Method for heating a primary coolant in a nuclear steam supply system

Inventors: Krishna P. Singh (Hobe Sound, FL); Joseph Rajkumar (Cherry Hill, NJ)
G21D1/04G21C15/00G21C15/24G21C15/26G21D1/006G21C1/086
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,031,146
App. No.
16/126,100
Granted
Jun 8, 2021
Kind
B2
Abstract

A method for heating primary coolant in a nuclear supply system in one embodiment includes filling a primary coolant loop within a reactor vessel and a steam generating vessel that are fluidly coupled together with a primary coolant, drawing a portion of the primary coolant from the primary coolant loop and into a start-up sub-system, heating the portion of the primary coolant to form a heated portion of the primary coolant, and injecting the heated portion of the primary coolant back into the primary coolant loop. The primary coolant may be heated to a no-load operating temperature.

Claims (40)

1. A method of heating a primary coolant to a no-load operating temperature in a nuclear steam supply system, the method comprising:

a) filling a primary coolant loop within a reactor vessel and a steam generating vessel that are fluidly coupled together with a primary coolant;

b) drawing a portion of the primary coolant from the primary coolant loop;

c) heating the portion of the primary coolant to form a heated portion of the primary coolant; and

d) injecting the heated portion of the primary coolant into the primary coolant loop.

2. The method according to claim 1 , wherein step d) further comprises injecting the heated portion of the primary coolant directly into a riser pipe positioned within the steam generating vessel and fluidly coupled to the reactor vessel.

3. The method according to claim 2 , wherein step d) further comprises injecting the heated portion of the primary coolant directly into the riser pipe through an injection nozzle.

4. The method according to claim 3 , wherein the injection nozzle has an outlet positioned within the riser pipe for injecting the heated portion of the primary coolant directly into the riser pipe.

5. The method according to claim 3 , wherein the injection nozzle discharges the heated portion of the primary coolant into the riser pipe in a direction parallel to a flow of the primary coolant in the riser pipe.

6. The method according to claim 5 , wherein the injection nozzle discharges the heat portion of the primary coolant in a vertically upwards direction.

7. The method according to claim 5 , wherein the injection nozzle discharges the heated portion of the primary coolant into a bottom of the riser pipe.

8. The method according to claim 2 , wherein step b) comprises pumping the portion of the primary coolant from a bottom portion of the reactor vessel.

9. The method according to claim 8 , wherein step c) comprises flowing the portion of the primary coolant past at least one heating element of a heat exchanger to convert the portion of the primary coolant into the heated portion of the primary coolant.

10. The method according to claim 1 , wherein step d) results in the primary coolant flowing in the primary coolant loop in a first flow direction and wherein the primary coolant loop includes a riser pipe that is positioned within the steam generating vessel.

11. The method according to claim 10 , wherein step d) comprises injecting the heated portion of the primary coolant into the riser pipe in the first flow direction of the primary coolant.

12. The method according to claim 11 , wherein the primary coolant flows in the primary coolant loop at a first flow rate and wherein step d) comprises injecting the heated portion of the primary coolant into the primary coolant loop at a second flow rate, the second flow rate being greater than the first flow rate.

13. The method according to claim 11 , wherein the heated portion of the primary coolant mixes with the primary coolant within the primary coolant loop to form a mixed primary coolant, and wherein steps b) through d) proceed continuously until the mixed primary coolant reaches the no-load operating temperature.

14. The method according to claim 13 , wherein upon the mixed primary coolant reaching the no-load operating temperature, discontinuing steps b) through d) while the primary coolant passively flows in the primary coolant loop.

15. The method according to claim 13 , further comprising:

positioning nuclear fuel and a plurality of control rods within an internal cavity of the reactor vessel; and

wherein the mixed primary coolant is heated to the no-load operating temperature prior to any withdrawal of the control rods.

16. The method according to claim 13 , further comprising:

e) flowing a secondary coolant through a shell side of the steam generating vessel while the primary coolant flows through the primary coolant loop;

f) transferring heat from the primary coolant to the secondary coolant to change phase of the secondary coolant from liquid to steam; and

wherein the steam is retained within the shell side of the steam generating vessel until a desired pressure is reached.

17. The method according to claim 16 , wherein upon the desired pressure being reached, flowing at least a portion of the steam from the steam generating vessel to a steam turbine for generating electricity.

18. A method of heating a primary coolant to a no-load operating temperature in a nuclear steam supply system, the method comprising:

a) filling a primary coolant loop within a reactor vessel and a steam generating vessel that are fluidly coupled together with a primary coolant;

b) drawing a portion of the primary coolant from the primary coolant loop;

c) heating the portion of the primary coolant to form a heated portion of the primary coolant;

d) injecting the heated portion of the primary coolant into the primary coolant loop;

wherein upon injecting the heated portion of the primary coolant into the primary coolant loop, the injection causes the primary coolant to flow through the primary coolant loop which comprises:

e- 1 ) flowing the primary coolant in a first vertical direction through a riser column within the reactor vessel;

e- 2 ) flowing the primary coolant in a first lateral direction from the reactor vessel and into a riser pipe within the steam generating vessel;

e- 3 ) flowing the primary coolant in the first vertical direction through the riser pipe within the steam generating vessel;

e- 4 ) flowing the primary coolant in a second vertical direction through tubes in the steam generating vessel, the second vertical direction being opposite the first vertical direction;

e- 5 ) flowing the primary coolant in a second lateral direction from the tubes in the steam generating vessel into a downcomer within the reactor vessel; and

e- 6 ) flowing the primary coolant from the downcomer and into the riser column.

19. The method according to claim 18 , further comprising providing a start-up sub-system which comprises an intake pipe receiving the portion of the primary coolant from the primary coolant loop, a pump for pumping the portion of the primary coolant from the primary coolant loop and through the start-up sub-system, a heater for heating the portion of the primary coolant to form the heated primary coolant, and an injection nozzle positioned within the riser pipe in the steam generating vessel for injecting the heated primary coolant from the heater into the primary coolant loop.

20. The method according to claim 19 , wherein the injection nozzle has an outlet positioned within the riser pipe for injecting the heated portion of the primary coolant directly into the riser pipe.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 19, 2021
From: SMR, LLC
To: SMR INVENTEC, LLC
Reel/Frame 055958/0681 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 10, 2018
From: SINGH, KRISHNA P.; RAJKUMAR, JOSEPH
To: HOLTEC INTERNATIONAL, INC.
Reel/Frame 046826/0623 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 10, 2018
From: HOLTEC INTERNATIONAL, INC.
To: SMR, LLC
Reel/Frame 046826/0674 →
Continuity (4)
Division 14620390 · Feb 12, 2015
Continuation In Part PCTUS2013054961 · Aug 14, 2013
Provisional Application 61683021 · Aug 14, 2012
Related Publication 20190057789A1 · Feb 21, 2019
Cited By (1)
US 12,512,230