IP Library › Granted Patent US 11,428,251
Granted Patent B2
US 11,428,251 · App. 15/754,294 · Granted Aug 30, 2022

Weld structure of metal member and welding process

Inventors: Seiji Kumazawa (Osaka, JP); Tomomi Tanaka (Hyogo, JP); Daisuke Shioga (Nara, JP); Takayuki Ashida (Osaka, JP)
Assignee: Panasonic Intellectual Property Management Co., Ltd.
F16B5/08B23K26/244B23K26/323
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,428,251
App. No.
15/754,294
Granted
Aug 30, 2022
Kind
B2
Abstract

Weld structures of metal members include: a first member; and a second member that is layered together with the first member, wherein at least one first solidified part that extends from a surface of the first member to the inside of the first member, at least one second solidified part that is formed by a molten area extending through the first member and the second member, and at least one third solidified member that is formed by a molten area extending through the first member and the second member are provided, and the third solidified part is located closer to a non-layered surface of the second member than the second member is.

Claims (20)

1. A weld structure, comprising:

a first metal member; and

a second metal member, wherein the first metal member is located over the second metal member, wherein

at least one first solidified part that extends from a surface of the first metal member to the inside of the first metal member, at least one second solidified part that is formed by a molten area extending through the first metal member and the second metal member, and at least one third solidified part that is formed by another molten area extending through the first metal member and the second metal member are provided,

the third solidified part is located closer to a non-layered surface of the second metal member than the second solidified part is,

the at least one second solidified part and the at least one third solidified part are each located in different linear areas,

the first solidified part and the second solidified part are different types of metals, the first solidified part is an alloy of the first metal member, and the second solidified part is an alloy of the first metal member and the second metal member,

the third solidified part is an intermetallic compound,

the at least one third solidified part includes multiple third solidified parts, and the multiple third solidified parts are adjacent to each other and in contact with each other.

2. The weld structure according to claim 1 , wherein the at least one second solidified part includes multiple second solidified parts, and two or more sets of the multiple third solidified parts and the multiple second solidified parts are alternately and continuously arranged.

3. The weld structure according to claim 1 , wherein a length of the at least one third solidified part in a layered-surface direction is equal to or higher than 1.5 times a length of the at least one second solidified part in the layered-surface direction.

4. The weld structure according to claim 1 , wherein the at least one second solidified part and the at least one third solidified part are formed through a welding process, and two or more sets of the at least one second solidified part and the at least one third solidified part are alternately formed in a cross-section of the weld structure perpendicular to a welding direction in the welding process.

5. The weld structure according to claim 1 , wherein the first metal member is made of aluminum, and the second metal member is made of copper.

6. The weld structure according to claim 1 , wherein the at least one second solidified part and the at least one third solidified part are linear.

7. The weld structure according to claim 1 , wherein the first metal member is made of Ti, and the second metal member is made of Al.

8. The weld structure according to claim 1 , wherein the first metal member is made of Ni, and the second metal member is made of Al.

9. The weld structure according to claim 1 , wherein the first metal member is made of Fe, and the second metal member is made of Ti.

10. The weld structure according to claim 2 , wherein the second solidified part is located at an end of the multiple third solidified parts.

11. The weld structure according to claim 10 , wherein the second solidified part is located at both ends of the multiple third solidified parts.

12. The weld structure according to claim 1 , wherein the second solidified part and the third solidified part are each ring-shaped.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 11, 2018
From: KUMAZAWA, SEIJI; TANAKA, TOMOMI; SHIOGA, DAISUKE; ASHIDA, TAKAYUKI
To: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.
Reel/Frame 045512/0232 →
Priority Claims (1)
JP JP2015-181451 · Sep 15, 2015 · national
Continuity (1)
Related Publication 20180245616A1 · Aug 30, 2018