IP Library Granted Patent US 10,259,337
Granted Patent B2
US 10,259,337 · App. 15/337,909 · Granted Apr 16, 2019

Electric vehicle battery charge and discharge management

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,259,337
App. No.
15/337,909
Granted
Apr 16, 2019
Kind
B2
Abstract

An adaptive multi-string battery for an electric vehicle is disclosed herein. The battery strings can adaptively be connected to the power bus bars based on the output voltage to be discharged with load. During operation of the vehicle, the voltage, current, and estimate charge can be constantly monitored to change the connected status of the battery strings to the power buses to allow connecting or disconnecting of the battery strings adaptively.

Claims (42)

1. An electric vehicle comprising:

a motor coupled to one or more wheels of the electric vehicle;

an inverter coupled to the motor;

at least a first power bus coupled to the inverter; and

a plurality of battery strings including a first battery string having an output that is coupled to the first power bus through a first switch, a second battery string different from the first battery string having an output that is coupled to the first power bus through a second switch different from the first switch, and a third battery string different from the first and second battery strings having an output that is coupled to the first power bus through a third switch different from the first and second switches;

control circuitry coupled to at least the first switch, the second switch, and the third switch, the control circuitry configured to selectively and independently control the open or closed state of the first, second, and third switches, thereby selectively and independently connecting the output of the first, second, and third battery strings, including:

opening the first switch and, with the first switch open, measuring a first voltage across the first battery string,

opening the second switch and, with the second switch open, measuring a second voltage different from the first voltage across the second battery string,

opening the third switch and, with the third switch open, measuring a third voltage different from the first and second voltage across the third battery string,

closing the first switch, thereby connecting the first battery string to the first power bus, based at least in part on a determination that the first voltage is higher than both the second and third voltage,

closing the second switch, thereby connecting the second battery string to the first power bus, based on a determination that the second voltage is within a first threshold voltage difference below the first voltage,

not closing the third switch, and thereby not connecting the third battery string to the first power bus, based on a determination that the third output voltage is not within the first threshold voltage difference below the first voltage,

upon determining that power is being delivered to the electric motor from at least the first and second battery strings and with the first and second switches closed, measuring a power bus voltage on the first power bus,

determining a derated power bus voltage based on the power bus voltage on the first power bus;

with power being delivered to the electric motor and with at least the first and second switches closed, closing the third switch, thereby connecting the third battery string to the first power bus, based on a determination that the third output voltage is within a second threshold voltage difference below the determined derated power bus voltage.

2. The electric vehicle of claim 1 , comprising a first current sensor in series with the first switch, and a second current sensor in series with the second switch.

3. The electric vehicle of claim 1 , wherein the first battery string and the second battery string have outputs coupled to a second power bus through respective fourth and fifth switches.

4. The electric vehicle of claim 3 , wherein the control circuitry is configured to control the open or closed state of the fourth and fifth switches.

5. The electric vehicle of claim 1 , wherein the first battery string, the second battery string, and the third battery string each comprise a plurality of modules of cells connected in parallel and wherein each of the plurality of modules of cells comprise a plurality of cells connected in series.

6. The electric vehicle of claim 1 , wherein the control circuitry is configured to measure a first output current of the first battery string when the first switch is closed and an output current of the second battery string when the second switch is closed.

7. A method of powering an electric vehicle, the electric vehicle comprising an electric motor driven with a power bus, the method comprising:

determining a plurality of separate output voltages for a corresponding plurality of separate battery strings of the electric vehicle including a first battery string having a first output voltage, a second battery string having a second output voltage, and a third battery string having a third output voltage wherein the first, second, and third output voltages are different from one another;

connecting the first battery string to the power bus based on a determination that the first output voltage is the highest of the plurality of separate output voltages;

connecting the second battery string to the power bus based on a determination that the second output voltage is within a first threshold voltage difference below the first output voltage;

not connecting a third battery string to the power bus based on a determination that the third output voltage is not within the first threshold voltage difference below the first output voltage;

delivering power to the electric motor from at least the first and second battery string;

while delivering power to the electric motor from the first and second battery string, determining a power bus voltage of the power bus;

also while delivering power to the electric motor from the first and second battery string, connecting the third battery string to the power bus based on a determination that the third output voltage is within a second threshold voltage difference below the determined power bus voltage; and

disconnecting different ones of the plurality of battery strings to the power bus based at least in part on the determined plurality of separate output voltages.

8. The method of claim 7 , comprising, prior to delivering power to the electric motor from the first and second battery string, determining that a first set of the plurality of battery strings have output voltages that are within the first threshold voltage difference below the first output voltage, with the remaining plurality of battery strings making up a second set of the plurality of battery strings, and connecting all of the first subset of battery strings to the power bus based on that determination.

