IP Library Granted Patent US 10,678,015
Granted Patent B1
US 10,678,015 · App. 16/210,779 · Granted Jun 9, 2020

Multi-tenant architecture

Inventor: Michael Measels (Huntsville, AL)
G02B6/46G02B6/255G02B6/4452G02B6/4453G02B6/4471H04B10/27
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,678,015
App. No.
16/210,779
Granted
Jun 9, 2020
Kind
B1
Abstract

A method for creating a network architecture, wherein network material is allocated for three tiers including future network clients, includes: a) Establishing active optical equipment within a central office; b) Connecting the central office to at least one Fiber Distribution Hub with at least one Distribution Cable having multiple fibers; c) Designating a portion of the multiple fibers of the distribution cable such that fibers are allotted specifically to tier 1 demand, tier 2 demand, and tier 3 future demand; d) Connecting at least one Fiber Distribution Hub to an intermediate splice closure (ISC) with at least one access fiber (AF) cable having multiple fibers; e) Splicing multi-port service terminal (MST) cable tails into at least one of the access fiber cables at the intermediate splice closure; f) Connecting at least one network interface device (NID) to the multi service terminal.

Claims (38)

1. A method for creating a network architecture wherein network material is allocated for three tiers including future network clients, the method including:

a) Establish active optical equipment within a central office;

b) Connecting the central office to at least one Fiber Distribution Flub with at least one Distribution Cable having multiple fibers;

c) Designating a portion of the multiple fibers of the distribution cable such that fibers are allotted specifically to tier 1 demand, tier 2 demand, and tier 3 future demand;

d) Connecting at least one Fiber Distribution Hub to an intermediate splice closure (ISC) with at least one access fiber (AF) cable having multiple fibers;

e) Splicing multi-port service terminal (MST) cable tails into at least one of the access fiber cables at the intermediate splice closure;

f) Connecting at least one network interface device (NID) to the multi service terminal.

2. The method of claim 1 wherein up to 6 fiber distribution hubs are connected to the central office.

3. The method of claim 2 wherein each distribution cable has 72 fibers and 36 fibers are used for tier 1 demand and tier 2 demand, and 36 fibers are designated for future tier 3 demand.

4. The method of claim 1 having 9 splitter cassettes wherein the splitter cassettes include splitters selected from the group consisting of 1:4 splitters, 1:8 splitters, and any combination thereof.

5. The method of claim 1 having 9 splitter cassettes wherein the distribution fiber cable is split into up to 144 fibers at the fiber distribution hub.

6. The method of claim 1 wherein up 36 fibers of the at least one distribution fiber cable can remain unsplit and be patched into the access fiber cable at the fiber distribution hub.

7. The method of claim 1 wherein the at least one fiber distribution hub can connect to a second fiber distribution hub through a distribution fiber cable.

8. The method of claim 7 wherein a distribution fiber cable connects the second fiber distribution huh to a distribution fiber cable intermediate splice closure for serving at least one multi-dwelling unit of greater than around 300 service tenants.

9. The method of claim 1 wherein an access fiber intermediate splice closure is connected to a Fiber Distribution Huh with at least one access fiber (AF) cable having multiple fibers, the access fiber intermediate splice closure designed to serve future multi dwelling units with between about 121 and 300 units.

10. The method of claim 9 wherein fibers arc patched directly into gray fibers of the access fiber cable and terminate at the access fiber intermediate splice closure.

11. The method of claim 1 wherein 2 to 30 fiber distribution hubs are connected to the central office and multiple fiber distribution hubs are connected to one or more other fiber distribution hubs.

12. The method of claim 1 wherein half or more distribution fibers from the central office are for future tier 3 use.

13. The method of claim 1 wherein access fiber cables are a mixture of split and unsplit fibers and up to three access fiber cables are distributed from the fiber distribution hub.

14. The method of claim 1 wherein multi-port service terminal (MST) cable tails and DLX cables are spliced into at least one of the access fiber cables at the intermediate splice closure, the DLX cables will only be spliced into those fibers of the AF cable designated for future use and unsplit at the fiber distribution hub.

15. The method of claim 1 wherein one DLX cable is left per 30 units for multi dwelling units with less than or equal to 120 units.

