IP Library Granted Patent US 10,316,504
Granted Patent B2
US 10,316,504 · App. 15/176,233 · Granted Jun 11, 2019

Vacuum sewage system with monitoring system and method of use

Inventors: Mark Jones (Rochester, IN); Clint Hawn (Winona Lake, IN)
Assignee: Aqseptence Group, Inc.
E03F1/006E03F1/007F04C13/001F04C25/02F04C28/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,316,504
App. No.
15/176,233
Granted
Jun 11, 2019
Kind
B2
Abstract

A vacuum sewage system includes a collection station, a vacuum pump, a sewage pump, a collection tank, a control system, a valve pit, a first conduit extending from the collection station to the valve pit, a second conduit extending from the valve pit and terminating in a closed end, a valve located in the valve pit for selectively permitting sewage and waste water to flow from the valve pit toward the collection station upon activation of the valve, an electric air admission controller or a solenoid for selectively opening and closing the valve, a first sensor associated with the electronic air admission controller or the solenoid and a second sensor located adjacent the closed end of the second conduit. The system may be utilized to monitor and remedy various undesirable operating conditions in the system and to perform routines to increase operating efficiency of the system.

Claims (36)

1. A method of operating a vacuum sewage system including the steps of:

utilizing a sensor to detect system vacuum level at a location in the system;

comparing the detected system vacuum level to a previously specified system vacuum level;

detecting the operating time of a sewage pump;

comparing the detected operating time of the sewage pump with a previously specified operating time range;

if the detected system vacuum level is at or below the previously specified system vacuum level and the detected operating time of the sewage pump is within the previously specified operating time range, selectively opening and closing a valve in the sewage system in a previously specified timing cycle so as to admit air into the sewage system;

detecting the vacuum level at a sewage collection station;

comparing the detected vacuum level at the sewage collection station with a first previously specified collection station vacuum level;

if the detected vacuum level at the sewage collection station is below the first previously specified collection station vacuum level, operating a first vacuum pump;

continuing to detect the vacuum level at the sewage collection station during operation of the first vacuum pump and comparing the detected vacuum level at the sewage collection station to a second previously specified collection station vacuum level;

if the detected vacuum level at the sewage collection station is below the second previously specified collection station vacuum level during operation of the first vacuum pump, operating a second vacuum pump; and

continuing to selectively open and close the valve so as to admit air into the sewage system in the previously specified timing cycle until the detected system vacuum level reaches or exceeds the previously specified system vacuum level.

2. The method according to claim 1 , wherein the previously specified system vacuum level is approximately 12 inches of mercury.

3. The method according to claim 1 , wherein the previously specified sewage pump operating time range is less than approximately 3.5 minutes.

4. The method according to claim 1 , wherein the first previously specified collection station vacuum level is approximately 16 inches of mercury.

5. The method according to claim 1 , wherein the second previously specified collection station vacuum level is approximately 15 inches of mercury.

6. The method according to claim 1 , wherein the previously specified timing cycle for the valve is 20 seconds open and 10 minutes closed.

7. The method according to claim 1 , wherein the system vacuum level is detected at the end of a conduit.

8. The method of claim 1 , wherein an electric air admission controller is used to operate the valve.

9. The method according to claim 1 , wherein a solenoid is used to operate the valve.

10. A method of operating a vacuum sewage system including the steps of:

determining an anticipated peak operating time of the sewage system;

specifying a purge start time prior to the anticipated peak operating time;

at the specified purge start time, selectively opening and closing a valve in the sewage system in a previously specified timing cycle so as to admit air into the sewage system;

detecting the vacuum level at a sewage collection station;

comparing the detected vacuum level at the sewage collection station with a first previously specified collection station vacuum level;

if the detected vacuum level at the sewage collection station is below the first previously specified collection station vacuum level, operating a first vacuum pump;

continuing to detect the vacuum level at the sewage collection station during operation of the first vacuum pump and comparing the detected vacuum level at the sewage collection station to a second previously specified collection station vacuum level;

if the detected vacuum level at the sewage collection station is below the second previously specified collection station vacuum level during operation of the first vacuum pump, operating a second vacuum pump; and

continuing for a previously specified time period to selectively open and close the valve so as to admit air into the sewage system in the previously specified timing cycle.

11. The method according to claim 10 , wherein the first previously specified collection station vacuum level is approximately 16 inches of mercury.

12. The method according to claim 10 , wherein the second previously specified collection station vacuum level is approximately 15 inches of mercury.

13. The method according to claim 10 , wherein the previously specified timing cycle for the valve is 20 seconds open and 10 minutes closed.

14. The method according to claim 10 , wherein an electric air admission controller is used to operate the valve.

15. The method according to claim 10 , wherein a solenoid is used to operate the valve.

16. The method according to claim 10 , wherein the previously specified time period is approximately 30 minutes.

Assignments (3)
NUNC PRO TUNC ASSIGNMENT Recorded May 5, 2025
From: JOHSON SCREENS, INC. FORMERLY KNOWN AS AQSEPTENCE GROUP, INC.
To: AIRVAC, INC.
Reel/Frame 071167/0916 →
CHANGE OF NAME Recorded Dec 20, 2016
From: BILFINGER WATER TECHNOLOGIES, INC.
To: AQSEPTENCE GROUP, INC.
Reel/Frame 041034/0750 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 5, 2016
From: JONES, MARK; HAWN, CLINT
To: BILFINGER WATER TECHNOLOGIES, INC.
Reel/Frame 039071/0670 →
Continuity (2)
Provisional Application 62201234 · Aug 5, 2015
Related Publication 20170037611A1 · Feb 9, 2017