9. The method of claim 8 , comprising, prior to delivering power to the electric motor from the first and second battery string, not connecting any of the second set of battery strings.

10. A method of powering an electric vehicle comprising:

initially connecting some but not all of a plurality of battery strings of the electric vehicle to a power bus;

loading the power bus with an electric motor of the electric vehicle;

while the power bus is loaded with the electric motor, measuring the voltage of the power bus;

measuring a voltage of an unconnected one of the plurality of battery strings; and

while still loading the power bus with the electric motor, connecting the unconnected one of the plurality of battery strings to the power bus if based on a determination that the voltage of the unconnected one of the plurality of battery strings is within a threshold voltage below the measured voltage of the power bus.

11. The method of claim 10 , further comprising measuring at least one discharge current for at least one connected one of the plurality of battery strings.

12. The method of claim 11 , further comprising: disconnecting a connected one of the plurality of battery strings if the discharge current of the connected one of the plurality of battery strings is below a threshold.

13. The method of claim 11 , further comprising:

storing a measured initial voltage of at least one of the plurality of battery strings; estimating a state of charge of at least one of the plurality of battery strings based in at least part on the stored initial voltage and the measured discharge current of the at least one of the plurality of battery strings;

and disconnecting the at least one of the plurality of battery strings if the estimated state of charge of the at least one of the plurality of battery strings is below a threshold.

Assignments (10)
SECURITY INTEREST Recorded Sep 25, 2024
From: FARADAY&FUTURE, INC.
To: SENYUN INTERNATIONAL LTD.
Reel/Frame 069048/0500 →
SECURITY INTEREST Recorded Aug 15, 2022
From: FARADAY&FUTURE INC.
To: FF SIMPLICY VENTURES LLC
Reel/Frame 061176/0756 →
RELEASE OF SECURITY INTEREST RECORDED AT REEL/FRAME 050234/0069 Recorded Jun 8, 2022
From: ARES CAPITAL CORPORATION, AS SUCCESSOR COLLATERAL AGENT
To: CITY OF SKY LIMITED; EAGLE PROP HOLDCO LLC; FARADAY & FUTURE INC.; FARADAY FUTURE LLC; FF EQUIPMENT LLC; FF HONG KONG HOLDING LIMITED; FF INC.; FF MANUFACTURING LLC; ROBIN PROP HOLDCO LLC; SMART KING LTD.; SMART TECHNOLOGY HOLDINGS LTD.; FARADAY SPE, LLC
Reel/Frame 060314/0263 →
ACKNOWLEDGEMENT OF SUCCESSOR COLLATERAL AGENT UNDER INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Jul 29, 2021
From: BIRCH LAKE FUND MANAGEMENT, LP, AS RETIRING AGENT
To: ARES CAPITAL CORPORATION, AS SUCCESSOR AGENT
Reel/Frame 057019/0140 →
SECURITY INTEREST Recorded Oct 14, 2020
From: ROYOD LLC
To: BIRCH LAKE FUND MANAGEMENT, LP
Reel/Frame 054076/0157 →
ACKNOWLEDGEMENT OF SUCCESSOR COLLATERAL AGENT UNDER INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Mar 5, 2020
From: BIRCH LAKE FUND MANAGEMENT, LP, AS RETIRING AGENT
To: ROYOD LLC, AS SUCCESSOR AGENT
Reel/Frame 052102/0452 →
SECURITY INTEREST Recorded May 1, 2019
From: CITY OF SKY LIMITED; EAGLE PROP HOLDCO LLC; FARADAY FUTURE LLC; FE EQUIPMENT LLC; FF HONG KONG HOLDING LIMITED; FF INC.; FF MANUFACTURING LLC; ROBIN PROP HOLDCO LLC; SMART KING LTD.; SMART TECHNOLOGY HOLDINGS LTD.; FARADAY SPE, LLC; FARADAY & FUTURE INC.
To: BIRCH LAKE FUND MANAGEMENT, LP
Reel/Frame 050234/0069 →
RELEASE OF SECURITY INTEREST Recorded Jan 14, 2019
From: SEASON SMART LIMITED
To: FARADAY&FUTURE INC.
Reel/Frame 048069/0704 →
SECURITY INTEREST Recorded Dec 28, 2017
From: FARADAY&FUTURE INC.
To: SEASON SMART LIMITED
Reel/Frame 044969/0023 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 31, 2016
From: ALSER, JOHN; CHIDESTER, DOUGLAS D.; PARYANI, ANIL; WEICKER, PHILLIP JOHN
To: FARADAY&FUTURE INC.
Reel/Frame 040175/0292 →
Cited By (5)
US 12,301,028 US 12,325,326 US 12,374,913 US 12,567,752 US 12,580,394