IP Library Granted Patent US 9,840,309
Granted Patent B2
US 9,840,309 · App. 15/147,216 · Granted Dec 12, 2017

Mooring arrangement

Inventors: Torkjell Lisland (Drøbak, NO); Lars Even Nilssen (Son, NO)
Assignee: SCANA OFFSHORE AS
B63B21/50B63B21/16B63B21/18
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,840,309
App. No.
15/147,216
Granted
Dec 12, 2017
Kind
B2
Abstract

A mooring arrangement for a floating vessel includes a linear anchor winch and an elongate mooring arm. The mooring arm is coupled to a mooring arm bracket via an articulating joint and the arrangement is adapted to receive an anchor chain. The bracket is attached to the vessel at the gunwale of the vessel, so that the bracket at least partially extends above the deck of the vessel. The anchor winch is coupled to or integrated with said bracket.

Claims (11)

1. A mooring arrangement for a floating vessel, the mooring arrangement comprising:

a linear anchor winch situated at or near a deck of the vessel;

a mooring arm bracket coupled to the linear anchor winch; and

an elongate mooring arm having a chain stopper, the elongate mooring arm being coupled to the mooring arm bracket via an articulating joint, said arrangement being adapted to receive an anchor chain wherein the bracket is attached to the vessel at a gunwale of the vessel, so that the bracket is adapted to at least partially extend along a deck of the vessel and is adapted to at least partly extend along a hull of the vessel, the anchor winch is coupled to or integrated with the bracket at the deck of the vessel.

2. The mooring arrangement according to claim 1 , wherein the anchor winch is adapted to be arranged on the deck of the vessel.

3. The mooring arrangement according to claim 1 , wherein the anchor winch has a traction direction along a surface of the deck perpendicular to the gunwale of the vessel.

4. The mooring arrangement according to claim 1 , wherein the winch is movably along the deck so as to be positioned in line with a selected one of a plurality of fairlead arrangements.

5. The mooring arrangement according to claim 1 , wherein the winch is moveable on a set of tracks that extends substantially in parallel with the gunwale.

6. The mooring arrangement according claim 4 , wherein the fairlead arrangement comprising a chain stopper arrangement.

7. The mooring arrangement according to claim 4 , wherein the bracket having a coupling for coupling to the fairlead arrangement, the coupling being situated outside of the gunwale.

8. The mooring arrangement according to claim 1 , wherein the bracket having end portions for supporting the winch.

Assignments (3)
CHANGE OF NAME Recorded Jul 21, 2020
From: SCANA OFFSHORE AS
To: SEASYSTEMS AS
Reel/Frame 053581/0087 →
CHANGE OF NAME Recorded Jul 11, 2016
From: SCANA OFFSHORE VESTBY AS
To: SCANA OFFSHORE AS
Reel/Frame 039126/0234 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 26, 2016
From: LISLAND, TORKJELL; NILSSEN, LARS EVEN
To: SCANA OFFSHORE VESTBY AS
Reel/Frame 038724/0210 →
Priority Claims (1)
NO 20150565 · May 7, 2015 · national
Continuity (1)
Related Publication 20160325804A1 · Nov 10, 2016