System and method for providing supercritical steam

Inventors: Wei Zhang (South Windsor, CT); Armand Levasseur (Windsor Locks, CT); Tidjani Niass (Dhahran, SA); Mourad Younes (Abquiq, SA); Glen Jukkola (Glastonbury, CT); Bruce Wilhelm (Enfield, CT); Daryl Philo (Weatogue, CT); Timothy Maidenford (Joliett, PA)
Assignee: GENERAL ELECTRIC TECHNOLOGY GMBH
F01K3/20F01K3/24F01K7/32F01K11/02F01K19/00F01K23/10F22B1/1815F22B33/00Y02E20/344
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,465,562
App. No.
15/340,670
Granted
Nov 5, 2019
Kind
B2
Abstract

A system for providing supercritical steam including a first boiler that generates steam via combusting a first fuel, and a second boiler fluidly connected to the first boiler via a conduit which heats the generated steam to supercritical steam temperatures via combusting a second fuel. A first temperature of the conduit may be below a critical corrosion temperature and a second temperature of the conduit is greater than or equal to the critical corrosion temperature. A combined carbon emission rate of the first boiler and the second boiler may be less than a combined carbon emission rate of generating and heating the steam to supercritical steam temperatures using boilers that only combust the first fuel. The first boiler may be fluidly connected to a heat exchanger that heats the generated steam to a supercritical steam temperature via a flue gas produced by a gas turbine.

Claims (21)

1. A system for providing supercritical steam comprising:

a primary boiler that generates steam via combustion of a first fuel;

a gas turbine that produces a flue gas via combustion of a second fuel that is different from the first fuel;

a heat exchanger fluidly connected to the primary boiler and to the gas turbine via a first conduit and a second conduit, respectively, wherein the generated steam and the flue gas flow from the primary boiler and the gas turbine via the first conduit and the second conduit, respectively, to the heat exchanger which heats the generated steam via the flue gas to a supercritical steam temperature; and

wherein the heat exchanger is incorporated into a secondary boiler that heats the generated steam via combusting a fuel.

2. The system of claim 1 , wherein a first temperature of the first conduit is below a critical corrosion temperature at which contaminants produced by combusting the first fuel corrode the first conduit and a second temperature of the first conduit is greater than or equal to the critical corrosion temperature.

3. The system of claim 1 , wherein a combined carbon emission rate of the primary boiler and the gas turbine is less than a combined carbon emission rate of generating and heating the steam to a supercritical steam temperature using one or more boilers that only combust the first fuel.

4. The system of claim 1 , wherein the first fuel is at least one of a heavy oil residue, a heavy fuel oil, and a solid fuel.

5. The system of claim 1 , wherein the secondary boiler heats the generated steam by combusting the second fuel.

6. The system of claim 1 , wherein the second fuel is a gas or a combination of a gas blended with at least one of a liquid or a solid fuel.

7. A method for providing supercritical steam, the method comprising:

generating steam via combusting a first fuel in a primary boiler fluidly connected to a heat exchanger via a first conduit wherein the generated steam flows to the heat exchanger from the primary boiler via the first conduit, and the heat exchanger is incorporated into a secondary boiler that heats the generated steam via combusting a fuel; and

heating the generated steam to a supercritical steam temperature via a flue gas produced by combusting a second fuel in a gas turbine fluidly connected to the heat exchanger via a second conduit wherein the flue gas flows to the heat exchanger via the second conduit, the second fuel being different from the first fuel.

8. The method of claim 7 , wherein a first temperature of the first conduit is below a critical corrosion temperature at which contaminants produced by combusting the first fuel corrode the first conduit and a second temperature of the first conduit is greater than or equal to the critical corrosion temperature.

9. The method of claim 7 , wherein a combined carbon emission rate of the primary boiler and the gas turbine is less than a combined carbon emission rate of generating and heating the steam to a supercritical steam temperature using one or more boilers that only combust the first fuel.

10. The method of claim 7 , wherein the first fuel is at least one of a heavy oil residue, a heavy fuel oil, and a solid fuel.

11. The method of claim 7 , wherein the secondary boiler heats the generated steam by combusting the second fuel.

12. The method of claim 7 further comprising:

directing the flue gas into at least one of the primary boiler or the secondary boiler after the heat exchanger has heated the generated steam via the flue gas.

13. The method of claim 7 further comprising:

generating power via the gas turbine prior to generating steam via combusting the first fuel in the primary boiler.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 17, 2021
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: ARAMCO OVERSEAS COMPANY B.V.
Reel/Frame 056570/0706 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 17, 2021
From: ARAMCO OVERSEAS COMPANY B.V.
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 056570/0799 →
CHANGE OF ADDRESS Recorded Apr 8, 2021
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 056185/0981 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 1, 2016
From: ZHANG, WEI; LEVASSEUR, ARMAND; NIASS, TIDJANI; YOUNES, MOURAD; JUKKOLA, GLEN; WILHELM, BRUCE; PHILO, DARYL; MAIDENFORD, TIMOTHY
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 040189/0980 →
Continuity (1)
Related Publication 20180119577A1 · May 3, 2018