IP Library Granted Patent US 10,190,282
Granted Patent B2
US 10,190,282 · App. 15/563,418 · Granted Jan 29, 2019

Pile driving assembly and a follower

Inventors: Henricus Gerardus Andreas Van Vessem (Vught, NL); Jakob Van Dijk (The Hague, NL)
Assignee: IHC HOLLAND IE B.V.
E02D13/10E02D7/02E02D7/28E02D7/26
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,190,282
App. No.
15/563,418
Granted
Jan 29, 2019
Kind
B2
Abstract

A pile driving assembly for installing a pile in an underwater bottom comprises a tubular pile and a hammer for driving the pile into an underwater bottom. The assembly is provided with a soil remover for removing soil inside the pile. The soil remover is located below the hammer and remote from a lower end of the pile in assembled operating condition.

Claims (14)

1. A pile driving assembly for installing a pile in an underwater bottom, comprising, a hammer configured to drive the pile into the underwater bottom, a soil remover configured to remove soil from inside the pile, wherein the soil remover is located below the hammer and remote from a lower end of the pile in an assembled operating condition, a follower having a tubular transmission portion configured to transmit hammering energy from the hammer to the pile, wherein the follower supports the weight of the soil remover in the pile, and wherein the soil remover is displaceable with respect to the transmission portion in at least a longitudinal direction of the pile.

2. The pile driving assembly according to claim 1 , wherein the soil remover is located at an upper end portion of the pile.

3. The pile driving assembly according to claim 2 , wherein the upper end portion of the pile has a length of less than 50% of the length of the pile.

4. The pile driving assembly according to claim 2 , wherein the soil remover has a centring element fitting to the pile.

5. The pile driving assembly according to claim 2 , wherein the upper end portion of the pile has a length of less than 25% of the length of the pile.

6. The pile driving assembly according to claim 1 , wherein the soil remover comprises a fluid jet.

7. The pile driving assembly according to claim 1 , wherein the assembly further comprises a soil discharger configured to discharge removed soil from the inner side of the pile to the outer side thereof.

8. The pile driving assembly according to claim 7 , wherein the soil discharger comprises a through-hole in the follower through which removed soil is discharged.

9. The pile driving assembly according to claim 1 , wherein the follower slidably fits into the pile and the fluid jet is located such that the fluid is pressed between an outer circumference of the follower and an inner wall of the pile.

10. A follower for transmitting hammering energy from an anvil of a pile driver to a tubular pile to be inserted into a bottom, comprising: a tubular transmission portion removably coupled to the tubular pile, the tubular transmission portion including an anvil contact surface configured to receive hammering energy from the anvils and a soil remover configured to remove sediment inside the pile, wherein the tubular transmission portion supports the weight of the soil remover from above and the soil remover is displaceable with respect to the transmission portion in at least a longitudinal direction thereof, and wherein soil remover is located below the anvil contact surface.

11. The follower according to claim 10 , wherein the soil remover comprises a centring element to be fit to a pile for positioning the soil remover to the pile.

12. The follower according to claim 11 , wherein the centring element is slidable with respect to the transmission portion in longitudinal direction thereof.

13. The follower according to claim 12 , wherein the centring element has such a circumference that it slidably fits in a tubular pile.

14. The follower of claim 13 wherein the centring includes a bush.

Assignments (3)
NUNC PRO TUNC ASSIGNMENT Recorded Mar 9, 2023
From: IHC HOLLAND IE B.V.
To: IHC IQIP HOLDING B.V.
Reel/Frame 062936/0871 →
CHANGE OF NAME Recorded Mar 9, 2023
From: IHC IQIP HOLDING B.V.
To: IQIP HOLDING B.V.
Reel/Frame 063024/0990 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 6, 2017
From: VAN VESSEM, HENRICUS GERARDUS ANDREAS; VAN DIJK, JAKOB
To: IHC HOLLAND IE B.V.
Reel/Frame 044040/0238 →
Priority Claims (1)
NL 2014578 · Apr 2, 2015 · national
Continuity (1)
Related Publication 20180087233A1 · Mar 29, 2018
Cited By (1)
US 12,698,611