16. A method for creating a network architecture wherein network material is allocated for three tiers including future network clients, the method including:

a) Establishing active optical equipment within a central office;

b) Connecting the central office to at least one Fiber Distribution Hub with at least one Distribution Cable having multiple fibers;

c) Designating a portion of the multiple fibers of the distribution cable such that fibers are allotted specifically to tier 1 demand, tier 2 demand, and tier 3 future demand;

d) Connecting the at least one Fiber Distribution Hub to a second fiber distribution hub through a distribution fiber cable intermediate splice closure (ISC) with at least one access fiber (AF) cable having multiple fibers, the second fiber distribution hub further connected to a distribution fiber cable intermediate splice closure (DF ISC) for serving at least one multi-dwelling unit of greater than around 300 service tenants;

e) Connecting the at least one Fiber Distribution Huh to an access fiber intermediate splice closure with at least one access fiber (AF) cable having multiple fibers, the access fiber intermediate splice closure designed to serve future multi dwelling units with between about 121 and 300 units;

f) Connecting from the central office one of the at least one Fiber Distribution Hub to an intermediate splice closure (ISC) with at least one access fiber (AF) cable having multiple fibers;

g) Splicing multi-port service terminal (MST) cable tails into at least one of the access fiber cables at the intermediate splice closure;

h) Connecting at least one network interface device (NID) to the multi service terminal.

17. A method for creating a network architecture wherein network material is allocated for three tiers including future network clients, the method including:

a) Establish active optical equipment within a central office;

b) Connecting the central office to at least one Fiber Distribution Hub with at least one Distribution Cable having multiple fibers;

c) Designating a portion of the multiple fibers of the distribution cable such that fibers are allotted specifically to tier 1 demand, tier 2 demand, and tier 3 future demand; tier 1 demand comprising Single Family Units (SFU), 2) Multi Dwelling Unit (MDU), and Home Owners Associations (HOA) and tier 2 demand comprising VDF (video distribution frame), Traffic Controllers, Electric Locations, Gas Locations, Sites, Schools, Fiber Needs, AMI (Advanced metering infrastructure) Collectors, Advanced metering infrastructure (AMI) Routers and tier 3 comprising future demand;

d) Connecting at least one Fiber Distribution Huh to an intermediate splice closure (ISC) with at least one access fiber (AF) cable having multiple fibers;

e) Splicing multi-port service terminal (MST) cable tails into at least one of the access fiber cables at the intermediate splice closure:

f) Connecting at least one network interface device (NID) to the multi service terminal.

18. The method of claim 17 wherein about half of the multiple fibers of the distribution cable are allotted specifically to tier 3 future demand.

Assignments (5)
RELEASE OF SECURITY INTEREST Recorded Jul 18, 2023
From: KEYBANK NATIONAL ASSOCIATION
To: SSP MIDCO, LLC; SSP INNOVATIONS HOLDINGS, LLC; SSP-WIND LAKE, LLC; SSP INNOVATIONS, LLC; TADPOLE CARTESIA, INC.; 3-GIS, LLC
Reel/Frame 064302/0848 →
SECURITY AGREEMENT Recorded Jul 7, 2023
From: 3-GIS, LLC
To: PRINCIPAL GLOBAL INVESTORS, LLC, AS AGENT
Reel/Frame 064279/0106 →
SECURITY INTEREST Recorded Dec 28, 2020
From: SSP MIDCO, LLC; SSP INNOVATIONS HOLDINGS, LLC; SSP-WIND LAKE, LLC; SSP INNOVATIONS, LLC; TADPOLE CARTESIA, INC.; 3-GIS, LLC
To: KEYBANK NATIONAL ASSOCIATION
Reel/Frame 054754/0785 →
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNMENT COVER SHEET NATURE OF CONVEYANCE PORTION WHICH INCORRECTLY LISTED "SECURITY INTEREST" PREVIOUSLY RECORDED AT REEL: 054464 FRAME: 0228. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Dec 3, 2020
From: MEASELS, MICHAEL
To: 3-GIS, LLC
Reel/Frame 054586/0101 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 24, 2020
From: MEASELS, MICHAEL
To: 3-GIS, LLC
Reel/Frame 054464/0228 →
Continuity (2)
Continuation 15976356 · May 10, 2018
Provisional Application 62504101 · May 10, 2017
Cited By (4)
US 12,483,814 US 12,549,250 US 12,549,876 US 12,574,667