IP Library › Granted Patent US 9,982,398
Granted Patent B2
US 9,982,398 · App. 15/618,876 · Granted May 29, 2018

Hopper insert for an asphalt paving machine

Inventors: Laikram Narsingh (Chambersburg, PA); James E. Meridieth (South Gallatin, TN); Jay Scott Johnson (Orlando, FL)
Assignee: Wirtgen America, Inc.
E01C19/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,982,398
App. No.
15/618,876
Granted
May 29, 2018
Kind
B2
Abstract

A hopper insert for an asphalt paving machine. The hopper insert provides for passive mixing of asphalt material, and also provides a dual capacity loading option. Two upper baffles extend across an open upper end of the hopper insert. A grate extends between the upper baffles. Asphalt material is received on top of the grate between the upper baffles.

Claims (29)

1. A method of passive mixing of asphalt material with a hopper insert for an asphalt paving machine, the hopper insert including a larger upper open end and a smaller lower open end so that the hopper insert is funnel shaped, the method comprising:

(a) receiving the asphalt material on top of a grate located nearer to the upper end than to the lower end of the hopper insert;

(b) reducing an average clump size of the asphalt material as at least a portion of the asphalt material passes through the grate; and

(c) discharging the asphalt material out the smaller lower open end of the hopper insert onto a conveyor of the asphalt paving machine;

wherein step (a) further comprises piling the asphalt material on the grate to a depth of at least 12 inches to increase a weight forcing the asphalt material through the grate; and

wherein step (a) further comprises retaining the piled asphalt material on the grate with at least two opposed lateral retainer walls on opposite sides of the grate, the retainer walls being laterally spaced from a peripheral wall of the hopper insert.

2. The method of claim 1 , further comprising:

laterally spreading the asphalt material to different widths along a length of the grate via a variable lateral spacing between the retainer walls.

3. The method of claim 1 , further comprising:

reducing bridging of the asphalt material between the retainer walls via a downward outward flare of the retainer walls relative to each other.

4. A method of passive mixing of asphalt material with a hopper insert for an asphalt paving machine, the hopper insert including a larger upper open end and a smaller lower open end so that the hopper insert is funnel shaped, the method comprising:

(a) receiving the asphalt material on top of a grate located nearer to the upper end than to the lower end of the hopper insert;

(b) reducing an average clump size of the asphalt material as at least a portion of the asphalt material passes through the grate; and

(c) discharging the asphalt material out the smaller lower open end of the hopper insert onto a conveyor of the asphalt paving machine;

wherein step (a) further comprises retaining at least a portion of the asphalt material on the grate between at least two opposed lateral retainer walls on opposite sides of the grate, the retainer walls being laterally spaced from a peripheral wall of the hopper insert; and

further comprising:

filling the hopper insert to a smaller one of two optional fill levels by depositing the asphalt material only between the two retainer walls without allowing the asphalt material to overflow the retainer walls.

5. A method of passive mixing of asphalt material with a hopper insert for an asphalt paving machine, the hopper insert including a larger upper open end and a smaller lower open end so that the hopper insert is funnel shaped, the method comprising:

(a) receiving the asphalt material on top of a grate located nearer to the upper end than to the lower end of the hopper insert;

(b) reducing an average clump size of the asphalt material as at least a portion of the asphalt material passes through the grate; and

(c) discharging the asphalt material out the smaller lower open end of the hopper insert onto a conveyor of the asphalt paving machine;

wherein step (a) further comprises retaining at least a portion of the asphalt material on the grate between at least two opposed lateral retainer walls on opposite sides of the grate, the retainer walls being laterally spaced from a peripheral wall of the hopper insert; and

further comprising:

filling the hopper insert to a larger one of two optional fill levels by depositing the asphalt material between the two retainer walls and allowing the asphalt material to overflow the retainer walls so that the deposited asphalt material is also received within a lateral volume between each of the retainer walls and the peripheral wall of the hopper insert.

6. A method of passive mixing of asphalt material with a hopper insert for an asphalt paving machine, the hopper insert including a larger upper open end and a smaller lower open end so that the hopper insert is funnel shaped, the method comprising:

receiving the asphalt material on top of a grate located nearer to the upper end than to the lower end of the hopper insert;

reducing an average clump size of the asphalt material as at least a portion of the asphalt material passes through the grate;

bypassing at least a bypass portion of the asphalt material around the grate as the asphalt material flows downward from the larger upper open end to the smaller lower open end; and

discharging the asphalt material out the smaller lower open end of the hopper insert onto a conveyor of the asphalt paving machine.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 12, 2017
From: NARSINGH, LAIKRAM; MERIDIETH, JAMES E.; JOHNSON, JAY SCOTT
To: WIRTGEN AMERICA, INC.
Reel/Frame 042672/0046 →
Continuity (2)
Division 14746558 · Jun 22, 2015
Related Publication 20170275830A1 · Sep 28, 2017