IP Library Granted Patent US 10,025,277
Granted Patent B2
US 10,025,277 · App. 15/004,976 · Granted Jul 17, 2018

Systems and methods for electrical charging load modeling services to optimize power grid objectives

Inventors: Valery Miftakhov (San Carlos, CA); Alexander Gurzhi (San Jose, CA); Chris Edgette (Oakland, CA); Alan White (Tiburon, CA)
Assignee: Electric Motor Werks, Inc.
G05B13/041B60L11/1809G05F1/66G07F15/005H02J7/0027G05B2219/2637Y02P80/21
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,025,277
App. No.
15/004,976
Granted
Jul 17, 2018
Kind
B2
Abstract

A system configured to receive and automatically analyze various types of information, including, without limitation, information from energy generators, information from non-generation resources, information on the facility status, information on user behavior, information on user's short-term energy needs (e.g. over-ride any algorithm due to immediate charging need), information on renewable generation, including, without limitation, solar, wind, biomass and/or hydro, and information on environmental conditions including, without limitation, barometric pressure, temperature, ambient light intensity, humidity, air speed, and air quality. In one or more embodiments, a sole novel charging station or selected, aggregated groupings of the aforesaid novel charging stations are configured to start, modulate or stop charging, or start, modulate (down) or stop discharging over specific time intervals based on the electrical grid needs as automatically determined based on the totality of the received diverse information. To this end, a system and an associated method are provided to perform complete electrical charging load modeling to optimize power grid objectives.

Claims (32)

1. A computerized system for electrical charging load modeling to optimize power grid objectives, the system comprising:

a. a plurality of charging assets; and

b. a cloud server comprising at least one processing unit, the cloud server comprising:

i. a data aggregation module configured to collect and aggregate a plurality of information items;

ii. an analytics module configured to identify at least one temporal model associated with the data collected and aggregated by the data aggregation module;

iii. a charging module configured to determine a charging pattern for each of the plurality of charging assets, the charging pattern comprising information on time intervals when each of the plurality of charging assets is to be charged, including the beginning and ending times of the charging operation and information on a level of charging during each charging time interval;

iv. a charger asset module configured to control charging of the plurality of charging assets in accordance with the determined charging patterns by issuing a control command to each of the plurality of charging assets; and

v. a communication module for communicating the control command issued by the charger asset module to the respective charging asset via a data network.

2. The computerized system for electrical charging load modeling to optimize power grid objectives of claim 1 , wherein the plurality of information items comprises a power grid data.

3. The computerized system for electrical charging load modeling to optimize power grid objectives of claim 1 , wherein the plurality of information items comprises a data collected from local grids, the local grids comprising residential renewables, local or regional microgrids.

4. The computerized system for electrical charging load modeling to optimize power grid objectives of claim 1 , wherein the plurality of information items comprises data originating from an external environment.

5. The computerized system for electrical charging load modeling to optimize power grid objectives of claim 4 , wherein the data originating from an external environment comprises weather-related information, solar activity information, cloud-cover information or earthquake information.

6. The computerized system for electrical charging load modeling to optimize power grid objectives of claim 1 , wherein the plurality of information items comprises data representing energy needs of individual or groups of electric energy users.

7. The computerized system for electrical charging load modeling to optimize power grid objectives of claim 1 , wherein the plurality of information items comprises data on specific users of electrical power and their individual behavior.

8. The computerized system for electrical charging load modeling to optimize power grid objectives of claim 1 , wherein the plurality of information items comprises data on energy storage, including any available EV batteries, power storage batteries, as well as data on any energy coming from Load-Serving-Entities.

9. The computerized system for electrical charging load modeling to optimize power grid objectives of claim 1 , wherein the plurality of information items comprises data on a specific one of the plurality of charging assets.

10. The computerized system for electrical charging load modeling to optimize power grid objectives of claim 1 , wherein the plurality of information items comprises data on a power grid priorities.

11. The computerized system for electrical charging load modeling to optimize power grid objectives of claim 1 , wherein the data on a power grid priorities comprises information on maximization of revenue, protecting assets, balancing energy, reducing emissions, or delivering ancillary services.

12. A computer-implemented method for electrical charging load modeling to optimize power grid objectives, the method being performed in connection with a plurality of charging assets and a cloud server comprising at least one processing unit, the method comprising:

i. collecting and aggregating a plurality of information items;

ii. identifying at least one temporal model associated with the collected and aggregated plurality of information items;

iii. determining a charging pattern for each of the plurality of charging assets, the charging pattern comprising information on time intervals when each of the plurality of charging assets is to be charged, including the beginning and ending times of the charging operation and information on a level of charging during each charging time interval;

iv. controlling charging of the plurality of charging assets in accordance with the determined charging patterns by issuing a control command to each of the plurality of charging assets; and

v. communicating the control command issued by the charger asset module to the respective charging asset via a data network.

13. The computer-implemented method for electrical charging load modeling to optimize power grid objectives of claim 12 , wherein the plurality of information items comprises a power grid data.

14. The computer-implemented method for electrical charging load modeling to optimize power grid objectives of claim 12 , wherein the plurality of information items comprises a data collected from local grids, the local grids comprising residential renewables, local or regional microgrids.

15. The computer-implemented method for electrical charging load modeling to optimize power grid objectives of claim 12 , wherein the plurality of information items comprises data originating from an external environment.

16. The computer-implemented method for electrical charging load modeling to optimize power grid objectives of claim 15 , wherein the data originating from an external environment comprises weather-related information, solar activity information, cloud-cover information or earthquake information.

17. The computer-implemented method for electrical charging load modeling to optimize power grid objectives of claim 12 , wherein the plurality of information items comprises data representing energy needs of individual or groups of electric energy users.

18. The computer-implemented method for electrical charging load modeling to optimize power grid objectives of claim 12 , wherein the plurality of information items comprises data on specific users of electrical power and their individual behavior.

19. The computer-implemented method for electrical charging load modeling to optimize power grid objectives of claim 12 , wherein the plurality of information items comprises data on energy storage, including any available EV batteries, power storage batteries, as well as data on any energy coming from Load-Serving-Entities.

20. The computer-implemented method for electrical charging load modeling to optimize power grid objectives of claim 12 , wherein the plurality of information items comprises data on a specific one of the plurality of charging assets.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 10, 2025
From: ENEL X WAY USA, LLC
To: JUICEBOX USA (ASSIGNMENT FOR THE BENEFIT OF CREDITORS), LLC
Reel/Frame 071653/0904 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 19, 2022
From: ENEL X NORTH AMERICA, INC.
To: ENEL X WAY USA, LLC
Reel/Frame 062148/0609 →
MERGER AND CHANGE OF NAME Recorded Oct 21, 2019
From: ELECTRIC MOTOR WERKS, INC.; ENEL X NORTH AMERICA, INC.
To: ENEL X NORTH AMERICA, INC.
Reel/Frame 050774/0407 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 29, 2017
From: MIFTAKHOV, VALERY; GURZHI, ALEXANDER; EDGETTE, CHRIS; WHITE, ALAN
To: ELECTRIC MOTOR WERKS, INC.
Reel/Frame 043440/0849 →
Continuity (3)
Continuation In Part 14853955 · Sep 14, 2015
Provisional Application 62050147 · Sep 14, 2014
Related Publication 20170017213A1 · Jan 19, 2017
Cited By (1)
US 12,491,786