IP Library Granted Patent US 10,734,821
Granted Patent B2
US 10,734,821 · App. 15/915,122 · Granted Aug 4, 2020

Power control system

Inventors: Mohamed Y. Haj-Maharsi (Dhahran, SA); Abdulaziz A. Altalhi (Dhahran, SA)
Assignee: Saudi Arabian Oil Company
H02J7/0021H02J3/32H02J9/062
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,734,821
App. No.
15/915,122
Granted
Aug 4, 2020
Kind
B2
Abstract

An example method includes monitoring a state of charge of one or more energy storage devices that are part of an uninterruptable power supply (UPS) that is connected electrically to a power distribution grid; obtaining information that is based, at least in part, on a voltage on the power distribution grid; and outputting a control signal that is based on the state of charge and the information. The control signal is for controlling power electronics either to output voltage from the one or more energy storage devices to the power distribution grid or to charge the one or more energy storage devices using voltage from the power distribution grid.

Claims (46)

1. A method comprising:

monitoring a state of charge of one or more energy storage devices that are part of an uninterruptable power supply (UPS), the UPS being connected electrically to a power distribution grid;

obtaining information that is based on a voltage on the power distribution grid, determining the information that is based on the voltage on the power distribution grid by determining a difference between the voltage on the power distribution grid and a reference voltage; and

outputting a control signal that is based on the state of charge and the information, the control signal for controlling power electronics either to output voltage from the one or more energy storage devices to the power distribution grid or to charge the one or more energy storage devices using voltage from the power distribution grid.

2. The method of claim 1 , where the power electronics comprises a bidirectional rectifier in an electrical pathway between at least part of the power distribution grid and the one or more energy storage devices; and

where the control signal is for controlling the bidirectional rectifier either to output the voltage from the one or more energy storage devices to the power distribution grid or to charge the one or more energy storage devices using the voltage from the power distribution grid, the information being from a grid manager for controlling at least part of the power distribution grid other than the UPS.

3. The method of claim 1 , where the power electronics comprises a bidirectional converter in an electrical pathway between at least part of the power distribution grid and the one or more energy storage devices; and

where the control signal is for controlling the bidirectional converter either to output the voltage from the one or more energy storage devices to the power distribution grid or to charge the one or more energy storage devices using the voltage from the power distribution grid, the information being from a demand manager that is local to, and for controlling at least part of, the UPS.

4. The method of claim 1 , where the information that is based on a voltage on the power distribution grid comprises a signal indicating that the voltage on the power distribution grid is below a target voltage.

5. The method of claim 1 , where monitoring the state of charge of one or more energy storage devices comprises determining whether the state of charge is below a predefined level; and

where, if the state of charge is below the predefined level, the control signal indicates to charge the one or more energy storage devices using voltage from the power distribution grid.

6. The method of claim 1 , where monitoring the state of charge of one or more energy storage devices comprises determining whether the state of charge is at or above a predefined level; and

where, if the state of charge is at or above the predefined level and the information is based on the voltage on the power distribution grid being below a target voltage, the control signal indicates to output the voltage from the one or more energy storage devices to the power distribution grid.

7. The method of claim 1 , where the information comprises a command signal;

where monitoring the state of charge of one or more energy storage devices comprises determining whether the state of charge is at or above a predefined level; and

where, if the state of charge is at or above the predefined level and the command signal indicates to perform discharging, the control signal indicates to output the voltage from the one or more energy storage devices to the power distribution grid.

8. The method of claim 1 , where the information comprises a command signal;

where monitoring the state of charge of one or more energy storage devices comprises determining whether the state of charge is below a predefined level; and

where, if the state of charge is below the predefined level and the command signal indicates to perform charging, the control signal indicates to charge the one or more energy storage devices using voltage from the power distribution grid.

9. The method of claim 1 , where the one or more energy storage devices comprises one or more batteries, at least one of the one or more batteries being lithium-based.

