IP Library Granted Patent US 10,704,369
Granted Patent B2
US 10,704,369 · App. 15/630,305 · Granted Jul 7, 2020

Simultaneous injection and fracturing interference testing

Inventors: Mohamed Larbi Zeghlache (Al-Khobar, SA); Mark Proett (Missouri City, TX)
Assignee: Saudi Arabian Oil Company
E21B43/162E21B43/16E21B43/26E21B43/30E21B47/06E21B49/006E21B49/008E21B49/087E21B43/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,704,369
App. No.
15/630,305
Granted
Jul 7, 2020
Kind
B2
Abstract

Fluids are pumped into the wellbore by pulsing the fluids at a variable, positive pressure relative to the geologic formation until a first pressure threshold in the first fracture zone is satisfied. The pumping results in a first pressure profile in the first fracture zone representing pressures in the first fracture zone over time responsive to the pumping, and a second pressure profile in the second zone representing pressures in the second zone over time responsive to the pumping. In response to determining that the first pressure threshold is satisfied, the fluids are ceased to pump into the wellbore for a duration of time. After the duration of time, the fluids are re-pumped into the wellbore by pulsing the fluids at the variable, positive pressure relative to the geologic formation until a second pressure threshold in the first fracture zone in the first fracture zone is satisfied.

Claims (10)

1. A method comprising:

performing a vertical interference test within a wellbore with a wellbore tool inserted into the wellbore during a trip into the wellbore, wherein the vertical interference test comprises:

measuring a first downhole property with respect to time by a first sensor package attached to the wellbore tool, the first sensor package positioned between an upper packer and a lower packer, each of the packers being attached to the wellbore tool; and

measuring a second downhole property with respect to time by a second sensor package attached to the wellbore tool, the second sensor package located uphole or downhole of both the upper packer and the lower packer;

within the same trip, performing an injection fall-off test within the wellbore; and

determining a set of geo-mechanical properties based on a set of results from both the vertical interference test and the injection fall-off test.

2. The method of claim 1 , wherein performing a vertical interference test and performing an injection fall-off test occur simultaneously.

3. The method of claim 1 , wherein performing a vertical interference test comprises pumping a fluid between the upper packer and the lower packer, the fluid being at a greater pressure than a formation pressure within the wellbore, wherein the formation pressure is a required threshold pressure for fluid to flow into the formation from the wellbore.

4. The method of claim 1 , wherein an injection fall-off test comprises pumping a fluid at a sufficient pressure to start fracturing a formation.

5. The method of claim 1 , wherein the determined geo-mechanical properties comprise fracture geometry.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 27, 2018
From: ZEGHLACHE, MOHAMED LARBI; PROETT, MARK
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 046712/0136 →
Continuity (1)
Related Publication 20180371886A1 · Dec 27, 2018
Cited By (3)
US 12,345,154 US 12,486,762 US 12,644,373