IP Library Granted Patent US 10,253,490
Granted Patent B2
US 10,253,490 · App. 15/497,341 · Granted Apr 9, 2019

Corrugated stormwater chamber having sub-corrugations

Inventors: David J. Mailhot (Coventry, CT); Nimish Gandhi (Wethersfield, CT); Timothy J. McGrath (Arlington, MA)
Assignee: STORMTECH LLC
E03F1/003E02B11/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,253,490
App. No.
15/497,341
Granted
Apr 9, 2019
Kind
B2
Abstract

A plastic arch-shape cross section corrugated stormwater chamber has a multiplicity of crest corrugations and valley corrugations which run transverse to its length. Sub-corrugations run along part or all of the arch-curve lengths of either crest corrugations or valley corrugations, or along both of them. A sub-corrugations are smaller in dimension than an associated crest corrugation or valley corrugation. Sub-corrugations may taper in width and depth and may taper to nothingness. A compound convex shape end cap, useful for closing off the ends of stormwater chambers, has substantially vertical corrugations with analogous sub-corrugations.

Claims (33)

1. A chamber for drainage, comprising:

opposing side bases;

sidewalls extending from the opposing side bases;

a plurality of crest corrugations and a plurality of valley corrugations positioned along a length of the chamber; and

a plurality of valley sub-corrugations, wherein at least one valley sub-corrugation runs downwardly along a valley corrugation toward the opposing side bases, wherein the at least one valley sub-corrugation includes terminal ends at an elevation above the opposing side bases, wherein a height of the at least one valley sub-corrugation decreases towards each of the terminal ends of the at least one valley sub-corrugation.

2. The chamber of claim 1 , wherein the at least one valley sub-corrugation runs along a portion of the valley corrugation.

3. The chamber of claim 1 , wherein a height of the at least one valley sub-corrugation is less than a depth of the valley corrugation along which the at least one valley sub-corrugation runs.

4. The chamber of claim 1 , wherein a width of the at least one valley sub-corrugation decreases towards each of the terminal ends of the at least one valley sub-corrugation.

5. The chamber of claim 1 , wherein a maximum width of the at least one valley sub-corrugation is no more than one-third of a width of the valley corrugation along which the at least one valley sub-corrugation runs.

6. The chamber of claim 1 , wherein the valley corrugations increase in width with elevation from the opposing side bases.

7. The chamber of claim 1 , the crest corrugations decrease in width with elevation from the opposing side bases.

8. A chamber for drainage, comprising:

opposing side bases;

sidewalls extending from the opposing side bases;

a plurality of crest corrugations and a plurality of valley corrugations positioned along a length of the chamber, wherein each valley corrugation includes a first terminal end and a second terminal end; and

a plurality of valley sub-corrugations, wherein at least one valley sub-corrugation runs downwardly along a valley corrugation toward the opposing side bases, wherein the at least one valley sub-corrugation includes a first terminal end and a second terminal end, wherein the first terminal end of the at least one valley sub-corrugation is positioned at an elevation above the first terminal end of valley corrugation, wherein the second terminal end of the at least one valley sub-corrugation is positioned at an elevation above the second terminal end of valley corrugation, wherein a height of the at least one valley sub-corrugation decreases towards each of the terminal ends of the at least one valley sub-corrugation.

9. The chamber of claim 8 , wherein the at least one valley sub-corrugation runs along a portion of the valley corrugation.

10. The chamber of claim 8 , wherein a height of the at least one valley sub-corrugation is less than a depth of the valley corrugation along which the at least one valley sub-corrugation runs.

11. The chamber of claim 8 , wherein a width of the at least one valley sub-corrugation decreases towards each of the first terminal end and the second terminal end of the at least one valley sub-corrugation.

12. The chamber of claim 8 , wherein a maximum width of the at least one valley sub-corrugation is no more than one-third of a width of the valley corrugation along which the at least one valley sub-corrugation runs.

13. The chamber of claim 8 , wherein the valley corrugations increase in width with elevation from the opposing side bases.

14. The chamber of claim 8 , the crest corrugations decrease in width with elevation from the opposing side bases.

15. A chamber for drainage, comprising:

a first side base;

a second side base;

sidewalls extending from the first and second side bases;

a plurality of crest corrugations and a plurality of valley corrugations positioned along a length of the chamber, wherein each valley corrugation includes a first end at the first side base and a second end at the second side base; and

a plurality of valley sub-corrugations, wherein at least one valley sub-corrugation runs downwardly along a portion of a valley corrugation toward the first and second side bases, wherein the at least one valley sub-corrugation includes a first terminal end between the first end and the second end of the valley corrugation and includes a second terminal end between the first end and the second end of the valley corrugation, wherein a height of the at least one valley sub-corrugation decreases towards each of the first terminal end and the second terminal, end of the at least one valley sub-corrugation.

16. The chamber of claim 15 , wherein a height of the at least one valley sub-corrugation is less than a depth of the valley corrugation along which the at least one valley sub-corrugation runs.

17. The chamber of claim 15 , wherein a width of the at least one valley sub-corrugation decreases towards each of the first terminal end and the second terminal end of the at least one valley sub-corrugation.

18. The chamber of claim 15 , wherein a maximum width of the at least one valley sub-corrugation is no more than one-third of a width of the valley corrugation along which the at least one valley sub-corrugation runs.

19. The chamber of claim 15 , wherein the valley corrugations increase in width with elevation from the first and second side bases.

20. The chamber of claim 15 , the crest corrugations decrease in width with elevation from the first and second side bases.

Assignments (1)
SECURITY INTEREST Recorded Dec 13, 2019
From: STORMTECH LLC
To: BARCLAYS BANK PLC, AS ADMINISTRATIVE AGENT
Reel/Frame 051282/0496 →
Continuity (5)
Continuation 15017509 · Feb 5, 2016
Continuation 14165503 · Jan 27, 2014
Continuation 12802483 · Jun 7, 2010
Provisional Application 61217905 · Jun 5, 2009
Related Publication 20180010325A1 · Jan 11, 2018