Electric loadshape forecasting based on smart meter signals

Inventors: Kenny C. Gross (Escondido, CA); Mengying Li (La Jolla, CA); Benjamin P. Franklin, Jr. (Jasper, GA)
Assignee: Oracle International Corporation
G05B13/048G05B13/0265H02J3/00H02J2003/003
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,310,459
App. No.
15/715,692
Granted
Jun 4, 2019
Kind
B2
Abstract

During operation, the system receives a set of input signals containing electrical usage data from a set of smart meters, wherein each smart meter gathers electrical usage data from a customer of the utility system. Next, the system uses the set of input signals to train an inferential model, which learns correlations among the set of input signals, and uses the inferential model to produce a set of inferential signals, wherein an inferential signal is produced for each input signal in the set of input signals. The system then uses a Fourier-based technique to decompose each inferential signal into deterministic and stochastic components, and uses the deterministic and stochastic components to generate a set of synthesized signals, which are statistically indistinguishable from the inferential signals. Finally, the system projects the set of synthesized signals into the future to produce a forecast for the electricity demand.

Claims (48)

1. A method for forecasting electricity demand for a utility system, comprising:

receiving a set of input signals containing electrical usage data from a set of smart meters, wherein each smart meter in the set gathers electrical usage data from a customer of the utility system;

using the set of input signals to train an inferential model, which learns correlations among the set of input signals;

using the inferential model to produce a set of inferential signals, wherein the inferential model produces an inferential signal for each input signal in the set of input signals;

using a Fourier-based decomposition-and-reconstruction technique, which decomposes each signal in the set of inferential signals into deterministic and stochastic components, and uses the deterministic and stochastic components to generate a set of synthesized signals, which are statistically indistinguishable from the inferential signals; and

projecting the set of synthesized signals into the future to produce a forecast for the electricity demand for the utility system; using the forecast for the electricity demand to control a supply of electricity provided by the utility system.

2. The method of claim 1 , wherein controlling the supply of electricity provided by the utility system comprises one or more of the following:

controlling an amount of electricity produced by one or more power plants in the utility system;

purchasing electricity for the utility system through a power grid;

selling electricity produced by the utility system through the power grid;

storing electricity for future use by the utility system; and

making plans to construct a new power plant for the utility system.

3. The method of claim 1 , wherein generating the set of synthesized signals comprises:

generating a set of un-normalized signals; and

performing an ambient-weather-normalization operation on the set of un-normalized signals to generate the set of synthesized signals, wherein the ambient-weather-normalization operation uses historical, current and predicted weather measurements and historical electrical usage data to adjust the set of un-normalized signals to account for effects of weather on the forecast for electricity demand.

4. The method of claim 1 , wherein receiving the set of input signals comprises receiving a set of advanced metering infrastructure (AMI) signals.

5. The method of claim 1 , wherein the inferential model is trained using a nonlinear, nonparametric (NLNP) regression technique.

6. The method of claim 5 , wherein the NLNP regression technique comprises a Multivariate State Estimation Technique (MSET).

7. The method of claim 1 , wherein using the Fourier-based decomposition-and-reconstruction technique to generate the set of synthesized signals comprises using a telemetry parameter synthesis (TPSS) technique, which creates a high-fidelity synthesis equation that is used to generate the set of synthesized signals.

8. The method of claim 1 , wherein the electrical usage data comprises kilowatt measurements and kilowatt-hour measurements.

9. A non-transitory computer-readable storage medium storing instructions that when executed by a computer cause the computer to perform a method for forecasting electricity demand for a utility system, the method comprising:

receiving a set of input signals containing electrical usage data from a set of smart meters, wherein each smart meter in the set gathers electrical usage data from a customer of the utility system;

using the set of input signals to train an inferential model, which learns correlations among the set of input signals;

using the inferential model to produce a set of inferential signals, wherein the inferential model produces an inferential signal for each input signal in the set of input signals;

using a Fourier-based decomposition-and-reconstruction technique, which decomposes each signal in the set of inferential signals into deterministic and stochastic components, and uses the deterministic and stochastic components to generate a set of synthesized signals, which are statistically indistinguishable from the inferential signals; and

projecting the set of synthesized signals into the future to produce a forecast for the electricity demand for the utility system using the forecast for the electricity demand to control a supply of electricity provided by the utility system.

10. The non-transitory computer-readable storage medium of claim 9 , wherein controlling the supply of electricity provided by the utility system comprises one or more of the following:

controlling an amount of electricity produced by one or more power plants in the utility system;

purchasing electricity for the utility system through a power grid;

selling electricity produced by the utility system through the power grid;

storing electricity for future use by the utility system; and

making plans to construct a new power plant for the utility system.

11. The non-transitory computer-readable storage medium of claim 9 , wherein generating the set of synthesized signals comprises:

generating a set of un-normalized signals; and

performing an ambient-weather-normalization operation on the set of un-normalized signals to generate the set of synthesized signals, wherein the ambient-weather-normalization operation uses historical, current and predicted weather measurements and historical electrical usage data to adjust the set of un-normalized signals to account for effects of weather on the forecast for electricity demand.

12. The non-transitory computer-readable storage medium of claim 9 , wherein receiving the set of input signals comprises receiving a set of advanced metering infrastructure (AMI) signals.

13. The non-transitory computer-readable storage medium of claim 9 , wherein the inferential model is trained using a nonlinear, nonparametric (NLNP) regression technique.

14. The non-transitory computer-readable storage medium of claim 13 , wherein the NLNP regression technique comprises a Multivariate State Estimation Technique (MSET).

15. The non-transitory computer-readable storage medium of claim 9 , wherein using the Fourier-based decomposition-and-reconstruction technique to generate the set of synthesized signals comprises using a telemetry parameter synthesis (TPSS) technique, which creates a high-fidelity synthesis equation that is used to generate the set of synthesized signals.

16. The non-transitory computer-readable storage medium of claim 9 , wherein the electrical usage data comprises kilowatt measurements and kilowatt-hour measurements.

17. A system that forecasts electricity demand for a utility system, comprising:

at least one processor and at least one associated memory; and

a forecasting mechanism that executes on the at least one processor, wherein during operation, the forecasting mechanism:

receives a set of input signals containing electrical usage data from a set of smart meters, wherein each smart meter in the set gathers electrical usage data from a customer of the utility system;

uses the set of input signals to train an inferential model, which learns correlations among the set of input signals;

uses the inferential model to produce a set of inferential signals, wherein the inferential model produces an inferential signal for each input signal in the set of input signals;

uses a Fourier-based decomposition-and-reconstruction technique, which decomposes each signal in the set of inferential signals into deterministic and stochastic components, and uses the deterministic and stochastic components to generate a set of synthesized signals, which are statistically indistinguishable from the inferential signals; and

projects the set of synthesized signals into the future to produce a forecast for the electricity demand for the utility system uses the forecast for the electricity demand to control a supply of electricity provided by the utility system.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 14, 2017
From: GROSS, KENNY C.; LI, MENGYING; FRANKLIN, BENJAMIN P., JR.
To: ORACLE INTERNATIONAL CORPORATION
Reel/Frame 044123/0615 →
Continuity (1)
Related Publication 20190094822A1 · Mar 28, 2019
Cited By (1)
US 12,293,317