Electric meter with interconnection of DER and communications
A watt-hour meter may include one or more electrical junction points that interface a Distributed Energy Resource to an energy-consuming structure and to the electrical distribution grid, while maintaining compliance with interconnection requirements for safety, power quality and automatic disconnect capabilities.
1. A junction meter that houses junction meter components, the junction meter components comprising:
at least one premises meter that measures power production or power consumption of a premises;
at least one electrical interconnection point allowing the connection of a Distributed Energy Resource (DER) to a circuit within the junction meter that provides an electrical path to the premises and the grid;
at least one DER meter that measures power production or power consumption of the connected DER; and
at least one remote controllable relay to disconnect either of the DER or the premises from the grid,
wherein the junction meter houses the junction meter components in a weatherproof containment in the form factor of a watt-hour meter.
2. The junction meter of claim 1 , further comprising
at least one wired or wireless machine-to-machine data communications component that transmits data regarding electrical characteristics gathered from the at least one premises meter, and data gathered from the at least one DER meter.
3. The junction meter of claim 2 , wherein the junction meter is installed on the premises.
4. The junction meter of claim 1 , further comprising:
at least one overcurrent protection device to prevent overcurrent draw through the at least one electrical interconnection points.
5. The junction meter of claim 1 , including:
at least one disconnect device to allow the at least one electrical interconnection point to be electrically isolated from the grid.
6. The junction meter of claim 5 , wherein the at least one disconnect device to allow the at least one electrical interconnection point to be manually electrically isolated from the grid is combined with an overcurrent device.
7. The junction meter of claim 1 , further comprising:
at least one data display screen that shows metering data, operational states, error codes, or other relevant data generated by the premises and DER meters.
8. The junction meter of claim 1 , further comprising:
at least one grid or line side electrical interconnection point.
9. The junction meter of claim 1 , further comprising:
at least one premises or load side electrical interconnection point.
10. The junction meter of claim 1 , further comprising:
at least one electrical surge protection device to prevent power surges from entering the meter from the grid or line side.
11. The junction meter of claim 1 , further comprising:
at least one electrical surge protection device to prevent power surges from entering the meter through the at least one electrical interconnection point.