IP Library Granted Patent US 10,704,385
Granted Patent B2
US 10,704,385 · App. 16/251,120 · Granted Jul 7, 2020

Modelling electromagnetic telemetry signals in deviated wells

Inventors: Jiuping Chen (San Pablo, CA); Gaelle Jannin (Houston, TX); Liang Sun (Katy, TX)
Assignee: SCHLUMBERGER TECHNOLOGY CORPORATION
E21B47/122E21B7/10G01V3/02G01V3/12G01V3/30H04B17/391H04B17/3912
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,704,385
App. No.
16/251,120
Granted
Jul 7, 2020
Kind
B2
Abstract

A method for modeling an electromagnetic (EM) telemetry signal includes straightening a well in a model and dividing the well into a plurality of segments. The method also includes determining an electrical current in one or more of the segments when the well is straightened. The method also includes replacing the well with equivalent electrical sources based at least partially upon the electrical current in one or more of the segments. The method also includes bending the well back into its original shape in the model and determining the electrical current in one or more of the segments by projection when the well is back in its original shape. The method also includes summing EM fields for each of the one or more segments to estimate the EM telemetry signal.

Claims (51)

1. A method for modeling an electromagnetic (EM) telemetry signal, comprising:

straightening a well in a model;

dividing the well into a plurality of segments;

determining an electrical current in one or more of the plurality of segments when the well is straightened;

replacing the well with equivalent electrical sources based at least partially upon the electrical current in the one or more of the plurality of segments;

bending the well back into its original shape in the model;

determining an electrical current in the one or more of the plurality of segments by projection when the well is back in its original shape; and

summing EM fields for each of the one or more of the plurality of segments, based at least partially upon the electrical current in the one or more of the plurality of segments when the well is back in its original shape, to estimate the EM telemetry signal.

2. The method of claim 1 , wherein the well is substantially vertical when straightened.

3. The method of claim 1 , further comprising simulating the EM telemetry signal from a transmitter in the well, which generates the electrical current in the one or more of the plurality of segments when the well is straightened.

4. The method of claim 1 , wherein the equivalent electrical sources comprise electric dipoles.

5. The method of claim 1 , wherein the electrical current in the one or more of the plurality of segments when the well is back in its original shape is determined based at least partially upon an azimuthal angle, an inclination angle, or both for the one or more of the plurality of segments when the well is back in its original shape.

6. The method of claim 1 , further comprising performing an EM telemetry measurement-while-drilling (MWD) job in response to the estimated EM telemetry signal.

7. A method for modeling an electromagnetic (EM) telemetry signal, comprising:

replacing a first well with equivalent electrical sources in a model;

determining an electrical current in one or more segments in the first well based at least partially upon the equivalent electrical sources;

generating a simulated electrical current in a second well;

determining a normalized voltage in the one or more segments in the first well in response to the simulated electrical current in the second well;

determining a segment voltage in the one or more segments in the first well based at least partially upon the electrical current of the one or more segments in the first well and the normalized voltage of the one or more segments in the first well; and

estimating the EM telemetry signal from a transmitter in the first well based at least partially upon the segment voltages of the one or more segments in the first well.

8. The method of claim 7 , wherein replacing the first well with the equivalent electrical sources in the model comprises:

straightening the first well in the model;

dividing the first well into the one or more segments; and

determining the electrical current in the one or more of the segments in the first well when the first well is straightened.

9. The method of claim 8 , wherein electrical currents in the equivalent electrical sources are determined in the one or more of the segments in the first well when the first well is straightened.

10. The method of claim 8 , wherein replacing the first well with the equivalent electrical sources in the model further comprises:

bending the first well back into its original shape in the model; and

determining an electrical current in the one or more of the segments in the first well by projection when the first well is back in its original shape.

11. The method of claim 7 , wherein determining the segment voltage in the one or more segments in the first well comprises multiplying the electrical current in the one or more segments in the first well by the normalized voltage in the one or more segments in the first well.

12. The method of claim 7 , wherein estimating the EM telemetry signal comprises summing the segment voltages for the one or more segments in the first well.

13. The method of claim 7 , wherein the EM telemetry signal is estimated at a sensor in the second well.

14. The method of claim 7 , wherein the second well comprises a metallic casing.

15. The method of claim 7 , wherein the equivalent electrical sources comprise electric dipoles.

16. The method of claim 7 , further comprising drilling the first well in response to the estimated EM telemetry signal.

17. A computing system comprising:

one or more processors; and

a memory system comprising one or more non-transitory computer-readable media storing instructions that, when executed by at least one of the one or more processors, cause the computing system to perform operations, the operations comprising:

replacing a first well with equivalent electrical sources in a model;

determining an electrical current in one or more segments in the first well based at least partially upon the equivalent electrical sources;

generating a simulated electrical current in a second well;

determining a normalized voltage in the one or more segments in the first well in response to the simulated electrical current in the second well;

determining a segment voltage in the one or more segments in the first well based at least partially upon the electrical current of the one or more segments in the first well and the normalized voltage of the one or more segments in the first well; and

estimating an electromagnetic (EM) telemetry signal from a transmitter in the first well based at least partially upon the segment voltages of the one or more segments in the first well.

18. The computing system of claim 17 , wherein replacing the first well with the equivalent electrical sources in the model comprises:

straightening the first well in the model;

dividing the first well into the one or more segments;

determining the electrical current in the one or more of the segments in the first well when the first well is straightened;

bending the first well back into its original shape in the model; and

determining an electrical current in the one or more of the segments in the first well by projection when the first well is back in its original shape.

19. The computing system of claim 17 , wherein determining the segment voltage in the one or more segments in the first well comprises multiplying the electrical current in the one or more segments in the first well by the normalized voltage in the one or more segments in the first well.

20. The computing system of claim 17 , wherein the operations further comprise performing an EM telemetry measurement-while-drilling (MWD) job in response to the estimated EM telemetry signal.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 18, 2019
From: CHEN, JIUPING; JANNIN, GAELLE; SUN, LIANG
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 048358/0604 →
Continuity (2)
Provisional Application 62619184 · Jan 19, 2018
Related Publication 20190226328A1 · Jul 25, 2019
Cited By (1)
US 12,590,535