IP Library Granted Patent US 11,035,768
Granted Patent B2
US 11,035,768 · App. 16/219,437 · Granted Jun 15, 2021

Early warning system for error detection in nitrogen generators

Inventor: Scott Christian Bodemann (Wilmington, NC)
Assignee: South-Tek Systems, LLC
G01N7/14A62C35/645A62C35/68A62C99/0018G05B19/042G05B23/027
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,035,768
App. No.
16/219,437
Granted
Jun 15, 2021
Kind
B2
Abstract

In a nitrogen generator, multiple, concurrent gas pressure monitors constantly and simultaneously monitor gas pressures at key points in the nitrogen generation process, and a controller generates an alarm when the pressure at any point falls below a respective predetermined pressure level, and remains there for longer than a respective predetermined duration. In some embodiments, a run time of the nitrogen separation unit is additionally monitored. Additionally, in some embodiments, if the output pressure of nitrogen gas falls below a predetermined pressure level, a bypass route is activated to route compressed air directly to the output, thus sacrificing nitrogen gas purity but maintaining required minimum pressure for downstream systems.

Claims (35)

1. A nitrogen generator, comprising:

a compressed air inlet adapted to be connected to an air compressor, and to receive compressed air;

a gas pressure monitor connected to the inlet;

an air dryer operative to remove moisture from the compressed air received at the compressed air inlet;

a gas pressure monitor connected to an output of the air dryer;

a nitrogen separation unit operative to separate nitrogen gas from the dried, compressed air, and to pass the nitrogen gas to a nitrogen gas output;

a gas pressure monitor connected to the nitrogen gas output; and

a controller connected to the gas pressure monitors, and adapted to generate an alarm if any monitored gas pressure falls below a respective predetermined pressure level for greater than a respective predetermined duration.

2. The nitrogen generator of claim 1 wherein the nitrogen separation unit comprises one of a membrane, and one or more carbon molecular sieve (CMS) beds.

3. The nitrogen generator of claim 2 wherein the controller is further adapted to monitor a run time of the nitrogen separation unit, and to generate an alarm if the run time exceeds a predetermined maximum continuous run time duration.

4. The nitrogen generator of claim 3 further comprising

a bypass valve between the air dryer and the nitrogen separation unit; and

a bypass air path connecting the bypass valve to the nitrogen gas output and bypassing the nitrogen separation unit; and

wherein the controller is further adapted to open the bypass valve and route dried, compressed air directly to the nitrogen gas output in response to either the gas pressure at the nitrogen gas output falling below the respective predetermined pressure level or the nitrogen separation unit run time exceeding the predetermined maximum continuous run time duration.

5. The nitrogen generator of claim 3 wherein the controller is connected to a display, and wherein generating an alarm comprises displaying an alarm message on the display.

6. The nitrogen generator of claim 5 wherein the controller further comprises non-volatile memory, and wherein generating an alarm further comprises logging a record of the pressure loss or run time violation to the non-volatile memory.

7. The nitrogen generator of claim 1 wherein the predetermined pressure levels for all gas pressure monitors are the same.

8. The nitrogen generator of claim 1 wherein a first predetermined pressure level for at least a first gas pressure monitor is different than a second predetermined pressure level for a second gas pressure monitor.

9. The nitrogen generator of claim 1 wherein the predetermined durations for all gas pressure monitors are the same.

10. The nitrogen generator of claim 9 wherein the predetermined durations are 30 seconds.

11. The nitrogen generator of claim 1 wherein a first predetermined duration for at least a first gas pressure monitor is different than a second predetermined duration for a second gas pressure monitor.

12. The nitrogen generator of claim 1 wherein at least one gas pressure monitor comprises a preset or adjustable pressure switch adapted to actuate at the predetermined pressure level.

13. The nitrogen generator of claim 12 wherein the pressure switch actuating causes a voltage to be applied to a corresponding input of the controller.

14. A method of operating a nitrogen generator comprising a compressed air inlet adapted to be connected to an air compressor and to receive compressed air, an air dryer operative to remove moisture from the compressed air received at the compressed air inlet, a nitrogen separation unit operative to separate nitrogen gas from the dried air and to pass the nitrogen gas to a nitrogen gas output, a plurality of gas pressure monitors, and a controller, the method comprising:

monitoring a gas pressure at the compressed air inlet;

monitoring a gas pressure between the air dryer and the nitrogen separation unit;

monitoring a gas pressure at the nitrogen gas output; and

generating an alarm if any monitored gas pressure falls below a respective predetermined pressure level for greater than a respective predetermined duration.

15. The method of claim 14 further comprising monitoring a run time of the nitrogen separation unit, and generating an alarm if the run time exceeds a predetermined maximum continuous run time duration.

16. The method of claim 15 wherein the nitrogen generator further comprises a bypass valve between the compressed air inlet and the air dryer and a bypass air path connecting the bypass valve to the nitrogen gas output and bypassing the air dryer and nitrogen separation unit, the method further comprising:

opening the bypass valve and routing compressed air directly to the nitrogen gas output in response to either the gas pressure at the nitrogen gas output falling below the respective predetermined pressure level or the nitrogen separation unit run time exceeding the predetermined maximum continuous run time duration.

17. The method of claim 16 wherein the controller is connected to a display, and wherein generating an alarm comprises displaying an alarm message on the display.

18. The method of claim 14 wherein the predetermined durations are all 30 seconds.

19. The method of claim 14 wherein at least one gas pressure monitor comprises a preset or adjustable pressure switch adapted to actuate at the predetermined pressure level.

20. The method of claim 19 wherein the pressure switch actuating causes a voltage to be applied to a corresponding input of the controller.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 13, 2018
From: BODEMANN, SCOTT CHRISTIAN
To: SOUTH-TEK SYSTEMS, LLC
Reel/Frame 047771/0060 →
Continuity (2)
Provisional Application 62598115 · Dec 13, 2017
Related Publication 20190178768A1 · Jun 13, 2019