IP Library Granted Patent US 10,371,373
Granted Patent B2
US 10,371,373 · App. 15/288,753 · Granted Aug 6, 2019

Boiler tube clamp and method of using same

Inventors: Kurt Johnson (Ringgold, GA); Robert Hunter (Ringgold, GA); David Duplissey (Chattanooga, TN)
Assignee: National Boiler Service, Inc.
F22B37/104B21D53/06B23P15/26B25B27/02B25B27/023B25B27/06B25B27/062F16L3/1075B21D39/06Y10T29/49387Y10T29/53848
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,371,373
App. No.
15/288,753
Granted
Aug 6, 2019
Kind
B2
Abstract

A boiler tube clamp including a first U-shaped midsection configured for pressing against one side of a boiler tube, a first hinge member arranged on one end of the first midsection, a threaded bolt hingedly attached to the other end of the first midsection, and a second U-shaped midsection configured for pressing against the other side of the boiler tube. The clamp further includes a second hinge member arranged on one end of the second midsection and hingedly connected to the first hinge member so that the first inner surface and the second inner surface close toward one another. A lip extends radially out from the second midsection and a jackscrew extends through the lip for adjusting the distance a boiler tube contained by the clamp extends into a boiler through a boiler header.

Claims (36)

1. A method of installing a boiler tube in a boiler header comprising,

clamping a clamp about a predetermined location of the boiler tube, the clamp including a lower edge and an outwardly extending radial lip spaced apart from the lower edge,

inserting the boiler tube into an opening through the boiler header,

supporting the boiler clamp and the boiler tube on the boiler header with the lower edge of the clamp in contact with the boiler header,

wherein the predetermined location is based upon a desired distance the boiler tube is to extend beyond a bottom side of the boiler header, and thereafter,

adjusting a distance the boiler tube is inserted into the boiler header by raising or lowering the clamp using the radial lip, wherein the lip is configured for engagement by a pry bar and a jackscrew for adjusting the distance the boiler tube is inserted into the boiler header.

2. The method of claim 1 wherein the desired distance is not less than ¼ inch and no more than ¾ inch.

3. The method of claim 1 comprising determining the predetermined location by measuring a length of the boiler tube starting from a lower end of the boiler tube, the length of the boiler tube being equal to the sum of the desired distance and a thickness of the boiler header or a length of the opening extending through the boiler header.

4. The method of claim 1 wherein the clamp is clamped about the boiler tube with the lower edge of the clamp being aligned with the predetermined location.

5. The method of claim 3 wherein the clamp is clamped about the boiler tube with the lower edge of the clamp being aligned with the predetermined location.

6. The method of claim 1 comprising inserting the pry bar between the radial lip and the boiler header and using the pry bar to raise the clamp and the boiler tube.

7. The method of claim 1 comprising raising or lowering the boiler tube by turning a screw that extends through the radial lip and to and between the radial lip and the boiler header.

8. The method of claim 1 further comprising fixing the boiler tube to the boiler header, followed by removing the clamp from the boiler tube.

9. The method of claim 1 further comprising adjusting a distance the boiler tube extends beyond a bottom side of the boiler header without moving any portion of the clamp relative to the boiler tube.

10. A method of installing a boiler tube in a boiler header comprising,

providing a boiler clamp apparatus having a first portion and a second portion pivotably coupled to the first portion,

pivoting the first portion and the second portion into a closed position about a predetermined location about the boiler tube,

inserting the boiler tube into an opening through the boiler header,

supporting a lower edge of the boiler clamp apparatus and boiler tube on the boiler header,

wherein the predetermined location is based upon a desired distance the boiler tube is to extend beyond a bottom side of the boiler header, and thereafter,

adjusting a distance the boiler tube is inserted into the boiler header by raising or lowering the clamp using a lip extending radially outward from the first portion and spaced apart from the lower edge, wherein the lip is configured for engagement by a pry bar and a jackscrew for adjusting the distance the boiler tube is inserted into the boiler header.

11. The method of claim 10 comprising determining the predetermined location by measuring a length of the boiler tube starting from a lower end of the boiler tube, the length of the boiler tube being equal to the sum of the desired distance and a thickness of the boiler header or a length of the opening extending through the boiler header.

12. The method of claim 11 wherein the clamp is clamped about the boiler tube with the lower edge of the clamp being aligned with the predetermined location.

13. The method of claim 12 comprising inserting a pry bar between the lip and the boiler header and using the pry bar to raise the clamp and boiler tube.

14. The method of claim 13 further comprising fixing the boiler tube to the boiler header, followed by removing the clamp from the boiler tube.

15. The method of claim 13 wherein the clamp and boiler tube are raised without moving any portion of the clamp relative to the boiler tube.

16. A method of installing a boiler tube in a boiler header comprising,

providing a clamp apparatus having a lower edge, an outwardly extending radial lip spaced apart from the lower edge, a first clamp portion and a second clamp portion,

rigidly fixing the boiler tube between the first clamp portion and the second clamp portion, wherein the lower edge is aligned with a predetermined location of the boiler tube,

lowering the clamp apparatus thereby inserting the boiler tube into an opening that extends through the boiler header, and

supporting the lower edge of the clamp apparatus directly on the boiler tube header thereby supporting the boiler tube on the boiler header,

wherein the predetermined location is located at a desired distance from a lower end of the boiler tube, the desired distance being greater than one or both of a thickness of the boiler header and a length of the opening extending through the boiler header, and thereafter,

adjusting a distance the boiler tube is inserted into the boiler header by raising or lowering the radial lip, wherein the lip is configured for engagement by a pry bar and a jackscrew for adjusting the distance the boiler tube is inserted into the boiler header.

17. The method of claim 16 wherein the desired distance is the sum of either the thickness of the boiler header or the length of the opening extending through the boiler header and not less than ¼ inch and no more than ¾ inch.

18. The method of claim 16 comprising adjusting a distance the boiler tube is inserted into the boiler header by raising or lowering an entirety of the clamp apparatus.

19. The method of claim 16 further comprising rigidly coupling the boiler tube directly to the boiler header while the boiler tube is rigidly fixed between the first clamp portion and the second clamp portion, followed by removing the clamp apparatus from the boiler tube.

Assignments (3)
SECURITY INTEREST Recorded Oct 3, 2023
From: NATIONAL BOILER SERVICE, LLC
To: ENTERPRISE BANK & TRUST
Reel/Frame 065110/0436 →
NOTICE OF GRANT OF SECURITY INTEREST Recorded Oct 2, 2023
From: NATIONAL BOILER SERVICE, LLC, A DELAWARE LIMITED LIABILITY COMPANY
To: RGA REINSURANCE COMPANY, AS COLLATERAL AGENT
Reel/Frame 065091/0047 →
NUNC PRO TUNC ASSIGNMENT Recorded Feb 6, 2019
From: HUNTER, ROBERT; JOHNSON, KURT; DUPLISSEY, DAVID
To: NATIONAL BOILER SERVICE, INC.
Reel/Frame 048252/0881 →
Continuity (3)
Continuation 13658028 · Oct 23, 2012
Continuation 12575227 · Oct 7, 2009
Related Publication 20170023238A1 · Jan 26, 2017
Cited By (1)
US 12,228,229