IP Library Granted Patent US 10,627,185
Granted Patent B2
US 10,627,185 · App. 16/096,468 · Granted Apr 21, 2020

Bow limb and archery bow using same

Inventors: Douglas Lewis Marriott (South Lebanon, OH); Shannon R. Read (Lebanon, OH); Clinton A. Haynes (Mason, OH); Daniel L. Morrow (Batavia, OH); Herbert E. Stumph, III (Sugar Creek Township, OH)
Assignee: STRESS ENGINEERING SERVICES, INC.
F41B5/123F41B5/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,627,185
App. No.
16/096,468
Granted
Apr 21, 2020
Kind
B2
Abstract

A limb for an archery bow is provided. The limb includes an outer elongate member, an inner elongate member, and a core member. The outer elongate member is formed of a first material and includes an interior surface and an exterior surface. The inner elongate member is formed of a second material and includes an interior surface and an exterior surface. The core member is formed of a third material and is sandwiched between the outer elongate member and the inner elongate member. The core member is coupled with at least a portion of each of the interior surfaces of the outer elongate member and the inner elongate member. The outer elongate member and the inner elongate member are configured to move relative to each other when the limb is bent. The first material and the second material are each stiffer than the third material.

Claims (21)

1. A limb for an archery bow, the limb comprising:

an outer elongate member formed of a first material and comprising an interior surface and an exterior surface;

an inner elongate member formed of a second material and comprising an interior surface and an exterior surface; and

a core member formed of a third material and sandwiched between the outer elongate member and the inner elongate member, the core member being coupled with at least a portion of each of the interior surfaces of the outer elongate member and the inner elongate member; wherein:

the outer elongate member and the inner elongate member are configured to move relative to each other when the limb is bent;

the first material and the second material are each stiffer than the third material;

the first material and the second material comprise one or more of high strength steel, beryllium copper, and titanium; and

the third material comprises an elastomeric material.

2. An archery bow comprising the limb of claim 1 .

3. A limb for an archery bow, the limb comprising:

an outer elongate member formed of a first material and comprising an interior surface and an exterior surface;

an inner elongate member formed of a second material and comprising an interior surface and an exterior surface; and

a core member formed of a third material and sandwiched between the outer elongate member and the inner elongate member, the core member being coupled with at least a portion of each of the interior surfaces of the outer elongate member and the inner elongate member; wherein:

the outer elongate member and the inner elongate member are configured to move relative to each other when the limb is bent;

the first material and the second material are each stiffer than the third material; and

the outer elongate member and the inner elongate member each comprise a central member and a pair of leg members that extend from and cooperate with the central member to define a c-shaped portion.

4. The limb of claim 3 wherein:

the core member is coupled with the interior surface located at the central member of each of the outer elongate member and the inner elongate member; and

the core member is decoupled from the interior surface located at each leg member of the pair of leg members of each of the outer elongate member and the inner elongate member.

5. An archery bow comprising the limb of claim 4 .

6. An archery bow comprising the limb of claim 3 .

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 26, 2018
From: MARRIOTT, DOUGLAS LEWIS; READ, SHANNON R.; HAYNES, CLINTON A.; MORROW, DANIEL L.; STUMPH, HERBERT E., III
To: STRESS ENGINEERING SERVICES, INC.
Reel/Frame 047322/0980 →
Continuity (2)
Provisional Application 62327035 · Apr 25, 2016
Related Publication 20190120588A1 · Apr 25, 2019
Cited By (12)
US 12,188,740 US 12,326,315 US 12,449,224 US 12,460,892 US 12,460,893 US 12,480,735 US 12,516,904 US 12,546,555 US 12,560,404 US 12,566,041 US 12,566,042 US 12,571,607