion air (B); a dust collector ( 4 ) that removes dust from the combustion exhaust gas (C); and first and second superchargers ( 5, 6 ) to which the combustion exhaust gas (C), having undergone the heat exchange in the air preheater ( 3 ) and the dust removal in the dust collector ( 4 ), is supplied to generate compressed air (D, E). The first compressed air (D) generated in the first supercharger ( 5 ) is supplied as the combustion air (B) to the fluidized bed furnace ( 1 ) by way of the air preheater ( 3 ), and the second compressed air (E) generated in the second supercharger ( 6 ) is made to have a higher pressure than that of the first compressed air (D). Accordingly, it is possible to prevent the equipment from having more superchargers than is necessary for normal use although a plurality of first and second superchargers are provided, and to efficiently use the surplus combustion exhaust gas.

Claims (20)

1. Pressurized fluidized furnace equipment comprising:

a fluidized bed furnace that pressurizes combustion air and combusts a material to be treated while fluidizing the same;

an air preheater that exchanges heat between a combustion exhaust gas discharged from the fluidized bed furnace and the combustion air;

a dust collector that removes dust from the combustion exhaust gas; and

first and second superchargers to which the combustion exhaust gas, having undergone the heat exchange in the air preheater and the dust removal in the dust collector, is supplied to generate compressed air,

first and second supply passages that supply a combustion exhaust gas to the first and second superchargers, respectively,

wherein the first compressed air generated in the first supercharger is supplied as the combustion air to the fluidized bed furnace by way of the air preheater,

wherein the second compressed air generated in the second supercharger is made to have a higher pressure than that of the first compressed air, and

wherein flow rate adjusting means configured to adjust the flow rate of the combustion exhaust gas to be supplied to the second supercharger on the basis of the pressure of the first compressed air is provided in the second supply passage of the first and second supply passages.

2. The pressurized fluidized furnace equipment according to claim 1 ,

wherein at least a portion of the second compressed air is supplied to the dust collector, and is used as pulse air which is used to shake off the dust removed from the combustion exhaust gas.

3. The pressurized fluidized furnace equipment according to claim 1 ,

wherein at least a portion of the second compressed air is supplied to an instrumentation device provided in the pressurized fluidized furnace equipment.

4. The pressurized fluidized furnace equipment according to claim 1 ,

wherein at least a portion of the second compressed air is supplied to an air preheater configured to prevent the formation of a white smoke and is used as white smoke prevention air.

5. The pressurized fluidized furnace equipment according to claim 1 ,

wherein a compressed air storage tank is connected to the second supercharger, and the second compressed air is capable of being stored in the compressed air storage tank.

6. The pressurized fluidized furnace equipment according to claim 1 ,

wherein at least a portion of the second compressed air is supplied to an air preheater configured to prevent the formation of a white smoke provided in the pressurized fluidized furnace equipment via a compressed air storage tank connected to the second supercharger and is used as white smoke prevention air, and

wherein a compressor, which supplies compressed air to the compressed air storage tank when the pressure within the compressed air storage tank becomes lower than a predetermined lower limit, is connected to the compressed air storage tank.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 24, 2025
From: TSUKISHIMA HOLDINGS CO.,LTD.
To: TSUKISHIMA AQUA SOLUTION CO., LTD.
Reel/Frame 070301/0771 →
CHANGE OF NAME Recorded May 5, 2024
From: TSUKISHIMA AQUA SOLUTION CO., LTD.
To: TSUKISHIMA JFE AQUA SOLUTION CO., LTD.
Reel/Frame 067316/0952 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 17, 2015
From: KOBAYASHI, TOSHIKI; YAMAMOTO, TAKAFUMI; TERAKOSHI, KAZUYOSHI
To: TSUKISHIMA KIKAI CO., LTD.
Reel/Frame 036591/0444 →
Priority Claims (1)
JP 2013-064470 · Mar 26, 2013 · national
Continuity (1)
Related Publication 20160273762A1 · Sep 22, 2016