IP Library › Granted Patent US 10,790,552
Granted Patent B2
US 10,790,552 · App. 16/214,279 · Granted Sep 29, 2020

Battery system and capacity recovery method for lithium ion secondary battery

Inventors: Keisuke Isomura (Kariya, JP); Akira Kano (Toyota, JP)
Assignee: TOYOTA JIDOSHA KABUSHIKI KAISHA
H01M10/48H01M4/13H01M10/0525H01M10/0585H01M10/425H01M10/4242H01M10/44H01M10/46
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,790,552
App. No.
16/214,279
Granted
Sep 29, 2020
Kind
B2
Abstract

An ECU controls a PCU to perform capacity recovery control of recovering a capacity of an assembled battery. The capacity recovery control includes a discharge mode and a capacity recovery mode. In the discharge mode, the ECU discharges the assembled battery to a predetermined overdischarge region. In the capacity recovery mode, the ECU repeatedly performs, in the overdischarge region, a voltage increase of increasing a voltage across a lithium ion secondary battery due to a stop of the discharging and a pulse discharge of discharging the lithium ion secondary battery while oscillating a discharge current.

Claims (26)

1. A battery system comprising:

a lithium ion secondary battery including a positive-electrode active material layer and a negative-electrode active material layer disposed with a separator therebetween;

a charging and discharging device configured to charge and discharge the lithium ion secondary battery; and

a controller configured to control the charging and discharging device to perform capacity recovery control of recovering a capacity of the lithium ion secondary battery,

the negative-electrode active material layer including

a facing portion that faces the positive-electrode active material layer, and

a non-facing portion that does not face the positive-electrode active material layer,

the capacity recovery control including

first control of discharging the lithium ion secondary battery to a predetermined overdischarge region, and

second control of repeatedly performing, in the predetermined overdischarge region,

a voltage increase of increasing a voltage across the lithium ion secondary battery due to a stop of the discharging, and

a pulse discharge of discharging the lithium ion secondary battery while oscillating a discharge current.

2. The battery system according to claim 1 , wherein the second control is performed in a range in which the voltage across the lithium ion secondary battery does not fall below a predetermined lower-limit voltage.

3. The battery system according to claim 1 , wherein an oscillation frequency of the discharging current in the pulse discharge is 3 kHz to 20 kHz.

4. The battery system according to claim 1 , wherein the capacity recovery control is performed under a condition that a temperature of the lithium ion secondary battery is 40° C. to 80° C.

5. The battery system according to claim 1 , wherein the predetermined overdischarge region is a region in which a state of charge (SOC) of the lithium ion secondary battery is 0% or less.

6. A capacity recovery method for a lithium ion secondary battery,

the lithium ion secondary battery including a positive-electrode active material layer and a negative-electrode active material layer disposed with a separator therebetween,

the negative-electrode active material layer including

a facing portion that faces the positive-electrode active material layer, and

a non-facing portion that does not face the positive-electrode active material layer,

the capacity recovery method comprising:

discharging the lithium ion secondary battery to a predetermined overdischarge region; and

repeatedly performing, in the predetermined overdischarge region,

a voltage increase of increasing a voltage across the lithium ion secondary battery due to a stop of the discharging, and

a pulse discharge of discharging the lithium ion secondary battery while oscillating a discharge current.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 10, 2018
From: ISOMURA, KEISUKE; KANO, AKIRA
To: TOYOTA JIDOSHA KABUSHIKI KAISHA
Reel/Frame 047729/0707 →
Priority Claims (1)
JP 2017-239400 · Dec 14, 2017 · national
Continuity (1)
Related Publication 20190190089A1 · Jun 20, 2019
Cited By (2)
US 12,573,867 US 12,658,487