10. A system comprising:

memory storing instructions that are executable; and

one or more processing devices to execute the instructions to perform operations comprising:

monitoring a state of charge of one or more energy storage devices that are part of an uninterruptable power supply (UPS), the UPS being connected electrically to a power distribution grid;

obtaining information that is based on a voltage on the power distribution grid, determining the information that is based on the voltage on the power distribution grid by determining a difference between the voltage on the power distribution grid and a reference voltage; and

outputting a control signal that is based on the state of charge and the information, the control signal for controlling power electronics either to output voltage from the one or more energy storage devices to the power distribution grid or to charge the one or more energy storage devices using voltage from the power distribution grid.

11. The system of claim 10 , where the power electronics comprises a bidirectional rectifier in an electrical pathway between at least part of the power distribution grid and the one or more energy storage devices; and

where the control signal is for controlling the bidirectional rectifier either to output the voltage from the one or more energy storage devices to the power distribution grid or to charge the one or more energy storage devices using the voltage from the power distribution grid, the information being from a grid manager for controlling at least part of the power distribution grid other than the UPS.

12. The system of claim 10 , where the power electronics comprises a bidirectional converter in an electrical pathway between at least part of the power distribution grid and the one or more energy storage devices; and

where the control signal is for controlling the bidirectional converter either to output the voltage from the one or more energy storage devices to the power distribution grid or to charge the one or more energy storage devices using the voltage from the power distribution grid, the information being from a demand manager that is local to, and for controlling at least part of, the UPS.

13. The system of claim 10 , where the information that is based on a voltage on the power distribution grid comprises a signal indicating that the voltage on the power distribution grid is below a target voltage.

14. The system of claim 10 , where monitoring the state of charge of one or more energy storage devices comprises determining whether the state of charge is below a predefined level; and

where, if the state of charge is below the predefined level, the control signal indicates to charge the one or more energy storage devices using voltage from the power distribution grid.

15. The system of claim 10 , where monitoring the state of charge of one or more energy storage devices comprises determining whether the state of charge is at or above a predefined level; and

where, if the state of charge is at or above the predefined level and the information is based on the voltage on the power distribution grid being below a target voltage, the control signal indicates to output the voltage from the one or more energy storage devices to the power distribution grid.

16. The system of claim 10 , where the information comprises a command signal;

where monitoring the state of charge of one or more energy storage devices comprises determining whether the state of charge is at or above a predefined level; and

where, if the state of charge is at or above the predefined level and the command signal indicates to perform discharging, the control signal indicates to output the voltage from the one or more energy storage devices to the power distribution grid.

17. The system of claim 10 , where the information comprises a command signal;

where monitoring the state of charge of one or more energy storage devices comprises determining whether the state of charge is below a predefined level; and

where, if the state of charge is below the predefined level and the command signal indicates to perform charging, the control signal indicates to charge the one or more energy storage devices using voltage from the power distribution grid.

18. The system of claim 10 , where the one or more energy storage devices comprises one or more batteries, at least one of the one or more batteries being lithium-based.

19. One or more non-transitory machine-readable storage media storing instructions that are executable by one or more processing devices to perform operations comprising:

monitoring a state of charge of one or more energy storage devices that are part of an uninterruptable power supply (UPS), the UPS being connected electrically to a power distribution grid;

obtaining information that is based on a voltage on the power distribution grid, determining the information that is based on the voltage on the power distribution grid by determining a difference between the voltage on the power distribution grid and a reference voltage; and

outputting a control signal that is based on the state of charge and the information, the control signal for controlling power electronics either to output voltage from the one or more energy storage devices to the power distribution grid or to charge the one or more energy storage devices using voltage from the power distribution grid.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 8, 2018
From: HAJ-MAHARSI, MOHAMED Y.; ABDULAZIZ, ALTALHI A.
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 045147/0252 →
Continuity (1)
Related Publication 20190280492A1 · Sep 12, 2019
Cited By (1)
US 12,261,433