IP Library Granted Patent US 9,682,815
Granted Patent B2
US 9,682,815 · App. 15/251,020 · Granted Jun 20, 2017

Methods of storing and moving proppant at location adjacent rail line

Inventor: John Oren (Houston, TX)
Assignee: OREN TECHNOLOGIES, LLC
B65D88/54B60P1/6418B60P3/00B61B1/005B61D7/02B65D88/022B65D88/26B65D88/56B65D88/70B65D90/008B65D90/34B65D90/54B65G57/02B65G57/09B65G57/20B65G65/00B65G65/23B65G65/30B65G65/32B65G65/34B65G65/42B65G67/02B65G67/04B65G67/24E21B43/26E21B43/267B65D88/12B65D2588/12B65D2588/54B65G57/00B65G2203/0216
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,682,815
App. No.
15/251,020
Granted
Jun 20, 2017
Kind
B2
Abstract

A method of delivering proppant to a well site has the steps of transporting a load of proppant in a vessel to a desired location, moving the load of proppant from the vessel into a container so as to create a proppant-loaded container, unloading the proppant-loaded container into a pneumatic bulk trailer, and transporting the unloaded proppant in the pneumatic bulk trailer to well site. The container is placed onto a bed of a truck and moved in proximity to the vessel. The proppant-loaded container is placed onto a tilting mechanism and then tilted so that the proppant is discharged through a flow gate of a container into a hopper. The proppant in the hopper can then be conveyed to the pneumatic bulk trailer.

Claims (42)

1. A method of storing and moving fracking proppant at a desired location in a plurality of separate containers constructed to store fracking proppant therein, the method comprising:

a) stacking a plurality of containers separate from a vehicle on top of one another so that a bottom of one of the plurality of containers overlies the top of another one of the plurality of containers to thereby define a stack, the stack positioned at a desired location, the structural integrity of the plurality of containers being enhanced by a plurality of structural uprights positioned to extend from the bottom to the top of each of the plurality of containers and thereby increase the weight carrying capacity of each of the plurality of containers when fracking proppant is positioned therein;

b) placing one or more of the plurality of containers from the stack onto one or more trailers of one or more vehicles by use of a container loader/unloader so that the one or more of the plurality of containers from the stack placed onto the one or more trailers defines a first one or more of the plurality of containers from the stack and so that remaining containers of the plurality of containers define a second one or more of the plurality of containers from the stack;

c) moving the first plurality of containers when positioned on the one or more trailers away from the stack of the second one or more of the plurality of containers; and

d) scaling the number of the plurality of containers according to the amount of proppant required at a particular location, each of the plurality of containers positioned to include an outlet adjacent the bottom for discharge of proppant therefrom, an opening adjacent the top thereof to load proppant therein, a pair of spaced-apart end walls connected to and extending between the bottom and the top, a pair of side walls connected to and extending between the pair of end walls and the top and the bottom, one or more structural support members positioned to support each of the side walls of the pair of side walls and each of the end walls of the pair of end walls, and a flow gate positioned adjacent the outlet to control flow of proppant through the outlet each of the plurality of containers.

2. The method of claim 1 , further comprising:

before step a), transporting proppant on one or more railcars to the desired location, the desired location being adjacent a rail line, each railcar configured to transport an amount of proppant equal to or greater than the amount of proppant required to fill substantially at least two of the plurality of containers.

3. The method of claim 1 , wherein the moving includes positioning each of the plurality of containers when proppant is contained therein adjacent a fracturing operation of a production field.

4. The method of claim 1 , wherein the plurality of containers each has proppant therein and includes four containers, wherein the four containers are positioned in the stack, wherein the stack comprises a first stack, wherein the method further comprises stacking another plurality of containers that each have proppant therein closely adjacent the first stack thereby to define a second stack, and wherein the one or more structural support members include a plurality of support bars.

5. The method of claim 1 , further comprising:

tracking the amount of proppant on hand at the desired location with bar-codes or logging mechanisms.

6. The method of claim 1 , further comprising:

injecting air into each of the plurality of containers to enhance flow of proppant from the outlet of each of the plurality of containers adjacent the flow gate when the flow gate is positioned to allow proppant to flow therefrom.

7. The method of claim 1 , further comprising:

tracking the mesh size of the proppant in the containers at the location with bar-codes or logging mechanisms.

8. The method of claim 1 , further comprising staging a plurality of empty containers at a proppant site.

9. The method of claim 1 , wherein the outlet of each of the plurality of containers is positioned in a substantially central portion of the bottom of the container, wherein the one or more structural support members of each of the plurality of containers further includes a plurality of horizontal structural members extending between the plurality of structural uprights.

10. The method of claim 1 , wherein the container loader/unloader comprises a forklift, and the method further comprising:

positioning prongs of a forklift in one or more slots positioned adjacent the bottom of each of the plurality of containers in a defined region thereby to enhance lifting and positioning of the containers for stacking and moving.

