Method for predicting the accumulation of ice on a rotor blade of a wind turbine and the use thereof

Inventors: Mathias Müller (Munich, DE); Thomas Schauss (Gilching, DE); Florian Rieger (Munich, DE); Mathias Schubert (Rendsburg, DE)
Assignee: FOS4X GMBH
F03D80/40F03D17/00F05B2260/80F05B2260/821F05B2270/334F05B2270/404Y02E10/72
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,718,316
App. No.
16/066,815
Granted
Jul 21, 2020
Kind
B2
Abstract

Embodiments describe a method for predicting the accumulation of ice on a rotor blade ( 111, 112 ) of a wind turbine ( 100 ) and the use thereof. The method comprises defining an upper threshold value (So) and/or a lower threshold value (Su) for a system variable (S) which is associated with the mass of the rotor blade ( 111, 112 ) and/or with the mass of an ice attachment ( 1 ) of the rotor blade ( 111, 112 ); acquiring system variable data during an acquisition time period (T); carrying out a compensation calculation of the curve profile for a prediction time period (Δt 1 ′, Δt 2 ′, Δt 3 ′) from the system variable data which were acquired during a partial time period (Δt 1 , Δt 2 , Δt 3 ) of the acquisition time period (T) in order to obtain a prediction curve (N 1 , N 2 , N 3 ); carrying out at least one further compensation calculation of the curve profile for a further prediction time period (Δt 1 ′, Δt 2 ′, Δt 3 ′) from the system variable data which were acquired during another partial time period (Δt 1 , Δt 2 , Δt 3 ) of the acquisition time period (T) in order to obtain a further prediction curve (N 1 , N 2 , N 3 ); determining whether or not the upper threshold value (So) will be exceeded by one or more of the prediction curves (N 1 , N 2 , N 3 ) in future and/or whether the lower threshold value (Su) will not be undershot by one or more of the prediction curves (N 1 , N 2 , N 3 ) in the future; and outputting the result of the determination; and outputting the result of the determination.

Claims (52)

1. A method for predicting the accumulation of ice on a rotor blade of a wind turbine, comprising:

defining at least one of an upper threshold value or a lower threshold value for a system variable, which is associated with at least one of the mass of the rotor blade, or the mass of an ice attachment of the rotor blade;

acquiring system variable data during an acquisition time period for obtaining a curve profile of the system variable during the acquisition time period;

carrying out a compensation calculation of the curve profile for a prediction time period from the system variable data which were acquired during a partial time period of the acquisition time period in order to obtain a prediction curve;

carrying out at least one further compensation calculation of the curve profile for a further prediction time period from the system variable data which were acquired during another partial time period of the acquisition time period in order to obtain a further prediction curve;

determining at least one of whether or not the upper threshold value will be exceeded by one or more of the prediction curves in the future, or whether or not the lower threshold value will be undershot by one or more of the prediction curves in the future; and

outputting the result of the determination.

2. The method according to claim 1 , further comprising at least one of:

if it is determined that the upper threshold value will be exceeded by one or more of the prediction curves in the future, an ice warning message is output; or

if it is determined that the lower threshold value will be undershot by one or more of the prediction curves in the future, a free-of-ice message is output.

3. The method according to claim 1 ,

wherein

the system variable is proportional to at least one of the total mass of the rotor blade, or an additional deposit on the mass of the rotor blade.

4. The method according to claim 1 ,

further comprising:

determining and outputting at least one of

a prospective exceeding point of time when a minimum amount of ice on the rotor blade will be exceeded, or

a prospective undershooting point of time when a maximum amount of ice on the rotor blade will be undershot.

5. The method according to claim 1 ,

wherein the acquiring of system variable data comprises:

measuring a measurand in the temporal course of the acquisition time period; and

deducing the system variable from the measurement data.

6. The method according to claim 5 ,

wherein the measuring the measurand is measuring vibrations at or in the rotor blade.

7. The method according to claim 6 ,

wherein the deducing the system variable is deducing the system variable by a natural frequency analysis.

8. The method according to claim 1 ,

wherein each of the compensation calculations is respectively carried out for a prediction time period in the future, which is at maximum as long as the partial time period of acquired system variable data used for the respective compensation calculation.

9. The method according to claim 8 ,

wherein the prediction time period is of the same length as the partial time period of the acquired system variable data.

10. The method according to claim 1 ,

further comprising at least one of:

deducing a probability, whether or not a minimum amount of ice will be accumulated on a rotor blade, from at least one of the respective prediction time period, the respective exceeding point of time, or the respective curve profile of the respective prediction curve; or

deducing a probability, whether or not a maximum amount of accumulated ice on a rotor blade will be undershot, from at least one of the respective prediction time period, the respective undershooting point of time, or the respective curve profile of the respective prediction curve.

11. The method according to claim 1 , further comprising:

deducing the amount of ice which is expected to be accumulated on the rotor blade, from at least one of the respective prediction time period, the respective exceeding point of time, or the respective curve profile of the respective prediction curve.

12. The method according to claim 1 ,

wherein at least one of the compensation calculations is a linear or a square regression.

13. The method according to claim 12 ,

wherein all of the compensation calculations are a linear or a square regression.

14. The method according to claim 1 ,

wherein the partial time periods has a length of approximately one hour or more and the respective partial time periods thereof have a length of about 1 hour, about 2 hours or about 4 hours.

15. The method according to claim 14 ,

wherein at least three compensation calculations are carried out.

16. The method according to claim 1 ,

wherein the lengths of the respective partial time periods are defined in advance.

17. The method according to claim 16 ,

wherein the lengths of the respective partial time periods are defined in advance as at least one of a function of the location of the wind turbine, or a function of meteorological supporting data.

18. The method according to claim 1 ,

wherein the lengths of the respective partial time periods are adjusted during the operation of the wind turbine as a function of the plant size of the wind turbine.

19. The method according to claim 1 ,

wherein the lengths of the respective partial time periods are adjusted during the operation of the wind turbine as at least one of a function of the rotor blade speed of the rotor of the wind turbine, or a function of meteorological supporting data.

Assignments (4)
CORRECTIVE ASSIGNMENT TO CORRECT THE TYPOGRAPHICAL ERROR IN STRRET ADDRESS OF ASSIGNEE-SHOULD BE "INDUSTRIVEJ" NOT "INDUSTRIEVEJ" PREVIOUSLY RECORDED AT REEL: 064897 FRAME: 0939. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Oct 5, 2023
From: FOS4X GMBH
To: VC VIII POLYTECH HOLDING APS
Reel/Frame 065578/0741 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 14, 2023
From: FOS4X GMBH
To: VC VIII POLYTECH HOLDING APS
Reel/Frame 064897/0939 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 18, 2019
From: MULLER, MATHIAS; RIEGER, FLORIAN; SCHUBERT, MATTHIAS
To: FOS4X GMBH
Reel/Frame 048058/0315 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 29, 2018
From: SCHAUSS, THOMAS
To: FOS4X GMBH
Reel/Frame 047337/0545 →
Priority Claims (1)
DE 10 2015 122 932 · Dec 29, 2015 · national
Continuity (1)
Related Publication 20190010932A1 · Jan 10, 2019
Cited By (1)
US 12,352,238