IP Library Granted Patent US 10,053,820
Granted Patent B2
US 10,053,820 · App. 15/622,604 · Granted Aug 21, 2018

Binder composition for improved tack coat and stress absorbing membrane interlayer application for road construction

Inventors: Anthony J. Kriech (Indianapolis, IN); Marvin Exline (Terre Haute, IN); James Joseph Cunningham (Greensburg, PA); Andreas Redick Horton (Plainfield, IN)
Assignee: Heritage Research Group
E01C7/325C08L95/00E01C7/32E01C19/12C08L2555/50C08L2555/54C08L2555/60C08L2555/80
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,053,820
App. No.
15/622,604
Granted
Aug 21, 2018
Kind
B2
Abstract

A binder composition for asphalt pavements that includes: an asphalt binder; an elastomeric polymer; a wax modifier; and optionally at least one of: i) fumed silica or fumed alumina; and ii) a saponified fatty acid and a resin acid gelling compound. The composition is applied as a tack coat and/or a stress absorbing membrane interlayer and is non-tracking.

Claims (31)

1. A non-tracking tack coat or stress absorbing membrane interlayer formed on pavement surface which non-tracking tack coat or stress absorbing membrane interlayer is applied across the entire width of the pavement surface as a binder composition that comprises:

an asphalt binder;

an elastomeric polymer,

a wax modifier; and

at least one of:

i) fumed silica or fumed alumina; and

ii) a saponified fatty acid and a resin acid gelling compound,

wherein the asphalt binder comprises 85 to 97 wt. % of the binder composition.

2. A non-tracking tack coat or stress absorbing membrane interlayer according to claim 1 , wherein the binder composition comprises fumed silica or fumed alumina which imparts a non-tacky character to the binder composition.

3. A non-tracking tack coat or stress absorbing membrane interlayer according to claim 1 , wherein the binder composition is applied on the pavement surface at an application rate of 0.15 to 0.6 gallon per square yard.

4. A non-tracking tack coat or stress absorbing membrane interlayer according to claim 1 , wherein the binder composition is applied on the pavement surface at an application rate of 0.10 to 0.15 gallon per square yard.

5. A non-tracking tack coat or stress absorbing membrane interlayer according to claim 1 , wherein the pavement surface comprises one of asphalt concrete, Portland cement concrete, milled asphalt concrete or Portland cement concrete or brick or chip seal surface.

6. A non-tracking tack coat or stress absorbing membrane interlayer according to claim 1 having an asphalt pavement layer formed thereon.

7. A method of installing an asphalt pavement which comprises:

providing a surface to be paved,

applying a non-tracking layer of a binder composition across the entire width of the surface to be paved, which binder composition comprises:

an asphalt binder;

an elastomeric polymer; and

a wax modifier; and

at least one of:

i) fumed silica or fumed alumina; and

ii) a saponified fatty acid and a resin acid gelling compound,

wherein the asphalt binder comprises 85 to 97 wt. % of the binder composition, and

applying a hot-mix asphalt layer over the binder layer to form an asphalt pavement.

8. The method of installing an asphalt pavement according to claim 7 , wherein the binder composition is applied as a tack coat.

9. The method of installing an asphalt pavement according to claim 8 , wherein the binder composition is applied on the surface at an application rate of 0.10 to 0.15 gallon per square yard.

10. The method of installing an asphalt pavement according to claim 7 , wherein the binder composition is applied as a stress absorbing membrane interlayer.

11. The method of installing an asphalt pavement according to claim 7 , wherein the binder composition is applied on the surface at an application rate of 0.15 to 0.6 gallon per square yard.

12. The method of installing an asphalt pavement according to claim 7 , wherein the surface comprises one of asphalt concrete, Portland cement concrete, milled asphalt concrete or Portland cement concrete or brick or chip seal surface.

13. The method of installing an asphalt pavement according to claim 7 , wherein the hot-mix asphalt layer is applied over the binder layer without an intermediate layer.

14. The method of installing an asphalt pavement according to claim 7 , wherein the binder composition comprises fumed silica or fumed alumina which imparts a non-tacky characteristic to the binder composition.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 23, 2021
From: HERITAGE RESEARCH GROUP
To: HERITAGE RESEARCH GROUP, LLC
Reel/Frame 057264/0328 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 30, 2017
From: KRIECH, ANTHONY J.; EXLINE, MARVIN K.; CUNNINGHAM, JAMES JOSEPH; HORTON, ANDREAS REDICK
To: HERITAGE RESEARCH GROUP
Reel/Frame 042873/0857 →
Continuity (2)
Provisional Application 62349875 · Jun 14, 2016
Related Publication 20170356136A1 · Dec 14, 2017