IP Library › Granted Patent US 10,689,853
Granted Patent B2
US 10,689,853 · App. 15/474,262 · Granted Jun 23, 2020

Post-tension concrete leave out splicing system and method

Inventor: Gordon H. Reigstad (Saint Paul, MN)
Assignee: REIGSTAD & ASSOCIATES, INC.
E04C5/165E04B5/023E04B5/04E04B5/32E04C5/0645E04B2005/176E04B2005/324E04B2103/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,689,853
App. No.
15/474,262
Granted
Jun 23, 2020
Kind
B2
Abstract

Devices, systems, and methods for constructing post-tensioned concrete slabs in a new floor construction that has a reduced gap distance between the slabs. The devices, systems, and methods can improve project construction time by reducing the time delay in accessing the floor underneath the slabs due to safety and/or weather conditions.

Claims (37)

1. A rebar splice assembly, comprising:

a sleeve device including:

a body defining a cavity,

a top opening open to the cavity,

a first side opening open to the cavity,

a second side opening opposite to the first side opening, the second side opening open to the cavity, and

a closed bottom surface that is arranged opposite to the top opening;

a splice device having an elongated body with an internal cavity, the internal cavity being generally cylindrical in shape,

the splice device having an opening at each end of the splice device,

the length of the sleeve device is less than the length of the splice device,

wherein the splice device is partially inside the cavity of the sleeve device through the first side opening of the sleeve device,

wherein the splice device is not fixed directly to the sleeve device such that the splice device is configured to move with respect to the sleeve device during tensioning of concrete material of a concrete floor construction in order to allow for a change in volume of the concrete material due to the tensioning, and

the splice device is connected to a first rebar and a second rebar,

wherein the concrete floor construction includes:

a first post-tensioned concrete floor slab having the first rebar, and

a second post-tensioned concrete floor slab having the second rebar.

2. The rebar splice assembly according to claim 1 , further comprising a cap for closing the top opening of the sleeve device.

3. A rebar splice assembly, comprising:

a splice device connecting two rebars of a concrete floor construction;

the concrete floor construction including:

a first post-tensioned concrete floor slab having a first one of the two rebars, and

a second post-tensioned concrete floor slab having a second one of the two rebars, the splice device including at least one hole for receiving a bolt or a nut; and

a sleeve device for creating an opening at a top surface of the concrete floor construction, the sleeve device including:

a body defining a cavity,

a top opening open to the cavity,

a side opening open to the cavity for receiving the splice device,

another side opening opposite to the side opening so that the first or the second one of the rebars can be contained within a cavity of the splice device, and

a closed bottom surface that is arranged opposite to the top opening,

wherein the splice device is partially inserted within the cavity of the sleeve device through the side opening, and the splice device is not fixed directly to the sleeve device such that the splice device is configured to move with respect to the sleeve device during tensioning of concrete material of the concrete floor construction in order to allow for a change in volume of the concrete material due to the tensioning,

the splice device has an elongated body that defines an internal cavity, the internal cavity having an opening at each end of the splice device, and

the internal cavity defined by the elongated body of the splice device is generally cylindrical in shape.

4. The rebar splice assembly according to claim 3 , further comprising a cap for closing the top opening of the sleeve device.

5. The rebar splice assembly according to claim 3 , wherein the length of the sleeve device is less than the length of the splice device.

6. The rebar splice assembly according to claim 3 , further comprising the bolt or the nut mechanically secured through the hole for connecting to at least a portion of the rebar contained in the cavity.

7. The rebar splice assembly according to claim 3 , wherein the closed bottom surface has a closed curved surface.

8. The rebar splice assembly according to claim 3 , wherein the splice device is slidably moveable with respect to the sleeve device.

9. The rebar splice assembly according to claim 3 , wherein the elongated body of the splice device is generally cylindrical in shape.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 11, 2021
From: REIGSTAD & ASSOCIATES, INC.
To: 3JR, LLC
Reel/Frame 055234/0089 →
Continuity (4)
Division 15231178 · Aug 8, 2016
Continuation In Part 14581720 · Dec 23, 2014
Provisional Application 61920581 · Dec 24, 2013
Related Publication 20170204609A1 · Jul 20, 2017