US 10,814,438 · App. 15/335,912 · Granted Oct 27, 2020

Method and arrangement for removing and lifting a blade pitch slewing ring bearing of a wind turbine

Inventors: Anthonyraj Prem Kumar Senthoorpandian (Tirupur, IN); Kalimuthu Nagrathinam (Tirupur, IN)
Assignee: WINDCARE INDIA PVT LTD
B23P6/002F03D13/10F05B2240/916Y02E10/728
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,814,438
App. No.
15/335,912
Granted
Oct 27, 2020
Kind
B2
Abstract

A method and an arrangement for removing and lifting of a blade pitch slewing ring bearing of a wind turbine after a blade from a rotor hub of the wind turbine is removed, is disclosed. The arrangement and method enables the lowering and lifting of the wind turbine without the need of large and heavy cranes so that the replacement can be carried out cost effectively. The arrangement includes a first pulley mounted at the bottom of the wind turbine, a second pulley mounted inside a rotor hub, a lifting line running over the first pulley, the second pulley and further over a third pulley mounted inside a carrier. The carrier supports the blade pitch slewing ring bearing during lifting and lowering which is achieved through a coordinated operation of a ground winch, the lifting line and tag lines. Further, rigging equipment is attached to the lowered blade pitch slewing ring bearing to enable easy transportation.

Claims (15)

1. A method for removal and lifting of a blade pitch slewing ring bearing of a wind turbine after a blade from a rotor hub of said wind turbine is removed, said method comprising:

positioning a first jig at a bottom of said wind turbine;

attaching a first pulley to said first jig at a first attachment point at said bottom of said wind turbine;

attaching a second pulley to a second attachment point at the rotor hub of said wind turbine;

attaching a third pulley at an operative top portion of a carrier positioned in line with said second pulley;

attaching a lifting line from a ground winch over said first pulley, said second pulley and said third pulley; and

removing said blade pitch slewing ring bearing by an operation of said ground winch,

wherein removing said blade pitch slewing ring bearing includes:

positioning said carrier proximate said blade pitch slewing ring bearing of said wind turbine;

fastening said blade pitch slewing ring bearing to a template placed on said carrier at the operative top portion of said carrier;

removing bolts between said blade pitch slewing ring bearing and a hub flange of said wind turbine; and

lowering said blade pitch slewing ring bearing by the operation of said ground winch.

2. The method as claimed in claim 1 , wherein said step of attaching a second pulley comprising the steps of:

positioning a second jig inside said rotor hub of said wind turbine; and

attaching said second pulley to the at least one second jig at said second attachment point.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 5, 2017
From: SENTHOORPANDIAN, ANTHONYRAJ PREM KUMAR; NAGRATHINAM, KALIMUTHU
To: WINDCARE INDIA PVT LTD
Reel/Frame 040858/0467 →
Priority Claims (1)
IN 2193/CHE/2014 · Apr 30, 2014 · national
Continuity (2)
Continuation PCTIB2015053139 · Apr 30, 2015
Related Publication 20170045030A1 · Feb 16, 2017
Cited By (1)
US 12,233,439