VIRTUAL POWER PLANT

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
15/197,526
Abstract

A virtual power plant is presented. A virtual power plant couples to one or more virtual power plant units that provide power and/or storage of power to a power grid. In some embodiments, a method of operating a virtual power plant includes receiving a request from a requester; determining whether the request can be performed by a set of units; reporting the result to the requester; and if a subsequent execution request is received from the requester, then executing the request.

Claims (44)

1 . A method of operating as a virtual power plant, comprising:

receiving a request from a requester;

determining whether the request can be performed by a set of units;

reporting the result to the requester; and

if a subsequent execution request is received from the requester, then executing the request.

2 . The method of claim 1 , wherein the request includes a set of required rules and a set of optional rules.

3 . The method of claim 2 , wherein determining whether the request can be performed by the set of units includes:

determining whether the set of required rules can be performed by the set of units.

4 . The method of claim 3 , wherein determining whether the set of required rules can be performed by the set of units includes creating a worksheet of instructions to individual units in the set of units based on current state parameters and characterization parameters of each of the set of units.

5 . The method of claim 3 , wherein determining whether the request can be performed by the set of units includes, if the set of required rules alone cannot be performed by the set of units, determining whether performance of one or more of a set of optional rules allows performance of the set of required rules.

6 . The method of claim 5 , wherein determining whether the request can be performed by the set of units includes, if the set of required rules cannot be performed with performance of one or more of the set of optional rules, determining whether a best-fit approximation to the set of required rules can be performed, the best-fit approximation being consistent with a set of best-fit rules.

7 . The method of claim 1 , wherein executing the request comprises:

determining whether the request can be performed by the set of units; and

instructing each of the set of units so that the request is fulfilled.

8 . The method of claim 7 , further including

monitoring the set of units during execution of the request;

determining if a new condition has developed; and

determining whether or not the request can be fulfilled in view of the new condition.

9 . The method of claim 8 , wherein the new condition is a failure of one or more edge units that results in a change in the characterization parameters.

10 . The method of claim 8 , wherein the new condition includes failure of one or more edge units that results in the one or more edge units becoming non-functional to perform the request.

11 . A Virtual Power Plant, comprising:

a processor;

a communications interface coupled to the processor, the communications interface configured to communicate with one or more virtual power plant units;

a second communications interface coupled to the process, the second communications interface configured to communicate with a requester; and

a memory coupled to the processor, the memory storing data and instructions to be performed by the processor, the instructions executed by the processor providing instructions for

receiving a request from a requester;

determining whether the request can be performed by a set of units;

reporting whether or not the request can be performed to the requester; and

if a subsequent execution request is received to execute the request from the requester, then executing the request.

12 . The virtual power plant of claim 11 , wherein the request includes a set of required rules and a set of optional rules.

13 . The virtual power plant of claim 12 , wherein determining whether the request can be performed by the set of units includes:

determining whether the set of required rules can be performed by the set of units.

14 . The virtual power plant of claim 13 , wherein determining whether the set of required rules can be performed by the set of units includes creating a worksheet of instructions to individual units in the set of units based on current state parameters and characterization parameters of each of the set of units.

15 . The virtual power plant of claim 13 , wherein determining whether the request can be performed by the set of units includes, if the set of required rules alone cannot be performed by the set of units, determining whether performance of one or more of a set of optional rules allows performance of the set of required rules.

16 . The virtual power plant of claim 15 , wherein determining whether the request can be performed by the set of units includes, if the set of required rules cannot be performed with performance of one or more of the set of optional rules, determining whether a best-fit approximation to the set of required rules can be performed, the best-fit approximation being consistent with a set of best-fit rules.

17 . The virtual power plant of claim 11 , wherein executing the request comprises:

determining whether the request can be performed by the set of units; and

instructing each of the set of units so that the request is fulfilled.

18 . The virtual power plant of claim 17 , further including

monitoring the set of units during execution of the request;

determining if a new condition has developed; and

determining whether or not the request can be fulfilled in view of the new condition.

19 . The virtual power plant of claim 18 , wherein the new condition is a failure of one or more edge units that results in a change in the characterization parameters.

20 . The virtual power plant of claim 18 , wherein the new condition includes failure of one or more edge units that results in the one or more edge units becoming non-functional to perform the request.

Assignments (4)
SECURITY INTEREST Recorded Aug 10, 2018
From: SUNVERGE ENERGY, INC.
To: MITSUI & CO., LTD., AS COLLATERAL AGENT
Reel/Frame 046617/0837 →
RELEASE OF SECURITY INTEREST Recorded Jun 20, 2018
From: SOUTHERN CROSS VENTURE PARTNERS PTY LTD, AS COLLATERAL AGENT
To: SUNVERGE ENERGY, INC.
Reel/Frame 046140/0955 →
SECURITY INTEREST Recorded Oct 31, 2017
From: SUNVERGE ENERGY, INC.
To: SOUTHERN CROSS VENTURE PARTNERS PTY LTD
Reel/Frame 043989/0296 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 29, 2016
From: SANDERS, DEAN; STATMAN, STU
To: SUNVERGE ENERGY, INC.
Reel/Frame 039047/0181 →