IP Library Granted Patent US 10,525,587
Granted Patent B2
US 10,525,587 · App. 15/486,228 · Granted Jan 7, 2020

Automated compound retrieval and delivery of lumber

Inventor: Steven L. Aylsworth (Chatfield, MN)
B25J9/026B23Q7/04B25J9/0084B25J15/0019B25J15/0052B25J15/0616B25J19/022B65G59/02B65G59/04B65G59/08B65G61/00B23Q2240/007B27B31/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,525,587
App. No.
15/486,228
Granted
Jan 7, 2020
Kind
B2
Abstract

An automated lumber handling method for transferring various size boards from multiples board storage stations to a common board-receiving area uses a trolley that carries at least two board pickers that can operate independently. The method provides several operating modes. In a first mode, a first board picker retrieves single boards from various stations, while a second board picker is inactive. In a second mode, two board pickers retrieve two individual boards from a single station. In a third mode, one board picker retrieves one size board from a first station, and s second board picker retrieves a different size board from a second station. The two different boards can be released simultaneously at the board-receiving area. In some examples, the lumber at each station is laser scanned to determine the number of boards at each station, and a worker is notified if a station needs to be restocked.

Claims (91)

1. A lumber handling method involving the use of a track, a trolley, a first board picker, a second board picker, a controller, a first station, a second station, and a board-receiving area, the lumber handling method comprising:

the trolley traveling along the track selectively in a forward direction toward the board-receiving area and a rearward direction away from the board-receiving area;

the trolley carrying both the first board picker and the second board picker;

placing a first plurality of boards at the first station, the first plurality of boards includes a first board of a first size and a second board of the first size;

placing a second plurality of boards at the second station, the second plurality of boards includes a third board of a second size, wherein the second size is distinguishable from the first size;

during a first period, the first board picker carrying the first board from the first station toward the board-receiving area while the second board picker carries no board;

during a second period, the first board picker carrying the first board from the first station toward the board-receiving area while the second board picker carries the second board from the first station toward the board-receiving area; and

during a third period, the first board picker carrying the first board from the first station toward the board-receiving area while the second board picker carries the third board from the second station toward the board-receiving area.

2. The lumber handling method of claim 1 , further comprising:

the first board picker applying subatmospheric pressure to the first board during the first period; and

the second board picker applying subatmospheric pressure to the second board during the second period; and

the second board picker applying subatmospheric pressure to the third board during the third period.

3. The lumber handling method of claim 1 , further comprising:

the first board picker screwing a first screw into the first board during the first period; and

the second board picker screwing a second screw into the second board during the second period; and

the second board picker screwing the second screw into the third board during the third period.

4. The lumber handling method of claim 1 , further comprising during the first period, the first board picker carrying the first board over the second station.

5. The lumber handling method of claim 1 , further comprising:

the first board picker picking up the first board from the first station;

the first board picker carrying the first board toward the second station; and

after the first board carries the first board toward the second station, the second board picker picking up the second board.

6. The lumber handling method of claim 1 , further comprising:

the first board picker picking up the first board from the first station;

the first board picker carrying the first board toward the second station;

after the first board picker carries the first board toward the second station, the second board picker picking up the second board from the second station;

the first board picker releasing the first board at the board-receiving area; and

the second board picker releasing the second board at the board-receiving area substantially simultaneously with the first board picker releasing the first board.

7. The lumber handling method of claim 1 , further comprising:

laser scanning the first plurality of boards at the first station, and

laser scanning the second plurality of boards at the second station.

8. The lumber handling method of claim 1 , further comprising:

laser scanning the first plurality of boards at the first station;

the controller computing a first quantity of the first plurality of boards based on laser scanning the first plurality of boards at the first station;

laser scanning the second plurality of boards at the second station; and

the controller computing a second quantity of the second plurality of boards based on laser scanning the second plurality of boards at the second station.

9. The lumber handling method of claim 1 , further comprising:

laser scanning the first plurality of boards at the first station;

the controller computing a first quantity of the first plurality of boards based on laser scanning the first plurality of boards at the first station;

laser scanning the second plurality of boards at the second station;

the controller computing a second quantity of the second plurality of boards based on laser scanning the second plurality of boards at the second station; and

the controller providing an alert signal if at least one of the first quantity and the second quantity is below a predetermined minimum quantity.

10. A lumber handling method involving the use of a track, a trolley, a first board picker, a second board picker, a controller, a first station, a second station, and a board-receiving area, the lumber handling method comprising:

the trolley traveling along the track selectively in a forward direction toward the board-receiving area and a rearward direction away from the board-receiving area;

the trolley carrying both the first board picker and the second board picker;

placing a first plurality of boards at the first station, the first plurality of boards includes a first board of a first size and a second board of the first size;

placing a second plurality of boards at the second station, the second plurality of boards includes a third board of a second size, wherein the second size is distinguishable from the first size;

the first board picker picking up the first board from the first station;

the first board picker carrying the first board toward the second station;

after the first board picker carries the first board toward the second station and while the first board picker is still carrying the first board, the second board picker picking up the second board from the second station;

the first board picker releasing the first board at the board-receiving area; and

the second board picker releasing the second board at the board-receiving area.

