IP Library Granted Patent US 11,352,843
Granted Patent B2
US 11,352,843 · App. 16/098,160 · Granted Jun 7, 2022

System and method for offline standbuilding

Inventor: Jonathan Douglas Callaghan (Edmonton, CA)
Assignee: NOV CANADA ULC
E21B19/20E21B19/00E21B19/06E21B19/14E21B19/16E21B19/161
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,352,843
App. No.
16/098,160
Granted
Jun 7, 2022
Kind
B2
Abstract

A drill rig having a drill pipe standbuilding system. The standbuilding system may have one or more offline mouseholes, such as two offline mouseholes, a hoist arranged on a rail system, and an iron roughneck. The rail system may be arranged on the mast, such as above a racking board. The hoist may extend from the rail system, through the racking board, and toward a drill floor of the drill rig. The offline mouseholes, rail system, hoist, and iron roughneck may allow drill pipe stands to be built without interrupting or slowing drilling operations. A method of standbuilding may include arranging a first pipe section in a first mousehole, arranging a second pipe section in a second mousehole, coupling a third pipe section to the second pipe section to form a double stand, and coupling the second pipe section to the first pipe section to form a triple stand.

Claims (30)

1. A drill rig comprising:

a drill floor for performing drilling operations and having a longitudinal centerline extending through a setback area and across well center defining a driller side and an off-driller side;

a mast having a racking board adjacent the mast and extending laterally away from the mast;

a mousehole arranged at or near well center; and

an offline standbuilding system for building drill pipe stands without interrupting drilling operations;

the system comprising:

a first offline mousehole arranged in the setback area of the drill floor and on the off-driller side of the drill floor;

a second offline mousehole arranged adjacent the first offline mousehole, the second offline mousehole being arranged in the setback area and on the off-driller side of the drill floor; and

a rail system arranged above and extending across a top of the racking board, the rail system comprising:

a pair of rails spaced apart from one another and extending laterally away from the mast;

a bridge spanning between and operably coupled to the pair of rails and moveable along the pair of rails laterally toward and away from the mast across the top of the racking board;

a hoist trolley operably coupled to the bridge and configured to move back and forth along the bridge; and

a hoist supported by the bridge via the hoist trolley and configured for handling sections of drill pipe;

wherein, the pair of rails have a length allowing the bridge to be aligned above the first and second offline mouseholes.

2. The drill rig of claim 1 , further comprising a racking board frame sized and arranged to allow the hoist to operate inside the racking board frame.

3. The drill rig of claim 1 , wherein the hoist comprises a hydraulic hoist or an electric hoist.

4. The drill rig of claim 1 , wherein the hoist comprises a wireline and a pipe sling or pipe elevator.

5. The drill rig of claim 4 , wherein the pipe sling or pipe elevator is configured to hoist two drill pipe sections simultaneously.

6. The drill rig of claim 1 , further comprising an iron roughneck arranged on the drill floor for coupling drill pipe sections together to form drill pipe stands.

7. An offline standbuilding system for building drill pipe stands on a drill floor without interrupting drilling operations, the drill floor having a longitudinal centerline extending through a setback area and across well center and defining a driller side and an off driller side, the system comprising:

a first offline mousehole arranged in the setback area of the drill floor and on the off-driller side of the drill floor;

a second offline mousehole arranged adjacent the first offline mousehole, the second offline mousehole being arranged in the setback area and on the off-driller side of the drill floor; and

a rail system arranged above and extending across a top of a racking board, the racking board being arranged adjacent to and extending laterally away from a mast on the drill rig, the rail system comprising:

a pair of rails spaced apart from one another and extending laterally away from the mast;

a bridge spanning between and operably coupled to the pair of rails and moveable along the pair of rails laterally toward and away from the mast across the top of the racking board;

a hoist trolley operably coupled to the bridge and configured to move back and forth along the bridge; and

a hoist supported by the bridge via the hoist trolley and configured for handling sections of drill pipe,

wherein, the pair of rails have a length allowing the bridge to be aligned above the first and second offline mouseholes.

8. The offline standbuilding system of claim 7 , wherein the hoist comprises a wireline and a pipe sling or pipe elevator.

9. The offline standbuilding system of claim 7 , further comprising an iron roughneck for coupling drill pipe sections together to form drill pipe stands.

Assignments (2)
MERGER Recorded Nov 11, 2021
From: DRECO ENERGY SERVICES ULC
To: NOV CANADA ULC
Reel/Frame 058733/0334 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 4, 2019
From: CALLAGHAN, JONATHAN DOUGLAS
To: DRECO ENERGY SERVICES ULC
Reel/Frame 048789/0590 →
Continuity (2)
Provisional Application 62335282 · May 12, 2016
Related Publication 20190145197A1 · May 16, 2019
Cited By (1)
US 12,215,554