IP Library Granted Patent US 9,834,834
Granted Patent B2
US 9,834,834 · App. 15/254,972 · Granted Dec 5, 2017

Apparatus for supplying Zn—Al alloy to molten zinc pot

Inventors: Yu Yamauchi (Tokyo, JP); Mikio Kawamura (Tokyo, JP); Masaaki Omodaka (Tokyo, JP); Hideki Nishimura (Tokyo, JP)
Assignee: NIPPON STEEL & SUMITOMO METAL CORPORATION
C23C2/06B05C3/04C23C2/003C23C2/40
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,834,834
App. No.
15/254,972
Granted
Dec 5, 2017
Kind
B2
Abstract

A method of supplying a Zn—Al alloy to a molten zinc pot which accommodates a molten zinc bath in a hot dip galvanizing line, includes: supplying the Zn—Al alloy from a supply portion provided at a lower portion of an insertion guide having a pipe shape, in which the supply portion is immersed between an inner wall of the molten zinc pot on a downstream side in a travelling direction of a steel sheet and a front support roll installed in the molten zinc bath at a depth within ±400 mm from a lower end of the front support roll, and an inside of the insertion guide is pressurized by inert gas to prevent the molten zinc bath from advancing to the inside of the insertion guide.

Claims (28)

1. An apparatus for supplying a Zn—Al alloy to a molten zinc pot which accommodates a molten zinc bath in which a front support roll is immersed in a hot dip galvanizing line, the apparatus comprising,

an insertion guide having a pipe shape, which has an inert gas supply portion at a lower portion and is installed between an inner wall of the molten zinc pot on a downstream side in a travelling direction of a steel sheet and the front support roll installed in the molten zinc bath,

wherein

an installation position of the inert gas supply portion is in the molten zinc bath and at a depth within ±400 mm from a lower end of the front support roll,

the Zn—Al alloy is supplied to the molten zinc bath from the inert gas supply portion of the insertion guide,

the front support roll is situated between (a) the inner wall of the molten zinc pot on the downstream side in the travelling direction of a steel sheet being galvanized in the apparatus and (b) a boundary between a first area of the steel sheet in contact with the front support roll and a second area of the steel sheet which is out of contact with the front support roll and moves away from the front support roll.

2. The apparatus for supplying a Zn—Al alloy to a molten zinc pot according to claim 1 ,

wherein the installation position of the inert gas supply portion is in the molten zinc bath and at a depth within ±300 mm from the lower end of the front support roll.

3. The apparatus for supplying a Zn—Al alloy to a molten zinc pot according to claim 1 ,

wherein the installation position of the inert gas supply portion is in the molten zinc bath and at a depth within ±200 mm from the lower end of the front support roll.

4. The apparatus for supplying a Zn—Al alloy to a molten zinc pot according to claim 1 ,

wherein the installation position of the inert gas supply portion is in the molten zinc bath and in a range from a first plane including an edge of the steel sheet and perpendicular to a width direction of the steel sheet to a second plane including a line on the steel sheet 100% of a width of the steel sheet away from the edge of the steel sheet and perpendicular to the width direction of the steel sheet.

5. The apparatus for supplying a Zn—Al alloy to a molten zinc pot according to claim 1 ,

wherein the installation position of the inert gas supply portion is in the molten zinc bath, at a depth within ±300 mm from the lower end of the front support roll, and in a range from a first plane including an edge of the steel sheet and perpendicular to a width direction of the steel sheet to a second plane including a line on the steel sheet 100% of a width of the steel sheet away from the edge of the steel sheet and perpendicular to the width direction of the steel sheet.

6. The apparatus for supplying a Zn—Al alloy to a molten zinc pot according to claim 1 ,

wherein the installation position of the inert gas supply portion is in the molten zinc bath, at a depth within ±200 mm from the lower end of the front support roll, and in a range from a first plane including an edge of the steel sheet and perpendicular to a width direction of the steel sheet to a second plane including a line on the steel sheet 100% of a width of the steel sheet away from the edge of the steel sheet and perpendicular to the width direction of the steel sheet.

7. The apparatus for supplying a Zn—Al alloy to a molten zinc pot according to claim 1 ,

wherein the installation position of the inert gas supply portion is in the molten zinc bath and in a range from a first plane including a first line on the steel sheet a length of 20% of a width of the steel sheet away from an edge of the steel sheet and perpendicular to a width direction of the steel sheet to a second plane including a second line on the steel sheet the length of 80% of a width of the steel sheet away from the edge of the steel sheet and perpendicular to the width direction of the steel sheet.

8. The apparatus for supplying a Zn—Al alloy to a molten zinc pot according to claim 1 ,

wherein the installation position of the inert gas supply portion is in the molten zinc bath, at a depth within ±300 mm from the lower end of the front support roll, and in a range from a first plane including a first line on the steel sheet a length of 20% of a width of the steel sheet away from an edge of the steel sheet and perpendicular to a width direction of the steel sheet to a second plane including a second line on the steel sheet the length of 80% of a width of the steel sheet away from the edge of the steel sheet and perpendicular to the width direction of the steel sheet.

9. The apparatus for supplying a Zn—Al alloy to a molten zinc pot according to claim 1 ,

wherein the installation position of the inert gas supply portion is in the molten zinc bath, at a depth within ±200 mm from the lower end of the front support roll, and in a range from a first plane including a first line on the steel sheet a length of 20% of a width of the steel sheet away from an edge of the steel sheet and perpendicular to a width direction of the steel sheet to a second plane including a second line on the steel sheet the length of 80% of a width of the steel sheet away from the edge of the steel sheet and perpendicular to the width direction of the steel sheet.

10. The apparatus for supplying a Zn—Al alloy to a molten zinc pot according to claim 1 ,

wherein the installation position of the inert gas supply portion is in the molten zinc bath and in a range from a first plane including a first line on the steel sheet a length of 40% of a width of the steel sheet away from an edge of the steel sheet and perpendicular to a width direction of the steel sheet to a second plane including a second line on the steel sheet the length of 60% of a width of the steel sheet away from the edge of the steel sheet and perpendicular to the width direction of the steel sheet.

11. The apparatus for supplying a Zn—Al alloy to a molten zinc pot according to claim 1 ,

wherein the installation position of the inert gas supply portion is in the molten zinc bath, at a depth within ±300 mm from the lower end of the front support roll, and in a range from a first plane including a first line on the steel sheet a length of 40% of a width of the steel sheet away from an edge of the steel sheet and perpendicular to a width direction of the steel sheet to a second plane including a second line on the steel sheet the length of 60% of a width of the steel sheet away from the edge of the steel sheet and perpendicular to the width direction of the steel sheet.

12. The apparatus for supplying a Zn—Al alloy to a molten zinc pot according to claim 1 ,

wherein the installation position of the inert gas supply portion is in the molten zinc bath, at a depth within ±200 mm from the lower end of the front support roll, and in a range from a first plane including a first line on the steel sheet a length of 40% of a width of the steel sheet away from an edge of the steel sheet and perpendicular to a width direction of the steel sheet to a second plane including a second line on the steel sheet the length of 60% of a width of the steel sheet away from the edge of the steel sheet and perpendicular to the width direction of the steel sheet.

Assignments (1)
CHANGE OF NAME Recorded May 14, 2019
From: NIPPON STEEL & SUMITOMO METAL CORPORATION
To: NIPPON STEEL CORPORATION
Reel/Frame 049257/0828 →
Priority Claims (1)
JP 2012-047546 · Mar 5, 2012 · national
Continuity (2)
Division 14124306
Related Publication 20160369384A1 · Dec 22, 2016