IP Library Granted Patent US 10,781,794
Granted Patent B2
US 10,781,794 · App. 15/910,305 · Granted Sep 22, 2020

Installing blades in a wind turbine and wind turbine lifting systems

Inventor: Isaac Gil Mollà (Nantes, FR)
Assignee: GE Renewable Technologies Wind, B.V.
F03D13/10B23P11/00B25B11/00F03D1/0608F03D1/0658F05B2230/61F05B2230/6102Y02E10/721Y02P70/523
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,781,794
App. No.
15/910,305
Granted
Sep 22, 2020
Kind
B2
Abstract

An apparatus for lifting a wind turbine blade to a rotor hub includes a blade holder configured to receive and support the wind turbine blade. A connection element is configured on the blade holder and is adapted to attach directly to a mounting surface of a wind turbine rotor hub. A lifting equipment attachment is configured on the blade holder to attach to the blade holder to lifting equipment. A first steering mechanism is operably connected between the blade holder and the lifting equipment attachment to control an orientation of the blade held by the blade holder with respect to the lifting equipment attachment.

Claims (8)

1. An apparatus for lifting a rotor blade to a rotor hub of a wind turbine, comprising:

a blade holder configured to receive and support the rotor blade, wherein the blade holder is operably attached to a lifting equipment via a lifting equipment attachment;

a connection element configured on the blade holder and adapted to attach directly to a mounting surface of the rotor hub;

a first steering mechanism operably connected between the blade holder and the lifting equipment attachment to control an orientation of the rotor blade held by the blade holder with respect to the lifting equipment attachment; and

a second steering mechanism operably connected between the blade holder and the connection element to control an orientation of the rotor blade held by the blade holder with respect to the connection element.

2. The apparatus according to claim 1 , wherein the connection element comprises one or more studs located at an end thereof and configured to attach to the mounting surface of the wind turbine rotor hub.

3. The apparatus according to claim 1 , wherein the first steering mechanism is configured to rotate the blade held by the blade holder to an angle of between 30 and 60 degrees relative to a horizontal plane.

4. The apparatus according to claim 3 , wherein the connection element comprises one or more studs located at an end thereof and configured to attach to the mounting surface of the wind turbine rotor hub.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 13, 2020
From: ISAAC GIL MOLLA
To: ALSTOM RENEWABLE TECHNOLOGIES
Reel/Frame 053485/0360 →
CHANGE OF NAME Recorded Aug 13, 2020
From: ALSTOM RENEWABLE TECHNOLOGIES
To: GE RENEWABLE TECHNOLOGIES
Reel/Frame 053488/0950 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 13, 2020
From: GE RENEWABLE TECHNOLOGIES
To: GE RENEWABLE TECHNOLOGIES WIND, B.V.
Reel/Frame 053489/0464 →
Priority Claims (1)
EP 14382371 · Sep 26, 2014 · regional
Continuity (2)
Division 14859119 · Sep 18, 2015
Related Publication 20180187654A1 · Jul 5, 2018