IP Library › Granted Patent US 10,985,561
Granted Patent B2
US 10,985,561 · App. 16/125,106 · Granted Apr 20, 2021

Method for monitoring and controlling an electrical network

Inventors: Benoit Vinot (Grenoble, FR); Nicolas Gast (Gieres, FR); Florent Cadoux (Bernin, FR); Rodolphe Heliot (Saint Martin le Vinoux, FR)
Assignee: Schneider Electric Industries SAS
H02J3/14G06N3/08G06Q10/06G06Q50/06H02J3/003H02J3/382H02J2203/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,985,561
App. No.
16/125,106
Granted
Apr 20, 2021
Kind
B2
Abstract

A method for monitoring and controlling an electrical network that includes at least one transformer station delimiting a medium-voltage sub-network and a low-voltage sub-network and a plurality of entities that are connected to a determined voltage in the low-voltage sub-network, each entity being a consumer and/or a producer of electricity in the low-voltage sub-network. The method includes determining control data on the production and/or on the consumption of electricity to be applied to one or more entities of the low-voltage sub-network taking into account previously determined production and/or consumption quotas.

Claims (55)

1. A method for monitoring and controlling an electrical network that comprises at least one transformer station (P) delimiting a medium-voltage sub-network and a low-voltage sub-network and a plurality of entities (Ei) that are connected to a determined voltage in the low-voltage sub-network, each entity being a consumer and/or a producer of electricity in the low-voltage sub-network, said method being implemented by a monitoring and control system comprising at least one processing unit, wherein said method further comprises:

a step of acquiring an amount of electrical power consumed and/or produced by each entity (Ei) of the low-voltage sub-network at successive time intervals;

a step of determining, at each new time interval, a production and/or consumption quota (q) to be attributed to each entity (Ei);

a step of determining a minimum (q min (t)) and a maximum (q max (t)) production and/or consumption quota value to be observed for each entity (Ei) taking into account the amount of electrical power consumed and/or produced at a time interval (p cons (t−1), p prod (t−1)) preceding said new time interval;

a step of determining a projected consumed and/or produced amount of electrical power ( , ) for each entity, based on said consumed and/or produced amount of electrical power acquired at a time interval preceding said new time interval;

said production and/or consumption quota (q) being a solution to an optimization problem taking into account:

at least one unique data model (MD 1 , MD 2 ) acquired by learning, applied at each new time interval and including data that are representative of an effect of the amount of electrical power consumed and/or produced by each entity (Ei) on at least one monitored electrical quantity;

technical constraints to be observed for said at least one monitored quantity;

said determined minimum and maximum production and/or consumption quota values;

said determined projected consumed and/or produced amount of electrical power for each entity;

an optimization function selected to allocate the production and/or consumption quotas to the entities;

a step of determining control data (Dx) on the production and/or on the consumption of electricity to be applied to one or more entities of the low-voltage sub-network taking into account each determined production and/or consumption quota.

2. The method according to claim 1 , wherein said at least one monitored electrical quantity corresponds to the voltage standard of each entity at its connection point.

3. The method according to claim 2 , wherein said constraints to be observed for said at least one monitored electrical quantity correspond to a minimum voltage value (u min ) and a maximum voltage value (u max ) for each entity (Ei).

4. The method according to claim 1 , wherein said at least one monitored electrical quantity corresponds to the electrical power passing through the transformer station.

5. The method according to claim 4 , wherein said constraints to be observed for said at least one monitored electrical quantity correspond to a minimum value (p trans min ) of power passing through the transformer station (P) and a maximum value (p trans max ) of power passing through the transformer station (P).

6. The method according to claim 1 , wherein said at least one monitored electrical quantity corresponds to the standard for the amperage passing through a cable.

7. The method according to claim 1 , wherein said optimization function is selected from:

maximizing the sum of the production and/or consumption quotas attributed to the entities (Ei);

maximizing the equity of the consumption restrictions between the entities; or

maximizing the logarithm of the power attributed to each entity (Ei).

8. The method according to claim 1 , wherein the step of determining a minimum (q min (t)) and a maximum (q max (t)) production and/or consumption quota value to be observed for each entity (Ei) is carried out while taking into account technical data (D 20 ) relating to each entity (Ei), selected from one or more of the following data:

a level of power attributed to each entity (Ei) according to its supply contract;

data relating to the electricity production solution installed within each producer entity;

a maximum amount of cappable power or energy per entity;

data relating to the storage capacity of the entity (Ei) if this entity is a producer.

