IP Library Granted Patent US 10,125,641
Granted Patent B2
US 10,125,641 · App. 15/339,987 · Granted Nov 13, 2018

Dual integrated PSA for simultaneous power plant emission control and enhanced hydrocarbon recovery

Inventors: Narasimhan Sundaram (Annandale, NJ); Hans Thomann (Bedminster, NJ); Franklin F. Mittricker (Jamul, CA); Loren Starcher (Sugar Land, TX)
Assignee: EXXONMOBIL RESEARCH AND ENGINEERING COMPANY
F01K23/10B01D53/047C10L3/104E21B43/164F01K7/16F02C3/00B01D2256/10B01D2256/245B01D2257/504C10L2290/02C10L2290/10C10L2290/12C10L2290/543E21B41/0064F05D2220/32Y02C10/08Y02E20/16
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,125,641
App. No.
15/339,987
Granted
Nov 13, 2018
Kind
B2
Abstract

Systems and methods are provided for combined cycle power generation and enhanced hydrocarbon production where emission gases during power generation are separated by adsorption and applied to facilitate extraction of hydrocarbons from a reservoir. A power generation plant passes exhaust gas to a first swing adsorption reactor. The first swing adsorption reactor adsorbs the CO 2 from the exhaust gas. An adsorption cycle of the first swing adsorption reactor is variable. An injection well injects the CO 2 adsorbed by the first swing adsorption reactor in a hydrocarbon reservoir. A production well that is in communication with the injection well produces a mixture of hydrocarbons and CO 2 . A second swing adsorption reactor purifies the produced hydrocarbons by adsorbing the produced CO 2 from the production well.

Claims (27)

1. A method, comprising:

passing exhaust gas from a power generation plant to a first swing adsorption reactor, wherein the exhaust gas includes CO 2 and N 2 ;

adsorbing the CO 2 from the exhaust gas on a first adsorbent material of the first swing adsorption reactor, wherein an adsorption cycle of the first swing adsorption reactor is variable;

injecting the CO 2 adsorbed by the first swing adsorption reactor, along with CH 4 from a production well, in a hydrocarbon reservoir by using an injection well;

producing a mixture of hydrocarbons, including at least CH 4 , and CO 2 by using the production well, which is in communication with the injection well; and

purifying the mixture of hydrocarbons, which includes at least a mixture of CH 4 and CO 2 by adsorbing the CO 2 mixed with the mixture of hydrocarbons on a second adsorbent material of a second swing adsorption reactor, wherein a mixture of CO 2 adsorbed by the second swing adsorption reactor, steam, and CH 4 from the production well are used to purge the first swing adsorption reactor, and an amount of steam used in the purge of the first swing adsorption reactor increases as an amount of CO 2 used to produce the mixture hydrocarbons increases.

2. The method of claim 1 , wherein a N 2 stream unadsorbed by the first swing adsorption reactor exits the first swing adsorption reactor at a pressure that is substantially the same as a pressure of the exhaust gas from the power generation plant.

3. The method of claim 1 , further comprising:

recovering a N2 stream unadsorbed by the first swing adsorption reactor.

4. The method of claim 1 , further comprising:

purging the second swing adsorption reactor with a stream of N 2 unadsorbed by the first swing adsorption reactor.

5. The method of claim 1 , further comprising:

feeding at least a portion of the purified hydrocarbons back into the power generation plant and generating power.

6. The method of claim 1 , further comprising:

varying the adsorption cycle of the first swing adsorption reactor to adjust composition of adsorbed CO 2 based on a composition of hydrocarbons in the hydrocarbon reservoir.

7. The method of claim 6 , wherein the composition of the hydrocarbons in the hydrocarbon reservoir varies with age of the reservoir.

8. The method of claim 1 , wherein at least one of the first swing adsorption reactor and the second swing adsorption reactor is a high-temperature reactor.

9. The method of claim 1 , further comprising:

purging the second swing adsorption reactor with at least one of a stream of CO 2 and a stream of CH 4 flowing from the production well.

10. A system, comprising:

a power generation plant that produces exhaust gas, wherein the exhaust gas includes CO 2 and N2;

a first swing adsorption reactor, wherein the power generation plant passes the exhaust gas to the first swing adsorption reactor, wherein the first swing adsorption reactor adsorbs the CO 2 from the exhaust gas on a first adsorbent material of the first swing adsorption reactor, and wherein an adsorption cycle of the first swing adsorption reactor is variable;

an injection well that injects the CO2 adsorbed by the first swing adsorption reactor along with CH 4 from a production well, in a hydrocarbon reservoir;

the production well that is in communication with the injection well and that produces a mixture of hydrocarbons, including at least CH4, and CO 2 ; and

a second swing adsorption reactor that purifies the mixture of hydrocarbons, which includes at least a mixture of CH 4 and CO 2 , from the production well by adsorbing the CO 2 mixed with the mixture of hydrocarbons on a second adsorbent material of the second swing adsorption reactor, wherein a mixture of CO 2 adsorbed by the second swing adsorption reactor, steam, and CH 4 from the production well are used to purge the first swing adsorption reactor, and an amount of steam used in the purge of the first swing adsorption reactor increases as an amount of CO 2 used to produce the mixture hydrocarbons increases.

11. The system of claim 10 , wherein the adsorption cycle of the first swing adsorption reactor is varied to adjust composition of adsorbed CO 2 based on a composition of hydrocarbons in the hydrocarbon reservoir.

12. The system of claim 10 , wherein at least a portion of the purified hydrocarbons are fed back into the power generation plant to generate power.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 3, 2020
From: EXXONMOBIL RESEARCH AND ENGINEERING COMPANY
To: EXXONMOBIL UPSTREAM RESEARCH COMPANY
Reel/Frame 052822/0181 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 2, 2017
From: STARCHER, LAUREN
To: EXXONMOBIL RESEARCH AND ENGINEERING COMPANY
Reel/Frame 043417/0607 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 2, 2017
From: STARCHER, LOREN
To: EXXONMOBIL RESEARCH AND ENGINEERING COMPANY
Reel/Frame 043417/0684 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 19, 2016
From: SUNDARAM, NARASIMHAN; THOMANN, HANS; MITTRICKER, FRANKLIN F.
To: EXXONMOBIL RESEARCH AND ENGINEERING COMPANY
Reel/Frame 040665/0168 →
Continuity (2)
Provisional Application 62256341 · Nov 17, 2015
Related Publication 20170138222A1 · May 18, 2017
Cited By (3)
US 12,473,811 US 12,521,676 US 12,533,623