IP Library › Patent Application 15566514
Patent Application
App. No. 15/566,514

METHOD AND SYSTEM FOR OPERATING A PLURALITY OF PHOTOVOLTAIC (PV) GENERATING FACILITIES CONNECTED TO AN ELECTRICAL POWER GRID NETWORK

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
15/566,514
Abstract

A method and system for operating a plurality of photovoltaic (PV) generating facilities connected to an electrical power grid network. The method comprises the steps of obtaining data about each of the plurality of PV generating facilities; filtering the obtained data to establish one or more selected PV generating facilities out of the plurality of PV generating facilities; and executing an operation routine for said one or more selected PV generating facilities for execution.

Claims (34)

1 . A method for operating a plurality of photovoltaic (PV) generating facilities connected to an electrical power grid network, the electrical power grid network further comprising a plurality of dispatchable generators and a power system operator (PSO) providing a dispatch routine for the dispatchable generators, the method comprising the steps of:

obtaining data about each of the plurality of PV generating facilities, comprising receiving information from the PV generating facilities and receiving information from the PSO;

filtering the obtained data including the information from the PSO to establish one or more selected PV generating facilities out of the plurality of PV generating facilities; and

executing an operation routine for said one or more selected PV generating facilities, wherein the operation routine includes limiting supply of energy from the selected PV generating facilities to the electrical power grid network based on the information received from the PSO.

2 . The method as claimed in claim 1 , wherein the information from the PV generating facilities comprises information about an output of the plurality of PV generating facilities or of a subset thereof.

3 . The method as claimed in claim 1 , wherein limiting supply of energy from the selected PV generating facilities comprises diverting power to an auxiliary or dump back up system associated with the one or more selected PV generating facilities.

4 . The method as claimed in claim 1 , wherein the operation routine is uploaded to the respective hardware modules comprised in the one or more selected generating facilities for implementation locally at the one or more selected generating facilities, or wherein the operation routine is uploaded to the respective hardware modules comprised in the one or more selected generating facilities for implementation locally through a schedule implemented to a clock comprised in the respective hardware modules.

5 . (canceled)

6 . The method as claimed in claim 1 , comprising selecting an isolation routine as the operation routine which, when executed, isolates one or more PV generators at each of the one or more selected PV generating facilities from a connection point to the building load or AC electrical power grid network.

7 . The method as claimed in claim 1 , comprising selecting a synchronization routine as the operation routine which, when executed, sets a reference waveform for synchronization of AC output from respective AC inverters coupled to one or more PV generators at each of the one or more selected PV generating facilities.

8 . The method as claimed in claim 1 , comprising selecting a reactive power control routine as the operation routine which, when executed, sets a reference waveform for reactive power control of AC output from respective AC inverters coupled to one or more PV generators at each of the one or more of selected PV generating facilities.

9 . The method as claimed in claim 1 , comprising selecting a maintenance routine as the operation routine which, when executed, performs a maintenance operation on one or more PV generators at each of one or more selected PV generating facilities.

10 . (canceled)

11 . The method as claimed in claim 1 , comprising diverting power to an auxiliary or dump back up system associated with the one or more selected PV generating facilities.

12 . A system for operating a plurality of photovoltaic (PV) generating facilities connected to an electrical power grid network, the electrical power grid network further comprising a plurality of dispatchable generators and a power system operator (PSO) providing a dispatch routine for the dispatchable generators, the method comprising:

means for obtaining data about each of the plurality of PV generating facilities, comprising receiving information from the PV generating facilities and receiving information from the PSO;

means for filtering the obtained data including the information from the PSO to establish one or more selected PV generating facilities out of the plurality of PV generating facilities; and

means for executing an operation routine for said one or more selected PV generating facilities, wherein the operation routine includes limiting supply of energy from the selected PV generating facilities to the electrical power grid network based on the information received from the PSO.

13 . The system as claimed in claim 12 , wherein the information from the PV generating facilities comprises information about an output of the plurality of PV generating facilities or of a subset thereof.

14 . The system as claimed in claim 12 , wherein limiting supply of energy from the selected PV generating facilities comprises diverting power to an auxiliary or dump back up system associated with the one or more selected PV generating facilities.

15 . The system as claimed in claim 12 , wherein the means for executing is configured to upload the operation routine to the respective hardware modules of the system comprised in the one or more selected generating facilities for implementation locally at the one or more selected generating facilities, or wherein the means for executing is configured to upload the operation routine to the respective hardware modules of the system comprised in the one or more selected generating facilities for implementation locally through a schedule implemented to a clock comprised in the hardware module.

16 . (canceled)

17 . (canceled)

18 . The system as claimed in claim 12 , wherein the hardware module further comprises a data storage space for storing at least part of the operation routine and/or wherein the hardware module further comprises a data acquisition unit for gathering data locally at the PV generating facility.

19 . (canceled)

20 . The system as claimed in claim 12 , comprising means for selecting an isolation routine as the operation routine which, when executed, isolates one or more PV generators at each of the one or more selected PV generating facilities from the AC electrical power grid network.

21 . The system as claimed in claim 12 , comprising means for selecting a synchronization routine as the operation routine which, when executed, sets a reference waveform for synchronization of AC output from respective AC inverters coupled to one or more PV generators at each of the one or more selected PV generating facilities.

22 . The system as claimed in claim 12 , comprising means for selecting a reactive power control as the operation routine which, when executed, sets a reference waveform for reactive power control of AC output from respective AC inverters coupled to one or more PV generators at each of the one or more of selected PV generating facilities.

23 . The system as claimed in claim 12 , comprising means for selecting a maintenance routine as the operation routine which, when executed, performs a maintenance operation on one or more PV generators at each of one or more selected PV generating facilities.

24 . (canceled)

25 . The system as claimed in claim 12 , comprising means for storing the data obtained by the means for obtaining data about the aggregate PV generating facility and/or for storing a plurality of operating routines, and means for selecting the operating routine for uploading by the means for uploading.

26 . (canceled)

27 . (canceled)

28 . The system as claimed in claim 12 , comprising means for diverting power to an auxiliary or dump back up system associated with the one or more selected PV generating facilities.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 22, 2024
From: KUMAR, VIKRAM
To: RAMBUTAN PTE LTD
Reel/Frame 066527/0011 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 22, 2024
From: RAMBUTAN PTE LTD
To: SUN ELECTRIC DIGITAL STREAM INC.
Reel/Frame 066645/0541 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 15, 2020
From: SUN ELECTRIC DIGITAL STREAM LTD.
To: VIKRAM KUMAR
Reel/Frame 053773/0823 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 27, 2018
From: SUN ELECTRIC PTE LTD
To: SUN ELECTRIC DIGITAL STREAM LTD.
Reel/Frame 045651/0253 →