App. No. 15/990,502

INTEGRATED DISTRIBUTION PLANNING SYSTEMS AND METHODS FOR ELECTRIC POWER SYSTEMS

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
15/990,502
Abstract

A multi-time frame distribution planning system which provides capacity planning and distributed energy resource planning is disclosed. In an embodiment, the system includes an interface for receiving electric power system input data for a plurality of data inputs including distributed energy resource data inputs and a data store including the electric power system input data. A computer processor coupled to the data store is programmed, upon receiving one or more commands, to use the electric power system input data to calculate at least one 3-phase AC power flow. The processor is further programmed to use the at least one 3-phase AC power flow to create at least one AC optimal power flow and use the AC optimal power flow to generate at least one potential scenario that includes distributed energy resources or hosting capacity for distributed energy resources.

Claims (38)

1 . A multi-time frame distribution planning system which provides capacity planning and distributed energy resource planning, comprising:

interface for receiving electric power system input data for a plurality of data inputs including distributed energy resource data inputs;

a data store including said electric power system input data; and

a computer processor coupled to the data store and programmed, upon receiving one or more commands, to:

i) use the electric power system input data to calculate at least one 3-phase AC power flow;

ii) use the at least one 3-phase AC power flow to create at least one AC optimal power flow;

iii) use the AC optimal power flow to generate at least one potential scenario that includes distributed energy resources or hosting capacity for distributed energy resources.

2 . The multi-time frame distribution planning system according to claim 1 , wherein the processor is further programmed to utilize the electric power system input data to create at least one distribution system state estimation.

3 . The multi-time frame distribution planning system according to claim 1 , wherein said AC optimal power flow comprises a probabilistic stochastic security-constrained AC power flow optimization function.

4 . The multi-time frame distribution planning system according to claim 1 , wherein the processor is further programmed to utilize multiple time frames to generate a long-term scenario.

5 . The multi-time frame distribution planning system according to claim 1 , wherein the potential scenario comprises an investment scenario, asset health and condition management plan, hosting capacity upgrade, DER value optimization plan, DER dispatch strategy, reliability improvement plan, expansion strategy, or non-wires solution.

6 . The multi-time frame distribution planning system according to claim 1 , wherein the potential scenario comprises a scenario over a short-term time frame of seconds, minutes, hours, or day-ahead.

7 . The multi-time frame distribution planning system according to claim 1 , wherein the potential scenario comprises a scenario that includes distributed energy resource and distributed automation assets by location, phase, asset, capacity and time.

8 . The multi-time frame distribution planning system according to claim 1 , wherein the processor is further programmed to use at least one potential scenario to create a feasibility assessment.

9 . The multi-time frame distribution planning system according to claim 8 , wherein said creation of said feasibility assessment comprises using the at least one potential scenario to generate a distribution power flow.

10 . The multi-time frame distribution planning system according to claim 9 , wherein said creation of said feasibility assessment comprises using the distribution power flow to create an AC optimal power flow.

11 . The multi-time frame distribution planning system according to claim 1 , wherein the processor is further programmed to use the feasibility assessment to generate a scenario prioritization of said potential scenario and at least one additional potential scenario.

12 . The multi-time frame distribution planning system according to claim 11 , wherein said scenario prioritization comprises a prioritization using multi-attribute decision-making.

13 . The multi-time frame distribution planning system according to claim 1 , wherein the processor is further programmed to use the scenario prioritization to generate a second distribution power flow.

14 . The multi-time frame distribution planning system according to claim 13 , wherein the wherein the processor is further programmed to use the second distribution power flow to generate a second AC optimal power flow.

15 . The multi-time frame distribution planning system according to claim 14 , wherein the processor is further programmed to use the second AC optimal power flow to create a nodal evaluation of said potential scenario.

16 . The multi-time frame distribution planning system according to claim 15 , wherein the processor is further programmed to use said nodal evaluation to generate at least one additional nodal evaluation.

17 . The multi-time frame distribution planning system according to claim 1 , wherein multiple users can simultaneously access common data sets and share planning functionalities.

18 . The multi-time frame distribution planning system according to claim 1 , wherein the processor is further programmed to calculate locational and temporal values of distributed energy resources so as to inform setting of distribution rates, tariffs, and DER program design.

19 . The multi-time frame distribution planning system according to claim 1 , wherein the at least one potential scenario comprises an investment scenario.

20 . The multi-time frame distribution planning system according to claim 1 , wherein the at least one potential scenario comprises at least one of: a solution, distributed energy resource assets, and distributed automation assets.

21 . The multi-time frame distribution planning system according to claim 1 , wherein the data store comprises a database and the processor is further programmed to access the database to provide a multi-user enterprise planning tool that enables multiple users to plan off common share data sets and planning functionalities

22 . A distribution planning system which provides capacity planning and distributed energy resource planning, comprising:

interface for receiving electric power system input data for a plurality of data inputs including distributed energy resource data inputs;

a data store including said electric power system input data; and

a computer processor coupled to the data store and programmed, upon receiving one or more commands, to:

i) use the electric power system input data to create at least one distribution system state estimation;

ii) use the distribution system state estimation to create at least one 3-phase AC power flow;

iii) use the 3-phase AC power flow to create at least one AC optimal power flow;

iv) use the at least one AC optimal power flow to generate at least one potential scenario that includes distributed energy resources or hosting capacity for distributed energy resources.

23 . The distribution planning system according to claim 22 , wherein the processor is further programmed to use the at least one AC optimal power flow to derive at least one hosting capacity.

24 . The distribution planning system according to claim 23 , wherein the processor is further programmed to derive the at least one hosting capacity on a specified node, phase, feeder, substation or region for each specific hour time interval among a plurality of time intervals.

25 . The distribution planning system according to claim 22 , wherein the processor is further programmed to use the at least one AC optimal power flow to derive at least one value of distributed energy resource results.