Riser stress-engineering-assessment equipment to verify the integrity and the in-deployment-integrity of a riser string by knowing the status, details and location of each riser joint and by monitoring the deployment parameters. When the failure risk exceeds an acceptable level, the equipment activates a local and/or a remote alarm using voice, sound and lights. The system comprises a computer with communication means, a material properties and geometry detection system, a data acquisition system acquiring deployment and other parameters, a database comprising of riser historical data and captured expert knowledge, a failure-criteria calculation to calculate maximum-stresses under different loads and the combined effects of the different loads to determine if the riser string is still fit-for-deployment.

Claims (29)

1 . A method for assessment of an as-is riser system comprising a riser string comprising a plurality of risers, each riser comprising a central tube and a plurality of peripheral tubes parallel to said central tube, comprising:

running a surveying tool individually through said central tube and said plurality of peripheral tubes for each riser of said plurality of risers to produce survey data;

transferring said survey data for each of said plurality of risers to a finite element analysis program;

utilizing said finite element analysis program to combine said plurality of risers into a simulated riser string;

selecting and then applying simulated loads to said simulated riser string and determining whether said simulated riser is fit for use with said simulated loads; and

using said simulated loads and said simulated riser string to assess said as-is riser system.

2 . The method of claim 1 , further comprising:

keeping track of an order of each riser with respect to each other for said plurality of risers,

simulating a change in an order of said plurality of risers to provide a re-ordered simulated riser string, and

selecting and applying said simulated loads to said re-ordered simulated riser string and determining whether said re-ordered simulated riser is operable to withstand said simulated loads.

3 . The method of claim 2 , further comprising:

replacing selected of said plurality of risers from said simulated riser string and determining whether said re-ordered simulated riser string is operable to withstand said simulated loads.

4 . The method of claim 1 , wherein said simulated loads comprise at least two of tension, bending, torsion, and vibration.

5 . The method of claim 1 , further comprising determining which of said plurality of risers is a weakest riser.

6 . The method of claim 1 , further comprising maximum riser stresses during deployment.

7 . The method of claim 6 , further comprising utilizing deployment data along with riser material and geometry data.

8 . The method of claim 1 , further comprising including an effect of a geometric stress amplifiers, and comparing stresses to failure criteria to determine if the riser string is still fit-for-deployment.

9 . The method of claim 1 , wherein said simulated loads comprise vortex induced vibration.

10 . The method of claim 1 utilizing definitions and formulas stored in at least one memory storage resulting in a one, two or three dimensional mathematical description of said simulated loads and said simulated riser string to assess said as-is riser system.

11 . A riser assessment system of an as-is riser system comprising a riser string formed by a plurality of risers, each riser comprising a central tube and a plurality of peripheral tubes parallel to said central tube, comprising:

a computer with storage, data entry, data readout and communication means;

at least one sensor with an output in communication with said computer;

a database; and

calculation software to calculate maximum-stresses using said output to determine if said riser string is still fit-for-deployment or should be removed from deployment.

12 . The riser assessment system of claim 11 wherein said output comprises at least one of riser features or loads.

13 . The riser assessment system of claim 12 wherein said riser features comprise at least one of flaws comprising cracks, deformation, geometric-distortion, and wall thickness and combinations thereof.

14 . The Riser assessment system of claim 12 wherein said loads comprise at least one of bending, tension, torsion, and vibration.

15 . The riser assessment system of claim 12 , further comprising said output comprises parameters wherein said parameters comprise at least one of actions of drilling, actions of the environment, rig motion, sea currents, weight of drilling fluids.

16 . The riser assessment system of claim 12 , further comprising a natural language input for said at least one computer for said data entry or to control said calculation software.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 10, 2020
From: PAPADIMITRIOU, STYLIANOS
To: PAPADIMITRIOU, WANDA
Reel/Frame 053738/0732 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 10, 2020
From: PAPADIMITRIOU, WANDA
To: THE JASON PAPADIMITRIOU IRREVOCABLE TRUST; THE NICHOLAS PAPADIMITRIOU IRREVOCABLE TRUST
Reel/Frame 053738/0915 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 10, 2020
From: THE JASON PAPADIMITRIOU IRREVOCABLE TRUST; THE NICHOLAS PAPADIMITRIOU IRREVOCABLE TRUST
To: STYLWAN IP HOLDING, LLC
Reel/Frame 053739/0098 →