IP Library Granted Patent US 10,605,411
Granted Patent B2
US 10,605,411 · App. 15/652,522 · Granted Mar 31, 2020

Methods for reducing transmix production on petroleum pipelines

Inventors: John Colin Robbins (Houston, TX); Larry D. Mattingly (Houston, TX); Gary S. Wawak (Houston, TX)
Assignee: Texon LP
F17D3/05F16K37/0091F17D1/08F17D3/10G05D7/0635F16K31/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,605,411
App. No.
15/652,522
Granted
Mar 31, 2020
Kind
B2
Abstract

Automated methods and systems for diverting transmix from a petroleum pipeline are provided to reduce the overall production of transmix on the pipeline, based on pre-defined programmed cut-points associated with the various subtypes of hydrocarbon carried on the pipeline.

Claims (33)

1. An automated method for reducing transmix production on a pipeline comprising:

a) providing a flow of hydrocarbon in a transmission pipe comprising first and second hydrocarbon subtypes in sequence separated by transmix;

b) providing a transmix pipe in fluid communication with the transmission pipe separated from the transmission pipe by a transmix diverter under the control of a central processing unit;

c) repeatedly analyzing the flow for one or more physical property measurements;

d) comparing, in the central processing unit, one of the physical property measurements to a first subtype cut-point, and diverting the flow to a transmix pipe when the physical property measurement reaches the first subtype cut-point; and

e) resuming the flow through the transmission pipe when one of the physical property measurements reaches a second subtype cut-point.

2. The method of claim 1 , further comprising:

a) providing a second cut-point for the first subtype for a different physical property than the first cut-point;

b) providing a second cut-point for the second subtype for a different physical property than the first cut-point;

c) diverting the flow to a transmix pipe when the flow reaches the first or second cut-point of the first subtype; and

d) resuming the flow through the transmission pipe when the flow reaches the first and second cut-points of the second subtype.

3. The method of claim 1 , wherein the flow of hydrocarbon further comprises a third subtype in sequence, further comprising:

a) providing a first cut-point for the third subtype;

b) analyzing the flow for physical property measurements of the first cut-point of the second subtype and the first cut-point of the third subtype;

c) diverting the flow to the transmix pipe when a physical property measurement reaches the first cut-point of the second subtype; and

d) resuming the flow through the transmission pipe when the measurements reach the third subtype first cut-point.

4. The method of claim 1 wherein the flow comprises three or more hydrocarbon subtypes selected from conventional gasoline, reformulated gasoline, diesel fuel, ultra-low sulfur diesel, biodiesel fuel, aviation turbine fuel, heating oil, kerosene, reformulated blendstock for oxygenate blending, premium blendstock for oxygenate blending, conventional blendstock for oxygenate blending, subgrade gasoline, diluent, propane, pentane and butane.

5. The method of claim 1 wherein the first subtype is a high sulfur subtype and the second subtype is a low sulfur subtype, and the second subtype first cut-point comprises a sulfur content value.

6. The method of claim 5 , wherein the first subtype comprises aviation turbine fuel and the second subtype comprises diesel fuel.

7. The method of claim 1 wherein the first subtype is a low sulfur subtype and the second subtype is a high sulfur subtype, and the first subtype first cut-point is a sulfur content value.

8. The method of claim 7 wherein the first subtype comprises diesel fuel and the second subtype comprises aviation turbine fuel.

9. The method of claim 1 wherein the cut-points are physical property values selected from sulfur content, specific gravity, haze and flashpoint.

10. The method of claim 1 wherein:

a) physical properties are measured for aviation turbine fuels according to ASTM D1655-15d in effect on Jun. 1, 2016;

b) physical properties are measured for diesel fuels according to ASTM D975-15c in effect on Jun. 1, 2016.

11. The method of claim 1 wherein the flow is analyzed for the first cut-point of the first subtype at a frequency greater than once every 30 seconds.

12. The method of claim 1 wherein the flow of hydrocarbon is analyzed by:

a) withdrawing a sample of the flow of hydrocarbon from the transmission pipe;

b) transmitting the sample to an analyzing unit; and

c) either returning the sample to the transmission pipe, or transmitting the sample to a storage unit.

13. The method of claim 1 , wherein reaching a cut-point occurs when a physical property corresponding to the cut-point is greater than or equal to the cut-point when the cut-point defines a ceiling.

14. The method of claim 1 , wherein reaching a cut-point occurs when a physical property corresponding to the cut-point is less than or equal to the cut-point when the cut-point defines a floor.

15. The method of claim 1 , wherein reaching a cut-point occurs when two or more consecutive analyses of the flow yield a physical property measurement greater than or equal to the cut-point when the cut-point defines a ceiling, and a physical property measurement less than or equal to the cut-point when the cut-point defines a floor.

Assignments (8)
SECURITY INTEREST Recorded Aug 6, 2025
From: TEXON MIDSTREAM, LLC
To: COBANK, ACB
Reel/Frame 071953/0342 →
SUPPLEMENT NO. 1 TO PATENT SECURITY AGREEMENT Recorded Aug 5, 2025
From: TEXON MIDSTREAM, LLC
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 072394/0192 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 7, 2024
From: TEXON DISTRIBUTING L.P. (D/B/A TEXON L.P.)
To: TEXON MIDSTREAM, LLC (F/K/A TEXON BLENDTECH, LLC)
Reel/Frame 067333/0110 →
SECURITY INTEREST Recorded May 2, 2024
From: TEXON MIDSTREAM, LLC
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 067300/0040 →
SECURITY INTEREST Recorded May 2, 2024
From: TEXON MIDSTREAM, LLC
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 067299/0934 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 25, 2020
From: ROBBINS, JOHN COLIN
To: TEXON LP
Reel/Frame 052229/0639 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 17, 2020
From: WAWAK, GARY S
To: TEXON LP
Reel/Frame 052143/0577 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 17, 2020
From: MATTINGLY, LARRY D
To: TEXON LP
Reel/Frame 052143/0593 →
Continuity (2)
Provisional Application 62364220 · Jul 19, 2016
Related Publication 20180023768A1 · Jan 25, 2018
Cited By (5)
US 12,345,380 US 12,393,167 US 12,422,796 US 12,461,497 US 12,554,234