11. A method of storing and moving fracking proppant at a desired location in a plurality of separate containers constructed to store fracking proppant therein, the method comprising:

a) removing fracking proppant from a railcar;

b) storing the proppant in a plurality of containers separate from the railcar, each container of the plurality of containers comprising:

an opening adjacent the top thereof to receive proppant into the container, a pair of spaced-apart end walls connected to and extending between the bottom and the top, and a pair of sidewalls connected to an extending between the pair of end walls and the top and the bottom, and one or more structural support members extending between the pair of end walls and one or more structural support members extending between the side walls,

an outlet positioned in a substantially central portion of the container to discharge proppant therefrom, and

a flow gate positioned adjacent the outlet to control flow of proppant through the outlet;

c) transporting one or more of the plurality of containers with one or more vehicle trailers;

d) removing the one or more of the plurality of containers from the one or more vehicle trailers;

e) positioning prongs of a forklift in one or more slots positioned adjacent the bottom of each of the plurality of containers in a defined region to thereby enhance lifting and positioning of the containers for stacking and moving the plurality of containers; and

f) scaling the number of containers at the desired location according to the amount of proppant required at a particular location, each of the plurality of containers has a plurality of structural uprights positioned to extend from the bottom to the top of each of the plurality of containers at intervals between the side walls and the end walls to thereby increase the weight carrying capacity of each of the plurality of containers.

12. The method of claim 11 , wherein step b) further comprises:

stacking the plurality of containers on top of one another so that a bottom of one of the plurality of containers overlies the top of another one of the plurality of containers to thereby define a stack to reduce the footprint of the stored containers.

13. The method of claim 12 , wherein the plurality of containers that each has proppant therein includes two or more containers, wherein the two or more containers are positioned in the stack, wherein the stack comprises a first stack, and wherein the method further comprises stacking another plurality of containers that each have proppant therein closely adjacent the first stack thereby to define a second stack.

14. The method of claim 11 , further comprising:

before step a), transporting proppant to the location adjacent a rail line on one or more railcars, each railcar configured to transport an amount of proppant equal to or greater than the amount of proppant required to fill at least two of the plurality of containers.

15. The method of claim 11 , wherein the transporting includes positioning each of the plurality of containers that has proppant contained therein adjacent a fracturing operation of a production field.

16. The method of claim 11 , further comprising:

tracking the amount of proppant on hand at a location with bar-codes or logging mechanisms.

17. The method of claim 16 , further comprising:

tracking the mesh size of the proppant in the containers at the location with bar-codes or logging mechanisms.

18. The method of claim 11 , further comprising staging a plurality of empty containers at a proppant site.

19. The method of claim 11 , further comprising:

injecting air into each of the plurality of containers to enhance flow of proppant from the outlet of each of the plurality of containers adjacent the flow gate when discharging proppant therefrom.

Assignments (5)
RELEASE OF SECURITY INTEREST Recorded Aug 1, 2024
From: BNP PARIBAS, AS COLLATERAL AGENT
To: U.S. SILICA COMPANY; OREN TECHNOLOGIES, LLC; SANDBOX LOGISTICS, LLC
Reel/Frame 068459/0231 →
NOTICE OF GRANT OF SECURITY INTEREST IN INTELLECTUAL PROPERTY (FIRST LIEN) Recorded Jul 31, 2024
From: SANDBOX ENTERPRISES, LLC
To: WILMINGTON TRUST, NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 068236/0081 →
IP ASSIGNMENT AGREEMENT Recorded Oct 28, 2020
From: OREN TECHNOLOGIES, LLC
To: SANDBOX ENTERPRISES, LLC
Reel/Frame 054443/0731 →
SECURITY INTEREST Recorded May 3, 2018
From: U.S. SILICA COMPANY, A DE CORPORATION; OREN TECHNOLOGIES, LLC, A TX LLC; SANDBOX LOGISTICS, LLC, A TX LLC
To: BNP PARIBAS
Reel/Frame 046434/0308 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 30, 2016
From: OREN, JOHN
To: OREN TECHNOLOGIES, LLC
Reel/Frame 039574/0906 →
Continuity (16)
Continuation 15143893 · May 2, 2016
Continuation 14851005 · Sep 11, 2015
Continuation 14314468 · Jun 25, 2014
Continuation 14310648 · Jun 20, 2014
Continuation PCTUS2013032819 · Mar 18, 2013
Continuation 13427140 · Mar 22, 2012
Continuation In Part 13332937 · Dec 21, 2011
Continuation In Part 15251020
Continuation 15143942 · May 2, 2016
Continuation 14851005 · Sep 11, 2015
Continuation 14314468 · Jun 25, 2014
Continuation 14310648 · Jun 20, 2014
Continuation PCTUS2013032819 · Mar 18, 2013
Continuation 13427140 · Mar 22, 2012
Continuation In Part 13332937 · Dec 21, 2011
Related Publication 20160368704A1 · Dec 22, 2016