IP Library Granted Patent US 10,200,185
Granted Patent B2
US 10,200,185 · App. 15/031,178 · Granted Feb 5, 2019

Method for monitoring PDCCH in FDD half-duplex communication and terminal thereof

Inventors: Hyangsun You (Seoul, KR); Yunjung Yi (Seoul, KR); Suckchel Yang (Seoul, KR); Joonkui Ahn (Seoul, KR); Jonghyun Park (Seoul, KR)
Assignee: LG ELECTRONICS INC.
H04L5/16H04J1/16H04L5/0053H04W52/0216H04W52/0229H04W76/28H04W4/70Y02D70/00Y02D70/1242Y02D70/1262Y02D70/1264Y02D70/21Y02D70/23Y02D70/24
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,200,185
App. No.
15/031,178
Granted
Feb 5, 2019
Kind
B2
Abstract

One embodiment of the present description provides a method for monitoring a physical downlink control channel (PDCCH). The method for monitoring a PDCCH can comprise the steps of: performing a frequency division duplex (FDD) half-duplex operation; and determining whether to monitor the PDCCH if discontinuous reception (DRX) is set. Here, when a downlink subframe of a downlink carrier is positioned immediately before an uplink subframe of an uplink carrier, the PDCCH can be monitored in the downlink subframe during an active time.

Claims (29)

1. A method for monitoring a Physical Downlink Control Channel (PDCCH) signal, the method comprising:

determining, by a terminal, whether to monitor the PDCCH signal when a discontinuous reception (DRX) is configured,

wherein during an active time, the PDCCH signal is monitored on a downlink subframe, when the downlink subframe is not required for uplink transmission for a half-duplex operation in a frequency division duplex (FDD), when the downlink subframe is not a part of a configured measurement gap, and when the downlink subframe does not immediately precede an uplink subframe;

if the terminal is configured with a coverage enhancement (CE) for the half-duplex operation in the FDD, receiving, by the terminal, a physical downlink shared channel (PDSCH) signal which is repeated; and

transmitting, by the terminal, a physical uplink shared channel (PUSCH) signal which is repeated on a plurality of uplink subframes except for one or more uplink subframes that overlap with one or more downlink subframes where the PDSCH signal is repeated.

2. The method of claim 1 , wherein when the downlink subframe immediately precedes the uplink subframe, a guard period is generated in the downlink subframe by not receiving a part or the entirety of the downlink subframe.

3. The method of claim 2 , wherein when the guard period is generated in the downlink subframe, the PDCCH signal is not monitored in the downlink subframe.

4. The method of claim 1 , wherein when the downlink subframe immediately precedes the uplink subframe, the PDCCH signal is not monitored on the downlink subframe during the active time.

5. The method of claim 4 , wherein when the downlink subframe immediately precedes the uplink subframe, a guard period is generated in the downlink subframe by not receiving a part or the entirety of the downlink subframe.

6. The method of claim 5 , wherein when the guard period is generated in the downlink subframe, the PDCCH signal is not monitored on the downlink subframe.

7. The method of claim 1 , wherein as the half-duplex operation in the FDD is performed, a reception on the downlink subframe and a transmission on the uplink subframe are not simultaneously performed.

8. A terminal for monitoring a physical downlink control channel (PDCCH) signal, the terminal comprising:

a radio frequency (RF) unit; and

a processor configured to control the RF unit and determine whether to monitor the PDCCH signal when discontinuous reception (DRX) is configured,

wherein during an active time, the PDCCH signal is monitored on a downlink subframe, when the downlink subframe is not required for uplink transmission for a half-duplex operation in a frequency division duplex (FDD), when the downlink subframe is not a part of a configured measurement gap, and when the downlink subframe does not immediately precede an uplink subframe,

wherein if the terminal is configured with a coverage enhancement (CE) for the half-duplex operation in the FDD, the processor is further configured to receive a physical downlink shared channel (PDSCH) signal which is repeated, and

wherein the processor is further configured to transmit a physical uplink shared channel (PUSCH) signal which is repeated on a plurality of uplink subframes except for one or more uplink subframes that overlap with one or more downlink subframes where the PDSCH signal is repeated.

9. The terminal of claim 8 , wherein when the downlink subframe immediately precedes the uplink subframe, a guard period is generated in the downlink subframe by not receiving a part or the entirety of the downlink subframe.

10. The terminal of claim 9 , wherein when the guard period is generated in the downlink subframe, the PDCCH signal is not monitored in the downlink subframe.

11. The terminal of claim 8 , wherein when the downlink subframe immediately precedes the uplink subframe, the PDCCH signal is not monitored on the downlink subframe during the active time.

12. The terminal of claim 11 , wherein when the downlink subframe immediately precedes the uplink subframe, a guard period is generated in the downlink subframe by not receiving a part or the entirety of the downlink subframe.

13. The terminal of claim 12 , when the guard period is generated in the downlink subframe, the PDCCH signal is not monitored on the downlink subframe.

14. The method of claim 1 , wherein the downlink subframe is located in a downlink carrier and the uplink subframe is located in an uplink carrier.

15. The method of claim 1 , further comprising:

if the downlink subframe immediately precedes the uplink subframe, determining that the downlink subframe immediately preceding the uplink subframe is not a valid subframe for measuring channel state information (CSI).

16. The terminal of claim 8 , wherein if the downlink subframe immediately precedes the uplink subframe, the processor is further configured to determine that the downlink subframe immediately preceding the uplink subframe is not a valid subframe for measuring channel state information (CSI).

17. The method of claim 1 , further comprising:

transmitting, by the terminal, uplink control information over time through different subcarriers in order to obtain frequency diversity gain.

18. The terminal of claim 8 , wherein the processor controls the RF unit to transmit uplink control information over time through different subcarriers in order to obtain frequency diversity gain.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 22, 2016
From: YOU, HYANGSUN; YI, YUNJUNG; YANG, SUCKCHEL; AHN, JOONKUI; PARK, JONGHYUN
To: LG ELECTRONICS INC.
Reel/Frame 038350/0108 →
Continuity (5)
Provisional Application 61945066 · Feb 26, 2014
Provisional Application 61952873 · Mar 14, 2014
Provisional Application 61973897 · Apr 2, 2014
Provisional Application 62002177 · May 22, 2014
Related Publication 20160254901A1 · Sep 1, 2016
Cited By (3)
US 12,267,850 US 12,550,154 US 12,581,496