IP Library Granted Patent US 10,823,500
Granted Patent B2
US 10,823,500 · App. 16/091,530 · Granted Nov 3, 2020

Gas processing facility

Inventors: Teru Asaka (Kanagawa, JP); Marc Ellmer (The Hague, NL)
Assignees: JGC CORPORATION; ELBRONS B.V.
F25J1/0297B01D53/1456C10L3/101C10L3/12F25J1/0022F25J1/0052F25J1/0055F25J1/0087F25J1/0216F25J1/0241F25J1/0292F25J1/0296F28B5/00F28B9/04F28C1/14F28F25/06B01D2256/24B01D2256/245B01D2257/602B01D2257/702B01D2257/80C10L2290/06F25J2220/64
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,823,500
App. No.
16/091,530
Granted
Nov 3, 2020
Kind
B2
Abstract

An air-cooled heat exchanger ( 6 ) arranged in a gas processing facility for performing a liquefaction process of natural gas is configured to supply cooling air to a tube ( 63 ) through which a fluid to be cooled is caused to flow, to thereby cool the fluid to be cooled, and a mist supply section ( 7 ) is configured to supply mist obtained by spraying demineralized water, to thereby cool the cooling air. Further, the mist supply section ( 7 ) is configured to spray the demineralized water from a lateral position on an upstream side of an intake.

Claims (20)

1. A gas processing facility for performing at least one of liquefaction of natural gas, separation and recovery of a component in the natural gas, production of synthesis gas from the natural gas, or synthesis of a compound containing the natural gas or the synthesis gas as a raw material,

the gas processing facility comprising:

an air-cooled heat exchanger configured to supply cooling air taken through an intake into a tube through which a fluid to be cooled is caused to flow, to thereby cool the fluid to be cooled;

a windshield arranged at the intake of the air-cooled heat exchanger configured to block wind flowing into a space below the air-cooled heat exchanger, wherein the windshield is arranged at a position facing an inflow direction of the wind; and

a mist supply section configured to supply mist, which is obtained by spraying demineralized water to the cooling air to be taken into the air-cooled heat exchanger, to thereby cool the cooling air,

the mist supply section being configured to spray the demineralized water from a lateral position on an upstream side of the intake.

2. The gas processing facility according to claim 1 , further comprising a pipe rack having a framework structure, which is configured to hold a bundle of pipes through which the fluid to be cooled is caused to flow,

wherein the air-cooled heat exchanger is arranged in a top portion of the pipe rack at a position above the bundle of the pipes in a state in which the intake is oriented downward, and

wherein the mist supply section is configured to spray the demineralized water from a lateral side toward the space below the air-cooled heat exchanger having the intake opened therein.

3. The gas processing facility according to claim 2 ,

wherein the pipe rack comprises a floor configured to partition the bundle of the pipes and the air-cooled heat exchanger, and

wherein the demineralized water is sprayed from the mist supply section toward a space between the air-cooled heat exchanger and the floor.

4. The gas processing facility according to claim 3 , wherein the mist supply section is configured to spray the demineralized water at a height position within a range of up to two thirds of a lower side of the height from the floor to the intake of the air-cooled heat exchanger.

5. The gas processing facility according to claim 2 ,

wherein the pipe rack is formed into a rectangle when viewed from an upper surface side of the pipe rack,

wherein the air-cooled heat exchanger comprises a plurality of air-cooled heat exchangers arranged side by side in series along a short side of the rectangle, and

wherein a plurality of groups, each including the plurality of air-cooled heat exchangers, are arranged side by side along a long side of the rectangle.

6. The gas processing facility according to claim 5 , wherein the mist supply section is arranged along the long side of the pipe rack.

7. The gas processing facility according to claim 2 , wherein the mist supply section comprises a plurality of spray nozzles configured to spray the demineralized water at different height positions.

8. The gas processing facility according to claim 7 , wherein, out of the plurality of spray nozzles configured to spray the demineralized water at the different height positions, a part of the plurality of spray nozzles is configured to spray the demineralized water in a direction opposite to a direction opposed to the space below the air-cooled heat exchanger.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 5, 2020
From: JGC HOLDINGS CORPORATION
To: JGC CORPORATION
Reel/Frame 051718/0806 →
CHANGE OF NAME Recorded Dec 24, 2019
From: JGC CORPORATION
To: JGC HOLDINGS CORPORATION
Reel/Frame 051415/0772 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 23, 2018
From: ASAKA, TERU; ELLMER, MARC
To: JGC CORPORATION; ELBRONS B.V.
Reel/Frame 047268/0893 →
Continuity (1)
Related Publication 20190128599A1 · May 2, 2019