9. The method according to claim 1 , comprising a step of determining the number of new electrical data on the electrical network and a step of updating said at least one data model (MD 1 , MD 2 ) of the electrical network when enough acquired electrical data are available.

10. A system for monitoring and controlling an electrical network that comprises at least one transformer station (P) delimiting a medium-voltage sub-network and a low-voltage sub-network and a plurality of entities (Ei) that are connected to a determined voltage in the low-voltage sub-network, each entity being a consumer and/or a producer of electricity in the low-voltage sub-network, wherein said system comprises:

a module for acquiring an amount of electrical power consumed and/or produced by each entity (Ei) of the low-voltage sub-network at successive time intervals;

a control module (M 2 ) configured:

to determine, at each new time interval, a production and/or consumption quota (q) to be attributed to each entity (Ei);

to determine a minimum (q min (t)) and a maximum (q max (t)) production and/or consumption quota value to be observed for each entity (Ei) taking into account the amount of electrical power consumed and/or produced at a time interval (p cons (t−1), p prod (t−1)) preceding said new time interval;

to determine a projected consumed and/or produced amount of electrical power ( , ) for each entity, based on said consumed and/or produced amount of electrical power acquired at a time interval preceding said new time interval;

said production and/or consumption quota (q) being a solution to an optimization problem taking into account:

at least one unique data model (MD 1 , MD 2 ) acquired by learning, applied at each new time interval and including data that are representative of an effect of the amount of electrical power consumed and/or produced by each entity (Ei) on at least one monitored electrical quantity;

technical constraints to be observed for said at least one monitored quantity;

said determined minimum and maximum production and/or consumption quota values;

said determined projected consumed and/or produced amount of electrical power for each entity;

an optimization function selected to allocate the production and/or consumption quotas to the entities;

to determine control data (Dx) on the production and/or on the consumption of electricity to be applied to one or more entities of the low-voltage sub-network taking into account each determined production and/or consumption quota.

11. The system according to claim 10 , wherein said at least one monitored electrical quantity corresponds to the voltage standard of each entity at its connection point.

12. The system according to claim 11 , wherein said constraints to be observed for said at least one monitored electrical quantity correspond to a minimum voltage value (u min ) and a maximum voltage value (u max ) for each entity (Ei).

13. The system according to claim 10 , wherein said at least one monitored electrical quantity corresponds to the electrical power passing through the transformer station.

14. The system according to claim 13 , wherein said constraints to be observed for said at least one monitored electrical quantity correspond to a minimum value (p trans min ) of power passing through the transformer station (P) and a maximum value (p trans max ) of power passing through the transformer station (P).

15. The system according to claim 10 , wherein said at least one monitored electrical quantity corresponds to the standard for the amperage passing through a cable.

16. The system according to claim 10 , wherein said optimization function is selected from:

maximizing the sum of the production and/or consumption quotas attributed to the entities (Ei);

maximizing the equity of the consumption restrictions between the entities; or

maximizing the logarithm of the power attributed to each entity (Ei).

17. The system according to claim 10 , wherein the control module (M 2 ) is configured to determine a minimum (q min (t)) and a maximum (q max (t)) production and/or consumption quota value to be observed for each entity (Ei) while taking into account technical data (D 20 ) relating to each entity (Ei), selected from one or more of the following data:

a level of power attributed to each entity (Ei) according to its supply contract;

data relating to the electricity production solution installed within each producer entity;

a maximum amount of “cappable” power or energy per entity;

data relating to the storage capacity of the entity (Ei) if this entity is a producer.

18. The system according to claim 10 , comprising a learning module (M 1 ) configured to determine a number of new electrical data on the electrical network and an operation of updating said at least one data model (MD 1 , MD 2 ) of the electrical network when enough acquired electrical data are available.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 7, 2018
From: VINOT, BENOIT; GAST, NICOLAS; CADOUX, FLORENT; HELIOT, RODOLPHE
To: SCHNEIDER ELECTRIC INDUSTRIES SAS
Reel/Frame 047529/0545 →
Priority Claims (1)
FR 17 58419 · Sep 12, 2017 · national
Continuity (1)
Related Publication 20190081478A1 · Mar 14, 2019