IP Library › Granted Patent US 10,393,165
Granted Patent B2
US 10,393,165 · App. 15/242,665 · Granted Aug 27, 2019

Method for producing an adhesive screw connection using a flow drill screw, and flow drill screw usable therefor

Inventor: Norbert Kulzer (Wallersdorf, DE)
Assignee: Bayerische Motoren Werke Aktiengesellschaft
F16B25/0021B32B5/06B32B15/20B32B27/00B32B37/12B32B37/182F16B11/006F16B41/002B32B38/0012B32B2262/101B32B2262/106B32B2305/08B32B2311/24
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,393,165
App. No.
15/242,665
Granted
Aug 27, 2019
Kind
B2
Abstract

A method for producing an adhesive screw connection between at least one upper component and at least one lower component using a flow drill screw, and a corresponding flow drill screw are provided. In the method an adhesive is applied to at least one of the upper and lower components, the flow drill screw penetrates the upper component at the joining point through a pre-drilled hole, and the flow drill screw is screwed into the lower component to form a flow-drilled hole and to join the upper and lower components. A protective ring through which a screw shank of the flow drill screw passes during the screwing-in operation is located in the pre-drilled hole. The protective ring may be capitvely held on the screw shank of the flow drill screw.

Claims (31)

1. A method for producing an adhesive screw connection between an upper component and a lower component, comprising the acts of:

applying an adhesive to at least one of the upper component and the lower component;

inserting a flow drill screw through a hole in the upper component into contact with the lower component; and

screwing the flow drill screw into the lower component to form a flow-drilled hole;

wherein

an underside surface of a head of the flow drill screw is flat, and

in the act of screwing the flow drill screw into the lower component a screw shank of the flow drill screw passes through a flangeless protective ring located in the hole, the protective ring being configured such that after screwing in the flow drill screw no portion of the protective ring is above an outer surface of the upper component when the flow drill screw is in an installed position.

2. The method as claimed in claim 1 , wherein

in the inserting act the protective ring is inserted together with the flow drill screw into the hole in the upper component.

3. The method as claimed in claim 2 , wherein

the protective ring is held on the screw shank of the flow drill screw during the inserting act.

4. The method as claimed in claim 1 , wherein

an axial length of the protective ring is less than or equal to a thickness of the upper component.

5. A method for producing an adhesive screw connection between an upper component and a lower component, comprising the acts of:

applying an adhesive to at least one of the upper component and the lower component;

inserting a flow drill screw through a hole in the upper component into contact with the lower component; and

screwing the flow drill screw into the lower component to form a flow-drilled hole;

wherein

in the act of screwing the flow drill screw into the lower component a screw shank of the flow drill screw passes through a protective ring located in the hole

an axial length of the protective ring is greater than a thickness of the upper component, and

in the screwing act the protecting ring is compressed between the lower component and a screw head of the flow drill screw and deformed.

6. A method for producing an adhesive screw connection between an upper component and a lower component, comprising the acts of:

applying an adhesive to at least one of the upper component and the lower component;

inserting a flow drill screw through a hole in the upper component into contact with the lower component; and

screwing the flow drill screw into the lower component to form a flow-drilled hole;

wherein

in the act of screwing the flow drill screw into the lower component a screw shank of the flow drill screw passes through a protective ring located in the hole,

an axial length of the protective ring is greater than a thickness of the upper component, and

in the screwing act as the protective ring is compressed between the lower component and a screw head of the flow drill screw such that a predefined gap is created between the upper component and the lower component.

7. The method as claimed in claim 1 , further

in the applying act the adhesive is applied such that a portion of the adhesive penetrates into the hole in the upper component and adhesively bonds the protective ring within the hole.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 22, 2016
From: KULZER, NORBERT
To: BAYERISCHE MOTOREN WERKE AKTIENGESELLSCHAFT
Reel/Frame 039493/0862 →
Priority Claims (1)
DE 10 2014 203 274 · Feb 24, 2014 · national
Continuity (2)
Continuation PCTEP2015052271 · Feb 4, 2015
Related Publication 20170045074A1 · Feb 16, 2017
Cited By (3)
US 12,221,997 US 12,239,188 US 12,364,307