11. The lumber handling method of claim 10 , wherein a first time span extends between when the first board picker picks up the first board and when the second board picker picks up the second board, and a second time span extends between when the first board picker releases the first board at the board-receiving area and when the second board picker releases the second board at the board-receiving area, and the first time span is greater than the second time span.

12. The lumber handling method of claim 10 , wherein the first board picker releasing the first board at the board-receiving area and the second board picker releasing the second board at the board-receiving area occurs substantially simultaneously.

13. The lumber handling method of claim 10 , further comprising:

the first board picker screwing a first screw into the first board; and

the second board picker screwing a second screw into the second board.

14. The lumber handling method of claim 10 , further comprising the first board picker carrying the first board over the second station.

15. The lumber handling method of claim 10 , further comprising:

laser scanning the first plurality of boards at the first station, and

laser scanning the second plurality of boards at the second station.

16. The lumber handling method of claim 10 , further comprising:

laser scanning the first plurality of boards at the first station;

the controller computing a first quantity of the first plurality of boards based on laser scanning the first plurality of boards at the first station;

laser scanning the second plurality of boards at the second station; and

the controller computing a second quantity of the second plurality of boards based on laser scanning the second plurality of boards at the second station.

17. The lumber handling method of claim 10 , further comprising:

laser scanning the first plurality of boards at the first station;

the controller computing a first quantity of the first plurality of boards based on laser scanning the first plurality of boards at the first station;

laser scanning the second plurality of boards at the second station;

the controller computing a second quantity of the second plurality of boards based on laser scanning the second plurality of boards at the second station; and

the controller providing an alert signal if at least one of the first quantity and the second quantity is below a predetermined minimum quantity.

18. A lumber handling method involving the use of a track, a trolley, a first board picker, a second board picker, a controller, a first station, a second station, and a board-receiving area, the lumber handling method comprising:

the trolley traveling along the track selectively in a forward direction toward the board-receiving area and a rearward direction away from the board-receiving area;

the trolley carrying both the first board picker and the second board picker;

placing a first plurality of boards at the first station;

placing a second plurality of boards at the second station;

the first board picker picking a first chosen board selectively from the first station and the second station;

the second board picker picking a second chosen board selectively from the first station and the second station;

delivering both the first chosen board and the second chosen board to the board-receiving area;

laser scanning the first plurality of boards at the first station;

the controller computing a first quantity of the first plurality of boards based on laser scanning the first plurality of boards at the first station;

laser scanning the second plurality of boards at the second station; and

the controller computing a second quantity of the second plurality of boards based on laser scanning the second plurality of boards at the second station.

19. The lumber handling method of claim 18 , further comprising the controller providing an alert signal if at least one of the first quantity and the second quantity is below a predetermined minimum quantity.

20. The lumber handling method of claim 18 , further comprising:

the first board picker releasing the first chosen board at the board-receiving area; and

the second board picker releasing the second chosen board at the board-receiving area, wherein a first time span extends between when the first board picker picks up the first chosen board and when the second board picker picks up the second chosen board, and a second time span extends between when the first board picker releases the first chosen board at the board-receiving area and when the second board picker releases the second chosen board at the board-receiving area, and the first time span is greater than the second time span.

21. The lumber handling method of claim 18 , further comprising:

the first board picker releasing the first chosen board at the board-receiving area; and

the second board picker releasing the second chosen board at the board-receiving area, wherein the first board picker releasing the first chosen board at the board-receiving area and the second board picker releasing the second chosen board at the board-receiving area occurs substantially simultaneously.

22. The lumber handling method of claim 18 , further comprising the first board picker carrying the first chosen board over the second station.

Assignments (3)
SECURITY INTEREST Recorded Feb 28, 2022
From: AYLSWORTH, STEVEN
To: ACER, INC.
Reel/Frame 059112/0543 →
CORRECTIVE ASSIGNMENT TO CORRECT THE TO CORRECT SUPPORTING DOCUMENTS PREVIOUSLY RECORDED ON REEL 053448 FRAME 0101. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Aug 14, 2020
From: AYLSWORTH, STEVEN L
To: ACER INC.
Reel/Frame 054171/0388 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 10, 2020
From: AYLSWORTH, STEVEN L
To: ACER INC.
Reel/Frame 053448/0101 →
Continuity (7)
Continuation In Part 15350041 · Nov 2, 2016
Continuation In Part 15331824 · Oct 22, 2016
Continuation In Part 14577779 · Dec 19, 2014
Division 13136922 · Aug 15, 2011
Provisional Application 61402654 · Sep 2, 2010
Provisional Application 62324151 · Apr 18, 2016
Related Publication 20170217022A1 · Aug 3, 2017