IP Library Granted Patent US 10,148,402
Granted Patent B2
US 10,148,402 · App. 15/863,267 · Granted Dec 4, 2018

Method and apparatus for beam management in a wireless communication system

Inventors: Ko-Chiang Lin (Taipei, TW); Richard Lee-Chee Kuo (Taipei, TW)
Assignee: ASUSTek Computer Inc.
H04L5/0048H04B7/0617H04B7/0695H04W72/0406H04W72/085H04L5/00H04W88/02H04W88/08
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,148,402
App. No.
15/863,267
Granted
Dec 4, 2018
Kind
B2
Abstract

A method and apparatus are disclosed from the perspective of a base station. In one embodiment, the method includes the base station transmitting to a UE a control signal associated with a reference signal for beam measurement, wherein the control signal includes a beam-related information for transmitting the reference signal for beam measurement. The method also includes the base station transmitting the reference signal for beam measurement to the UE.

Claims (25)

1. A method of a base station, comprising:

the base station transmits to a UE a control signal associated with a reference signal for beam measurement, wherein the control signal triggers aperiodical transmission of the reference signal for beam measurement, and wherein the control signal includes a beam-related information for transmitting the reference signal for beam measurement and indicates how many symbols are used to carry the reference signal for beam measurement; and

the base station transmits the reference signal for beam measurement to the UE.

2. The method of claim 1 , wherein the beam-related information indicates now abandoned at least a beam on which the reference signal for beam measurement is transmitted.

3. The method of claim 1 , wherein the beam-related information indicates a first beam, and wherein the reference signal for beam measurement is transmitted on at least a refined beam of the first beam.

4. The method of claim 1 , wherein the control signal is transmitted via a control channel.

5. A method of a User Equipment (UE), comprising:

the UE receives from a base station a control signal associated with a reference signal for beam measurement, wherein the control signal includes beam-related information for transmitting the reference signal for beam measurement and indicates how many symbols are used to carry the reference signal for beam measurement; and

the UE measures the reference signal for beam measurement from the base station.

6. The method of claim 5 , wherein the beam-related information indicates at least a beam on which the reference signal for beam measurement is transmitted.

7. The method of claim 5 , wherein the beam-related information indicates a first beam, and wherein the reference signal for beam measurement is transmitted on at least a refined beam of the first beam.

8. The method of claim 5 , wherein the UE performs measurement on the reference signal for beam measurement with UE beam(s) associated with the at least a beam indicated by the beam-related information.

9. The method of claim 5 , wherein beam refinement for the UE is performed for the at least a beam indicated by the beam-related information.

10. The method of claim 5 , wherein the reference signal for beam measurement is transmitted aperiodically.

11. The method of claim 5 , wherein the control signal is transmitted via a control channel.

12. A base station, comprising:

a control circuit;

a processor installed in the control circuit; and

a memory installed in the control circuit and operatively coupled to the processor;

wherein the processor is configured to execute a program code stored in the memory to:

transmit to a UE a control signal associated with a reference signal for beam measurement, wherein the control signal triggers aperiodical transmission of the reference signal for beam measurement, and wherein the control signal includes a beam-related information for transmitting the reference signal for beam measurement and indicates how many symbols are used to carry the reference signal for beam measurement; and

transmit the reference signal for beam measurement to the UE.

13. The base station of claim 12 , wherein the beam-related information indicates at least a beam on which the reference signal for beam measurement is transmitted.

14. The base station of claim 12 , wherein the beam-related information indicates a first beam, and wherein the reference signal for beam measurement is transmitted on at least a refined beam of the first beam.

15. The base station of claim 12 , wherein the control signal is transmitted via a control channel.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 29, 2023
From: ASUSTEK COMPUTER INC.
To: ASUS TECHNOLOGY LICENSING INC.
Reel/Frame 064118/0520 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 5, 2018
From: LIN, KO-CHIANG; KUO, RICHARD LEE-CHEE
To: ASUSTEK COMPUTER INC.
Reel/Frame 044546/0425 →
Continuity (2)
Provisional Application 62443291 · Jan 6, 2017
Related Publication 20180198583A1 · Jul 12, 2018