IP Library › Granted Patent US 10,766,202
Granted Patent B2
US 10,766,202 · App. 15/977,867 · Granted Sep 8, 2020

System and method for welding a chamber

Inventor: Heather D. Hender (Portland, OR)
Assignee: NIKE, Inc.
B29C65/08A43B13/023A43B13/12A43B13/125A43B13/127A43B13/181A43B13/189A43B13/20A43B13/206B29C65/04B29C65/48B29C66/1122B29C66/4326B29C66/8322B29D35/122B29D35/128B29D35/142B29C66/133B29C66/433B29C66/439B29C66/71B29C66/73921B29L2031/504
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,766,202
App. No.
15/977,867
Granted
Sep 8, 2020
Kind
B2
Abstract

A method of forming a fluid-filled chamber for an article of footwear is provided and includes positioning a first sheet of material and a second sheet of material in a pressure chamber, increasing a fluid pressure within the pressure chamber to a first value, and coupling the first sheet of material to the second sheet of material within the pressure chamber to define a fluid-filled chamber defined by the first sheet of material and the second sheet of material and having a fluid pressure equal to the first value. The method also includes decreasing the fluid pressure within the pressure chamber to a second value.

Claims (30)

1. A method of forming a fluid-filled chamber for an article of footwear, the method comprising:

positioning a first sheet of material and a second sheet of material in a pressure chamber;

increasing a fluid pressure within the pressure chamber to a first value;

applying pressure at the first value to both sides of a least one of the first sheet of material and the second sheet of material within the pressure chamber;

coupling the first sheet of material to the second sheet of material within the pressure chamber to define a fluid-filled chamber defined by the first sheet of material and the second sheet of material and having a fluid pressure equal to the first value; and

decreasing the fluid pressure within the pressure chamber to a second value.

2. The method of claim 1 , wherein the coupling step occurs after the increasing step, and the decreasing step occurs after the coupling step.

3. The method of claim 1 , wherein coupling the first sheet of material to the second sheet of material includes ultrasonically welding the first sheet of material to the second sheet of material.

4. The method of claim 1 , wherein decreasing the fluid pressure within the pressure chamber to a second value includes applying a vacuum to the pressure chamber.

5. The method of claim 1 , wherein the second value is less than a value of the fluid pressure of the atmosphere surrounding the pressure chamber.

6. The method of claim 1 , wherein the first value is between 2.0 atm and 5.0 atm.

7. The method of claim 6 , wherein the second value is between 0.7 atm and 0.9 atm.

8. The method of claim 1 , wherein positioning a first sheet of material in the pressure chamber and positioning a second sheet of material in the pressure chamber includes positioning at least one sheet of material formed from a polymer.

9. The method of claim 1 , wherein supplying a first fluid to the pressure chamber includes supplying nitrogen.

10. The method of claim 1 , further comprising removing fluid from the pressure chamber with a first fluid source and directing the removed fluid to a bellows of the first fluid source.

11. A method of forming a fluid-filled chamber for an article of footwear, the method comprising:

positioning a first sheet of material in a pressure chamber;

pressurizing the pressure chamber to a fluid pressure equal to a first value;

applying pressure at the first value to both sides of the first sheet of material within the pressure chamber;

forming a fluid-filled chamber from the first sheet of material, the fluid-filled chamber having a fluid pressure equal to the first value; and

depressurizing the pressure chamber to reduce the fluid pressure within the pressure chamber to a second value.

12. The method of claim 11 , further comprising positioning a second sheet of material in the pressure chamber, wherein forming the fluid-filled chamber from the first sheet of material includes coupling the first sheet of material to the second sheet of material, the first sheet of material and the second sheet of material collectively defining the fluid-filled chamber.

13. The method of claim 12 , wherein forming the fluid-filled chamber includes ultrasonically welding the first sheet of material to the second sheet of material.

14. The method of claim 11 , wherein the forming step occurs after the pressurizing step, and the depressurizing step occurs after the forming step.

15. The method of claim 11 , wherein forming the fluid-filled chamber includes ultrasonically welding a first portion of the first sheet of material to a second portion of the first sheet of material.

16. The method of claim 11 , wherein the first value is between 2.0 atm and 5.0 atm.

17. The method of claim 16 , wherein the second value is between 0.7 atm and 0.9 atm.

18. The method of claim 11 , wherein positioning a first sheet of material in the pressure chamber includes positioning a sheet of material formed from a polymer.

19. The method of claim 11 , wherein supplying a first fluid to the pressure chamber includes supplying nitrogen.

20. The method of claim 11 , further comprising removing fluid from the pressure chamber with a first fluid source and directing the removed fluid to a bellows of the first fluid source.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 5, 2020
From: HENDER, HEATHER D.
To: NIKE, INC.
Reel/Frame 053402/0796 →
Continuity (2)
Provisional Application 62508057 · May 18, 2017
Related Publication 20180333921A1 · Nov 22, 2018