IP Library Granted Patent US 10,392,885
Granted Patent B2
US 10,392,885 · App. 15/821,352 · Granted Aug 27, 2019

Method and apparatus for plugging a well

Inventors: Gisle Stjern (Trondheim, NO); Gjermund Grimsbo (Trondheim, NO); Halvor Kjørholt (Trondheim, NO); Pål Viggo Hemmingsen (Trondheim, NO)
Assignee: STATOIL PETROLEUM AS
E21B23/04E21B33/1204E21B33/134E21B33/14E21B43/116
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,392,885
App. No.
15/821,352
Granted
Aug 27, 2019
Kind
B2
Abstract

A method of plugging a well extending into a formation to facilitate temporary or permanent abandonment of the well. The method comprises conveying in one trip, a plug assembly and one or more explosive charges through the well together with a structure for providing wet sealant. The plug assembly comprises a foundation plug for supporting the wet sealant. The plug assembly is set beneath a plug formation location, prior to providing the wet sealant. The method also comprises providing the wet sealant to the plug formation location via the structure, so as to submerge the one or more explosive charges in the wet sealant, and then detonating the one or more explosive charges in the wet sealant at the plug formation location to cut through a tubular or tubulars of the well and into the formation.

Claims (15)

1. A method of plugging a well extending into a formation to facilitate temporary or permanent abandonment of the well, the method comprising:

conveying, in one trip, a plug assembly and one or more explosive charges through the well together with a structure for providing a wet sealant, the structure comprising a stinger, wherein the plug assembly comprises a foundation plug conveyed at an end of the stinger and wherein the one or more explosive charges are attached to the stinger;

setting the plug assembly beneath a plug formation location prior to providing the wet sealant, wherein the foundation plug is suitable for supporting the wet sealant;

extruding the wet sealant through the stinger to the plug formation location so that the wet sealant is supported by the foundation plug, so as to submerge the one or more explosive charges in the wet sealant; and

detonating the one or more explosive charges in the wet sealant at the plug formation location to cut through a tubular or tubulars of the well and into the formation.

2. The method according to claim 1 , further comprising providing additional sealant to the plug formation location after detonating the one or more explosive charges.

3. The method according to claim 1 , further comprising pressurizing the well above the plug formation location after detonating the one or more explosive charges whilst the sealant remains wet.

4. The method according to claim 1 , wherein the plug formation location is below a production packer.

5. The method according to claim 1 , wherein said tubular or tubulars include at least a casing and a surrounding cement layer between the casing and the formation.

6. The method according to claim 5 , wherein said tubular or tubulars further include a production liner.

7. The method according to claim 1 , further comprising detonating a plurality of explosive charges, the method comprising detonating these sequentially.

8. The method according to claim 7 , wherein a lowermost charge is detonated first.

9. The method according to claim 1 , wherein the plug formation location is above a production packer, and the well comprises tubing above the production packer.

10. The method according to claim 9 , further comprising one of; pulling out the tubing above the production packer, and partially lifting the tubing above the production packer, prior to conveying the one or more explosive charges and providing the wet sealant.

11. The method according to claim 9 , further comprising leaving the tubing in the well above the production packer, throughout the plugging operation.

Assignments (2)
CHANGE OF NAME Recorded Jan 9, 2020
From: STATOIL PETROLEUM AS
To: EQUINOR ENERGY AS
Reel/Frame 051554/0479 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 14, 2018
From: STJERN, GISLE; GRIMSBO, GJERMUND; KJØRHOLT, HALVOR; HEMMINGSEN, PÅL VIGGO
To: STATOIL PETROLEUM AS
Reel/Frame 044923/0080 →
Priority Claims (1)
GB 1619910.1 · Nov 24, 2016 · national
Continuity (1)
Related Publication 20180142527A1 · May 24, 2018