IP Library Granted Patent US 10,908,600
Granted Patent B2
US 10,908,600 · App. 16/115,833 · Granted Feb 2, 2021

Method and device for managing the temperature of a module of a production line

Inventors: Gregory Choplin (Corcelles les Cîteaux, FR); Jean-Yves Kuntz (Reichstett, FR); Franck Klotz (Laval, CA)
Assignee: SIDEL PACKING SOLUTIONS
G05B19/4189B65B53/02G05D23/1917G05B2219/32209G05B2219/49051
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,908,600
App. No.
16/115,833
Granted
Feb 2, 2021
Kind
B2
Abstract

The invention relates to a method for managing a main module ( 1 ) of a production line, with said main module ( 1 ) being equipped with thermal means that operate in production at a setpoint temperature ( 1000 ), method in which during production, when there is a break in production continuity at said main module ( 1 ), the temperature of said thermal means is lowered, and then their temperature is reset until said setpoint temperature ( 1000 ) is reached. Advantageously, at least data from a past event comprising at least one temperature rise time of said thermal means from a first temperature to a second temperature is recorded, and based on said data, the temperature of said thermal means is adapted automatically to reach said setpoint temperature ( 1000 ), at the latest when the production continuity resumes at said main module ( 1 ). The object of the invention is also a corresponding management device.

Claims (34)

1. Method for managing a main module ( 1 ) of a product production line, with said line comprising at least one module that is located upstream or downstream ( 3 ) from said main module ( 1 ), with said main module ( 1 ) being equipped with thermal means that operate in production at a setpoint temperature ( 1000 ), method in which:

lowering the temperature of said thermal means during production, when there is a break in production continuity at said main module ( 1 ) over a period of time;

resetting the temperature of said thermal to said setpoint temperature ( 1000 );

wherein:

recording data comprising past data, with said past data comprising at least one similar past event that has taken place during product production and comprising at least one temperature rise time of said thermal means from a first temperature to a second temperature;

adjusting, based on said data, the temperature of said thermal means automatically to reach said setpoint temperature ( 1000 ), at the latest when the production continuity resumes at said main module ( 1 ).

2. Management method according to claim 1 , wherein said past data comprises:

a prior length of time during which the temperature of said thermal means was lowered and then reset;

a length of time of resolution, during which a specific problem that took place at said main module ( 1 ), said upstream and/or downstream module ( 3 ), has been resolved; and/or

a length of time that it takes for production to resume between said main module ( 1 ), an upstream and/or downstream module ( 3 ).

3. Management method according to claim 1 , wherein known data are recorded in addition within said data, with said known data relating to a setpoint and comprising:

a planned length of time for stoppage of the travel of products along said product production line; and/or

a length of time that is estimated and acquired by an operator.

4. Management method according to claim 1 , wherein multiple values from the same past data category are recorded, and the most unfavorable value among the multiple values is applied for adapting the temperature of said thermal means automatically.

5. Management method according to claim 4 , wherein the oldest value from the same past data category is replaced by a newly-recorded value.

6. Management method according to claim 1 , wherein said thermal means of the main module ( 1 ) comprises an associated means, and wherein the operation of said associated means is modified based on said data over said period of said stoppage.

7. Management method according to claim 2 , wherein known data are recorded in addition within said data, with said known data relating to a setpoint and comprising:

a planned length of time for stoppage of the travel of products along said product production line; and/or

a length of time that is estimated and acquired by an operator.

8. Management method according to claim 2 , wherein multiple values from the same past data category are recorded, and the most unfavorable value is applied for adapting the temperature of said thermal means automatically.

9. Management method according to claim 3 , wherein multiple values from the same past data category are recorded, and the most unfavorable value is applied for adapting the temperature of said thermal means automatically.

10. Management method according to claim 2 , wherein said thermal means of the main module ( 1 ) comprise associated means, and wherein the operation of said associated means is modified based on said data over said period of said stoppage.

11. Management method according to claim 3 , wherein said thermal means of the main module ( 1 ) comprise associated means, and wherein the operation of said associated means is modified based on said data over said period of said stoppage.

12. Management method according to claim 4 , wherein said thermal means of the main module ( 1 ) comprise associated means, and wherein the operation of said associated means is modified based on said data over said period of said stoppage.

13. Management method according to claim 5 , wherein said thermal means of the main module ( 1 ) comprise associated means, and wherein the operation of said associated means is modified based on said data over said period of said stoppage.

14. Management method according to claim 7 , wherein multiple values from the same past data category are recorded, and the most unfavorable value is applied for adapting the temperature of said thermal means automatically.

15. Management method according to claim 7 , wherein said thermal means of the main module ( 1 ) comprise associated means, and wherein the operation of said associated means is modified based on said data over said period of said stoppage.

16. Management method according to claim 8 , wherein said thermal means of the main module ( 1 ) comprise associated means, and wherein the operation of said associated means is modified based on said data over said period of said stoppage.

17. Device for managing at least one main module within a product production line, with said main module ( 1 ) comprising thermal means and means ( 5 ) for monitoring at least the temperature of said thermal means, wherein said device comprises management means ( 6 ) having:

a means for recording data including past data, with said past data comprising at least one similar past event that has taken place during product production and comprising at least one temperature rise time of said thermal means from a first temperature to a second temperature;

an automatic control means of said monitoring means ( 5 ) adjusting said temperature of the thermal means based on said data.

18. Management device according to claim 17 , wherein said recording means comprise means for selecting values for each of said past data.

19. Management device according to claim 17 , further comprising a means ( 8 ) for detecting a stoppage that takes place at said main module ( 1 ) and/or an interruption at said upstream and/or downstream module ( 3 ).

20. Management device according to claim 18 , further comprising means ( 8 ) for detecting a stoppage that takes place at said main module ( 1 ) and/or an interruption at said upstream and/or downstream module ( 3 ).

Assignments (2)
CHANGE OF NAME Recorded Oct 29, 2019
From: C.E.R.M.E.X. CONSTRUCTIONS ETUDES ET RECHERCHES DE MATERIELS POUR L'EMBALLAGE D'EXPEDITION
To: SIDEL PACKING SOLUTIONS
Reel/Frame 050849/0987 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 13, 2018
From: CHOPLIN, GREGORY; KUNTZ, JEAN-YVES; KLOTZ, FRANCK
To: C.E.R.M.E.X. CONSTRUCTIONS ETUDES ET RECHERCHES DE MATÉRIELS POUR L'EMBALLAGE D'EXPÉDITION
Reel/Frame 047508/0254 →
Priority Claims (1)
FR 17 57975 · Aug 30, 2017 · national
Continuity (1)
Related Publication 20190064781A1 · Feb 28, 2019