IP Library Granted Patent US 11,255,485
Granted Patent B2
US 11,255,485 · App. 16/219,403 · Granted Feb 22, 2022

System and method for priority CNG filling

Inventors: Richard Allan Poorman (Diana, TX); Paul Howison Bergthold (Longview, TX); Bradley Wade Fontenot (Longview, TX)
F17C5/06F17C5/007F17C13/025F17C2205/0142F17C2205/0323F17C2221/033F17C2223/0123F17C2223/036F17C2225/0123F17C2225/036F17C2227/0157F17C2227/043F17C2250/032F17C2250/0443F17C2250/0473F17C2260/025F17C2265/065F17C2270/0139F17C2270/0168
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,255,485
App. No.
16/219,403
Granted
Feb 22, 2022
Kind
B2
Abstract

A method of dispensing compressed natural gas (CNG) includes assigning a first priority to the filling of a first destination tank and assigning a second priority to the filling of a second destination tank. The second priority is lower than the first priority. The method also includes filling the first destination tank from a first CNG source while filling the second destination tank from a second CNG source. The second CNG source provides CNG at a lower pressure relative to the pressure at which the first CNG source provides CNG.

Claims (33)

1. A method of dispensing compressed natural gas (CNG), comprising:

assigning a first priority to the filling of a first destination tank;

assigning a second priority to the filling of a second destination tank, wherein the second priority is lower than the first priority; and

controlling valves within a first dispenser to fill the first destination tank from a first CNG source while controlling valves within a second dispenser to fill the second destination tank from a second CNG source, wherein the second CNG source provides CNG at a lower pressure relative to the pressure at which the first CNG source provides CNG;

wherein each of the first dispenser and the second dispenser are selectively exclusively fed from either of the first CNG source and the second CNG source and each at a full pressure of the first CNG source and second CNG source.

2. The method of claim 1 , further comprising:

in response to the completion of filling the first destination tank, discontinuing filling the second destination tank from the second CNG source and beginning filling the second destination tank from the first CNG source.

3. The method of claim 1 , wherein the first CNG source and the second CNG source are both storage tanks.

4. The method of claim 1 , wherein at least one of the first CNG source and the second CNG source is a compressor.

5. The method of claim 1 , wherein at least one of the first destination tank and the second destination tank is a vehicle tank.

6. The method of claim 1 , wherein at least one of the first destination tank and the second destination tank is a mobile trailer tank.

7. The method of claim 1 , further comprising:

assigning a third priority to the filling of a third destination tank.

8. The method of claim 7 , wherein the third priority is lower than the second priority.

9. The method of claim 8 , further comprising:

filling the third destination tank from a third CNG source while filling the second destination tank from the second CNG source, wherein the third CNG source provides CNG at a lower pressure relative to the pressure at which the second CNG source provides CNG, wherein the third dispenser is selectively exclusively fed at a full pressure of the third CNG source.

10. A compressed natural gas (CNG) dispensing system, comprising:

a first CNG source;

a second CNG source;

a first dispenser;

a second dispenser; and

a controller, the controller configured to (1) assign a first priority to the filling of a first destination tank associated with the first dispenser, (2) assign a second priority to the filling of a second destination tank associated with the second dispenser, wherein the second priority is lower than the first priority, and (3) control the first dispenser and the second dispenser to fill the first destination tank from the first CNG source while filling the second destination tank from the second CNG source, wherein the second CNG source provides CNG at a lower pressure relative to the pressure at which the first CNG source provides CNG;

wherein the controlling the first dispenser and the second dispenser comprises controlling valves within the first dispenser and valves within the second dispenser; and

wherein the first dispenser and the second dispenser are configured to be exclusively fed by either of the first CNG source and the second CNG source.

11. The system of claim 10 , wherein, in response to the completion of filling the first destination tank, discontinuing filling the second destination tank from the second CNG source and beginning filling the second destination tank from the first CNG source.

12. The system of claim 10 , wherein the first CNG source and the second CNG source are both storage tanks.

13. The system of claim 10 , wherein at least one of the first CNG source and the second CNG source is a compressor.

14. The system of claim 10 , wherein at least one of the first destination tank and the second destination tank is a vehicle tank.

15. The system of claim 10 , wherein at least one of the first destination tank and the second destination tank is a mobile trailer tank.

16. The system of claim 10 , wherein the controller is further configured to assign a third priority to the filling of a third destination tank.

17. The system of claim 16 , wherein the third priority is lower than the second priority.

18. The system of claim 17 , further comprising:

filling the third destination tank exclusively from a third CNG source while filling the second destination tank from the second CNG source, wherein the third CNG source provides CNG at a lower pressure relative to the pressure at which the second CNG source provides CNG.

Assignments (2)
RELEASE OF SECURITY INTEREST IN INTELLECTUAL PROPERTY RECORDED AT RF 060842/0429 Recorded Jan 12, 2026
From: TEXAS CAPITAL BANK
To: J-W POWER COMPANY
Reel/Frame 074331/0174 →
SECURITY INTEREST Recorded Aug 18, 2022
From: J-W POWER COMPANY
To: TEXAS CAPITAL BANK
Reel/Frame 060842/0429 →
Continuity (2)
Provisional Application 62598421 · Dec 13, 2017
Related Publication 20190178447A1 · Jun 13, 2019
Cited By (2)
US 12,331,886 US 12,545,847