IP Library › Granted Patent US 11,421,525
Granted Patent B2
US 11,421,525 · App. 16/192,135 · Granted Aug 23, 2022

System and method of drilling a wellbore to a target

Inventors: Stefan Maus (Boulder, CO); Marc Ernest Willerth (San Luis Obispo, CA); Jarrod Shawn Deverse (Greenwood Village, CO)
Assignee: Magnetic Variation Services, LLC
E21B47/022E21B7/04E21B44/00E21B47/024E21B47/04
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,421,525
App. No.
16/192,135
Granted
Aug 23, 2022
Kind
B2
Abstract

A system and method of drilling a wellbore to a target may include measuring attitudes at two adjacent survey stations along a wellbore using a downhole surveying tool. An actual change in wellbore position over a survey leg linking the two survey stations may be determined. Corrections may be applied to the measured attitude at one or both of the survey stations such that an estimated well path joining the survey stations indicates the determined actual change in wellbore position between the two survey stations.

Claims (48)

1. A system, comprising:

a processor; and

memory media accessible to the processor storing instructions executable by the processor for drilling a wellbore to a target, the instructions comprising instructions for:

measuring attitudes at two adjacent survey stations along a wellbore using a downhole surveying tool, wherein the two adjacent survey stations comprise a first survey station and a second survey station;

determining an actual change in wellbore position over a survey leg linking the two adjacent survey stations; and

applying corrections to the measured attitude at one or both of the two adjacent survey stations, wherein applying corrections comprises estimating a position vector at the second survey station, wherein the position vector at the second survey station is based on a position vector of the first survey station and a dogleg angle of the survey leg linking the two adjacent survey stations; and

determining an estimated well path joining the adjacent survey stations based on the estimated position vector at the second survey station, wherein:

the estimated well path indicates the actual change determined in the wellbore position over the survey leg, and

the estimated well path is a circular arc computed by a minimum curvature method.

2. The system of claim 1 , wherein determining the actual change in the wellbore position further comprises determining the actual change using continuous survey measurements taken at least between the two adjacent survey stations during drilling of the wellbore.

3. The system of claim 1 , wherein determining the actual change in wellbore position comprises determining the actual change using continuous inclination angle measurements taken at least between the two adjacent survey stations during drilling of the wellbore.

4. The system of claim 1 , wherein determining the actual change in wellbore position comprises determining the actual change using depths and toolface directions defining slide intervals during drilling of the wellbore.

5. The system of claim 1 , wherein the corrections are applied to an inclination angle component of the measured attitude.

6. The system of claim 1 , wherein the estimated well path is dependent on the attitudes at the two survey stations, and wherein applying the corrections to the measured attitude further comprises applying corrections to the estimated well path.

7. The system of claim 1 , further comprising adjusting a trajectory of the wellbore using the corrected attitude and steering the wellbore using the adjusted trajectory.

8. The system of claim 1 , further comprising instructions for:

calculating at least one drilling parameter based on the estimated well path; and

using the at least one drilling parameter calculated to control steering during drilling of the wellbore.

9. A system, comprising:

a processor; and

memory media accessible to the processor storing instructions executable by the processor for drilling a wellbore to a target, the instructions comprising instructions for:

measuring attitudes at two adjacent survey stations along a wellbore using a downhole surveying tool;

determining an actual change in wellbore position over a survey leg linking the two adjacent survey stations; and

interpolating a notional survey station between the two adjacent survey stations, further comprising computing an attitude of the notional survey station, wherein two estimated well paths linking the two adjacent survey stations to the notional survey station indicate the determined actual change in wellbore position over the survey leg.

10. The system of claim 9 , wherein determining the actual change in wellbore position further comprises determining the actual change using continuous survey measurements taken at least between the two adjacent survey stations during drilling of the wellbore.

11. The system of claim 9 , wherein determining the actual change in wellbore position further comprises determining the actual change using continuous inclination angle measurements taken at least between the two adjacent survey stations during drilling of the wellbore.

12. The system of claim 9 , wherein determining the actual change in wellbore position further comprises determining the actual change using depths and toolface directions defining slide intervals during drilling of the wellbore.

13. The system of claim 9 , wherein the two estimated well paths are circular arcs computed by a minimum curvature method.

14. The system of claim 1 , further comprising instructions for:

calculating at least one drilling parameter based on the two estimated well paths; and

using the at least one drilling parameter calculated to control steering during drilling of the wellbore.

15. A system, comprising:

a processor; and

memory media accessible to the processor storing instructions executable by the processor for drilling a wellbore to a target, the instructions comprising instructions for:

measuring attitudes at least at two of consecutive first, second, and third survey stations along a wellbore using a downhole surveying tool;

determining an actual change in wellbore position between the first and third survey stations; and

applying corrections to the attitude at the second survey station, wherein:

applying corrections comprises interpolating between the first survey station and the third survey station by intersecting two estimated well paths at a corrected position of the second survey station to indicate the determined actual change in wellbore position between the first and third survey stations; and

the two estimated wed paths are circular arcs computed by a minimum curvature method.

16. The system of claim 15 , wherein determining the actual change in wellbore position further comprises determining the actual change in wellbore position between the first and third survey stations using continuous survey measurements taken during drilling of the wellbore.

17. The system of claim 15 , wherein determining the actual change in wellbore position further comprises determining the actual change in wellbore position between the first and third survey stations using continuous inclination angle measurements taken during drilling of the wellbore.

18. The system of claim 15 , wherein determining the actual change in wellbore position further comprises determining the actual change in wellbore position between the first and third survey stations using depths and toolface directions defining slide intervals during drilling of the wellbore.

19. The system of claim 15 , wherein the third survey station is a notional survey station determined by projecting the path of the wellbore ahead of the second survey station.

20. The system of claim 19 , wherein determining the actual change in wellbore position further comprises determining the actual change in wellbore position between the second and third survey stations using survey data excluding stationary survey measurements taken at the survey stations.

21. The system of claim 19 , wherein determining the actual change in wellbore position further comprises determining the actual change in wellbore position between the second and third survey stations using depths and toolface directions defining slide intervals during drilling of the wellbore.

22. The system of claim 15 , further comprising instructions for:

calculating at least one drilling parameter based on the two estimated well paths; and

using the at least one drilling parameter calculated to control steering during drilling of the wellbore.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 14, 2022
From: MAUS, STEFAN; WILLERTH, MARC ERNEST; DEVERSE, JARROD SHAWN
To: MAGNETIC VARIATION SERVICES, LLC
Reel/Frame 059907/0099 →
Continuity (4)
Continuation In Part 16097788
Provisional Application 62408622 · Oct 14, 2016
Provisional Application 62335078 · May 12, 2016
Related Publication 20190085680A1 · Mar 21, 2019
Cited By (2)
US 12,392,235 US 12,410,700